Sol_140P4326R0032_Amd_0001.pdf
PDF 4 MB Posted
- Solicitation number
- 140P4326R0032
About this file
This is Amendment 0001 to Request for Quote (RFQ) 140P4326R0032 issued by the National Park Service (NPS) Northeast Region for re-striping pavement markings at Acadia National Park in Bar Harbor, Maine. The amendment is effective August 20, 2026, with a performance period of October 1, 2026, through September 30, 2027. The contracting office is located at Boston National Historical Park, Charlestown Navy Yard, Building I-1, Boston, MA 02129-4543, administered by Jason Albright.
The amendment provides responses to six questions received during the solicitation process and supplies the list of attendees to the organized pre-bid site visit held on September 1, 2026, at 10:00 am EDT. Key clarifications include: roadways not shown on individual plan sheets should be striped as typical for that roadway, matching neighboring sheets and existing striping; several locations include new markings as identified in drawings with existing markings to be repainted to match; limited markings not identified for repainting should be removed using water blasting as the preferred method; night work is permissible if included in the proposal's means and methods; water-based paint as specified in project requirements is mandatory, with no substitution of cold-weather solvent-based paint permitted; and work can occur in seasonally closed areas with arranged access. The pre-bid site visit roster includes representatives from NPS, McKenzie Construction, Newman's Geotechnical Services LLC, and Ware Construction Services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jason Albright
See continuation page
NPS, NER - NE MABO
Boston National Historical Park Charlestown Navy Yard Building I-1 Boston MA 02129-4543
PNN
140P4326R0032
08/20/2026
08/20/2026
1 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P4326R0032/0001
Acadia National Park - Re-Stripe Pavement
Markings
The purpose of this amendment is to provide a response to all questions received, and to provide the list of attendees to the organized site-visit.
Period of Performance: 10/01/2026 to
09/30/2027
Request for Quote Number 140P4326R0032 Re-Stripe Pavement Markings at Acadia National Park Amendment 0001
DESCRIPTION OF AMENDMENT/MODIFICATION
The following are a list of questions received for the Solicitation Number 140P4326R0032, Re-Stripe Pavement Markings at Acadia National Park.
1) Do all striping areas have their own plan sheet? For example, the cover sheet shows the entire perimeter of the park, however there are locations within that region that are not shown on their own individual plansheet.
Answer: No, all striping areas do not have their own plan sheet. Between shown sheets, roadways should be striped as is typical for that roadway, matching the roadway striping shown on neighboring sheets and matching existing striping.
2) Are there new roadway markings in the package?
Answer: Yes, there are several locations that include new markings as identified in drawings. Existing markings should be repainted overtop to directly match
3) For those existing roadway markings that are not indicated in the drawings for repainting, should they be removed? If removal is required, what methods are considered acceptable for this process?
Answer: Yes, there are a limited number of markings that are on roadway that are not identified to be repainted. Those marking should be removed. Water blasting is the preferred method of removal.
4) Is night work allowed?
Answer: Proposal package should include means and methods to accomplish work.
However, the park is open to the idea of night work.
5) Is it permissible under the contract to use cold-weather, solvent-based paint, even though this type is not specified in the project requirements?
Answer: No, use of the water-based paint outlined in the specs is required.
Request for Quote Number 140P4326R0032 Re-Stripe Pavement Markings at Acadia National Park Amendment 0001
6) Will the park allow work to occur in areas closed to the public seasonally?
Answer: Yes, conditions permitting, access can be arranged to areas that are seasonally closed to vehicle access. See following map:
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .