B08_Solicitation_Attachment_1_IDIQ_SOW.pdf

PDF 172 KB Posted

Attached to
Technical Assistance and Administrative Support Federal contract opportunity
Solicitation number
140A1625R0032
Issued by
Department of the Interior Bureau of Indian Affairs Central Office

About this file

This is a Statement of Work (SOW) for Technical Assistance and Administrative Support Services for the Bureau of Indian Affairs (BIA) Division of Water and Power (DWP). The SOW requires a contractor to provide comprehensive technical and administrative support across three primary branches: Safety of Dams, Irrigation and Power, and Water Resources. Key services include strategic planning, technical engineering services, program support, geospatial support, accounting assistance, and specialized information management for irrigation, dam safety, and water resource programs.

The contract scope encompasses supporting DWP's mission of promoting self-determination, economic opportunities, and public safety through management of irrigation, dam, and power facilities. The contractor will provide personnel with expertise in engineering, physical sciences, management, and support roles, with key personnel required to be located on-site at DWP offices in Lakewood, CO. The contract includes provisions for travel (primarily within the continental US), other direct charges, and monthly reporting requirements. Contractor personnel must be US citizens and pass security clearance procedures, with the sensitivity level designated as Level 6C – High Risk Public Trust.

View the file

Other files for this federal contract opportunity

Other files attached to Technical Assistance and Administrative Support, newest first.
File Type Posted
B09_Solicitation_Amendment_0002_SF33_Continuation_Pages_0002.docx DOCX document
B09_Solicitation_Amendment_0002_QnA_0002.docx DOCX document
Sol_140A1625R0032_Amd_0002.pdf PDF
Sol_140A1625R0032_Amd_0001.pdf PDF
Sol_140A1625R0032.pdf PDF
B08_Solicitation_Attachment_2_IDIQ_Pricing.xlsx XLSX spreadsheet
B08_Solicitation_Attachment_3_IDIQ_Labor_Category_Descriptions.pdf PDF
B08_Solicitation_Attachment_4_IA_IEE_Representation_Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Indian Affairs (BIA) Office of Trust Services, Division of Water and Power

Technical Assistance & Administrative Support Services Statement of Work

1.0 INTRODUCTION

The Bureau of Indian Affairs (BIA) Division of Water and Power (DWP) requires support services to assist in all aspects of the DWP mission. DWP comprises three Branches, the Branch of Irrigation and Power (BIP), the Safety of Dams Branch (SOD) and the Branch of Water Resources (BWR). The required support includes general administrative and technical expertise with regard to DWP processes and functions. The contractor shall provide technical expertise across a broad range of technologies and disciplines.

It is the mission of the DWP to promote self-determination, economic opportunities, and public safety through the sound management of irrigation, dam, and power facilities owned or operated by the BIA. In support of this mission, DWP is committed to the following:

● Providing quality services and improved accountability, including protecting and preserving life, property, and trust resources.

● Assisting tribes in the management of water resources through measurement, analysis, and modeling.

● Promoting the transfer of management, administration, operation, maintenance, and rehabilitation of irrigation, dam, and power facilities to tribes, irrigators, and water user associations.

● Fostering communication, cooperation, and consultation among Federal, State, tribal, and local organizations related to water resources, irrigation, power, dam safety, security, and emergency management activities.

● Hiring, training, and retaining highly qualified personnel to manage, operate, maintain, construct, and rehabilitate DWP infrastructure (and to conduct financial matters that support these activities).

● Promoting state-of-the-art technologies to improve the management and conservation of water resources in a sustainable manner, while maximizing economic benefits.

● Encouraging modern business practices and innovative business techniques to meet the ever-changing needs of our mission.

The DWP is responsible for the management, operation, maintenance, rehabilitation, asset management, and Operations and Maintenance (O&M) billing and collection of BIA-owned irrigation and power projects; and under the Safety of Dams (SOD) program, for maintenance and rehabilitation of dams on Indian lands. The DWP is also responsible for providing policy, oversight, advisory, and technical support to BIA regions, agencies, and projects on water resources, irrigation, power, SOD, and Federal Energy Regulatory Commission (FERC) hydropower licensing and re-licensing.

Safety of Dam Branch:

The mission of the SOD program is to ensure dams are adequately maintained, managed, and monitored to reduce the potential loss of human life and property damage resulting from dam failures. Furthermore, the BIA SOD program endeavors to ensure that program dams are maintained in satisfactory condition on a long-term basis and to promote awareness and access to the beneficial uses achieved through public investments in BIA dam infrastructure. These dams comprise a significant part of the water resources infrastructure and trust assets for the various Indian reservations.

The portfolio of SOD program dams is managed using a risk-informed approach. The primary emphasis is to protect downstream residents from undue risks, utilizing a risk-informed decision process to prioritize risk-reduction actions. Continuous and periodic dam inspections and evaluations are critical to an effective SOD program. The robust risk-informed approach is a best practice adopted to develop balanced and informed assessments of the safety of program dams and to evaluate, prioritize, and justify dam safety decisions.

Key SOD program activities include:

Risk Management and Risk Reduction: To effectively utilize SOD Program resources, a risk-informed approach is used to prioritize dam safety assessments, to aid in decision making, to protect downstream populations from the consequences of dam failure, to support justification for risk-reduction actions where needed, and to prioritize funding for SOD projects. Risk-reduction actions include repair and rehabilitation to address static, seismic, and/or hydrologic potential failure modes.

Emergency Management (EM) and Early Warning Systems (EWSs): EM helps reduce the likelihood of life loss and damage to property from a dam failure. EWSs and EAPs are developed, implemented, and maintained. The BIA conducts tabletop and functional exercises of all EAPs on a regular basis. The program is responsible for installing and maintaining EWSs on dams. With the assistance of Tribes, BIA has installed an EWS on nearly all BIA Program dams across the United States. The EWSs are currently connected to the BIA’s National Monitoring Center (NMC) in Ronan, Montana. This facility is operated by the Confederated Salish and Kootenai Tribes on the Flathead Indian Reservation.

Inspections and Evaluations: These activities provide key information necessary to determine the overall condition of dams. BIA schedules annual inspections in addition to Periodic Reviews (PRs), and Comprehensive Reviews (CRs) on rotating 10-year cycles. Risk assessments integrate the analytical methods of risk analysis along with the sound professional judgment of engineers, architect and engineer (A/E) consultants, and review boards to determine reasonable actions which will minimize risk at BIA facilities.

Maintenance and Repairs: Recurring maintenance and repairs are performed to keep dams from deteriorating into an unsafe condition. Annual maintenance is performed on EWS facilities and repairs are made on dams with critical repair needs.

Security: Security assessments are performed to ensure adequate security for key dam facilities and structures against credible threats. Appropriate protective measures are implemented.

Branch of Irrigation and Power:

The mission of the BIA Office of Trust Services, DWP is to support self-determination, economic opportunities, and public safety through the sound management of irrigation, dam, and power facilities under its jurisdiction. The goal of the Indian Irrigation Program is to improve the management of land and natural resource assets through the delivery of water consistent with applicable state and Federal law, in an environmentally responsible and cost-efficient manner.

Indian Affairs has seventeen BIA Indian Irrigation Projects in its asset inventory, which deliver water to over 780,000 acres, through 6,000 miles of canals and more than 52,000 irrigation structures. Fifteen of the Indian Irrigation Projects are revenue-generating, in which they derive all or part of their operating funds from annual assessments to irrigation customers. The annual receipt funds for the fifteen revenue-generating Indian Irrigation Projects are approximately $36 million (FY18). Due in large part to the age of the infrastructure and lack of funding, significant deferred maintenance has accrued and is estimated to be $791 million (FY19).

The BIA has three power utilities, Colorado River Agency – Electrical Services (CRAES), San Carlos Irrigation Project (SCIP) – Power Division and Mission Valley Power (MVP). The power projects operate and maintain distribution systems, similar to electrical cooperatives. All three power projects rely 100% on revenues from users. SCIP and CRAES are federal power projects located in Arizona operated by the BIA. MVP is a federal power project located in western Montana operated under a P.L. 93-638 contract with the Confederated Salish and Kootenai Tribes. All three utilities were originally constructed as part of their associated irrigation projects but are currently operated separately from the irrigation projects.

The Mission of the three utilities is to provide economical, reliable, and available electrical power for residential and commercial use as well as a development tool for tribal self-determination projects by their associated tribes. They accomplish this mission by providing electric services throughout the respective Reservations, serving both Native and non-Indian constituents.

Key Irrigation and Power program support activities include:

O&M Billing, Collection and Rate Setting: The National Irrigation Information Management System (NIIMS) provides billing, collection, and rate setting functionality and support activities for 16 Indian Irrigation Projects, primarily using contract staff. The ability for water users to submit payments via credit cards and electronic funds transfer has been provided through Treasury's pay.gov system. Scanning of checks through Treasury's OTCnet module enables faster posting of payments as well as increasing internal controls. Contractor support includes technical accounting, administrative support including all billing and collection related activities.

Asset Management: All facility management reporting for the DWP, including deferred maintenance, is conducted using Maximo, an industry-leading state-of-the-art solution for property and maintenance management. This tool is being fully deployed for irrigation projects, power projects, and dams. Its primary focus is the management of real property assets and will be accomplished in part through implementation of the MAXIMO® Asset Management System.

Maximo system software is the Departmental required standard for asset and facility maintenance management.

Decision Support Systems: Contract staff is key in the development and ongoing maintenance of Decision Support tools that integrate geospatial data with funding updates, completion status, failure impacts, Maximo information, existing reports, and other data sets supporting DWP Programs.

Technical Assistance: DWP provides technical assistance and Program oversight in a variety of areas including tracking the 6,000 miles of canals and more than 52,000 irrigation structures, support for the 17 Indian Irrigation Projects and three BIA Power Utilities, map development, Program Reviews, funds management, and integrating a variety of information for decision support. Technical contractor expertise is critical to the success of the program.

Branch of Water Resources:

The mission of the BIA Branch of Water Resources is to provide the necessary technical research, studies, and other information for Indian Tribes and Alaskan Natives to serve as informed and prudent managers of adjudicated decreed or of water otherwise appurtenant to tribal and or Indian trust lands including public domain allotments.

Key Water Resources programs include:

Water Rights Negotiations/Litigation Services: The Water Rights Negotiations/Litigation program is intended to provide technical consultation, and administrative cost support for tribes engaged in the protection of Indian Water Rights. The BIA staff coordinates with the United States Department of Justice, the Department of Interior, Office of the Solicitor, and the Secretary’s Indian Water Rights Office on actions taken in pursuit of litigation/ settlement resolution.

This program provides the major financial support for the United States to assert and defend Indian water rights claims. The funds are used by the United States and tribes for activities associated with establishing and protecting Indian water rights through negotiations and/or litigation. Program funding is critical for supporting and advancing on-going Indian water rights litigation cases as well as Federal and tribal negotiations being conducted to secure Indian water rights in lieu of litigation.

Funding for Water Rights Negotiation and Litigation projects is determined using Indian Affairs’ published process (Notice of Revised Instructions for Preparing and Prioritizing Water Program Funding Requests, Federal Register, Vol. 70, No. 201, October 19, 2005). Each year under this process, Indian Affairs solicits technical water rights funding proposals for eligible projects from tribes and regional offices. All proposals are evaluated and scored by a review team and prioritized accordingly. The higher scoring proposals are funded at various levels, subject to the constraints of available yearly discretionary allocations.

Water Management Planning & Pre-Development: The Water Management, Planning, and Pre- Development (WMPPD) program supports utilization of reservation water resources. The program allows Tribes to perform technical studies and to develop other information necessary for tribal communities to serve in a manner consistent with sound conservative economic principles that enhance the quality of life, environment, and economic conditions. The program assists in developing and maintaining a managerial environment which ensures that tribal water resource programs are conducted consistent with applicable laws, regulations, court decisions, and negotiated settlements of water rights claims. The Program provides funding for crucial tasks involving protection of tribal water resources necessary for sustainable water supply on the Reservations and public domain allotments.

The Program is administered through a competitive funding process listed in the above Water Rights Negotiation/Litigation program in the of above paragraph. Proposals are evaluated concurrently with this program. Funding Priorities for the Program include technical assistance to the Tribes, project funding for water surveys including quantification studies and characterization of water concerns, as well as training necessary to develop human capacity for water resources management.

Water Resources Technician Training Program: The Bureau of Indian Affairs Water Resources Technician Training Program also known as the Native American Water Corps is designed to provide technical knowledge for high school graduates, college under-graduates and possibly college graduates to gain opportunities, and to explore career goals in the water-based sciences with their tribal government, and/or possible federal water resources positions throughout the country. The objective of the training program is to provide native students an introduction to water resource management-based principles on practical/technical skills and provide an understanding of the fundamental theories and practices related to basic surface water, groundwater and water quality topics. The long-term goal of the WRTT is to build and strengthen the capacity of participating federal government agencies and tribes to find qualified tribal personnel to fill entry level positions and/ or to stimulate the students to pursue further education in the pursuit of water-based sciences that will produce future water resources leaders.

The Play-Learn-Serve work goals of the Department of Interior (DOI) has been incorporated into the Native American Water Corps program by combining field trips, guest speakers, classes and the hands-on internships with tribal or government agency mentors to keep the students interested in water resources and to stimulate creative thought to help benefit participating organizations which provides mentoring to the Native Interns.

Attorney Fees/Litigation Support Services: Funds from this program allow the tribes to retain experts that can help the Tribes assess and respond to a variety of ecological threats to natural resources that are the subject of treaty-Indian trust rights, both on and off reservation. Projects considered for funding within this program are requests for Litigation support services and requests to support Attorney fees.

Financial assistance for Attorney Fees requested by tribes are used to procure legal services to assist the Tribes in establishing or defending tribal rights or protecting tribal trust resources that are guaranteed through treaty, executive order, statute, court decision, or other legal authority.

Congress has directed that the Federal Government represent the tribes in “all suits in law and equity.” Occasionally, the Federal Government cannot represent Indian interests for various reasons, including conflicts of interest. Tribes compete for funding that meet the criteria and exceptions identified in 25 CFR Part 89.40 through .43, which include situations where legal representation is denied or cannot be provided to tribes by the Office of the Solicitor or the United States Department of Justice. Payments for court-ordered settlements that may include payment of attorney fees and expenses are also made from these funds.

2.0 SCOPE

2.1 General

The scope of this effort is to provide technical, programmatic/financial, contractual and administrative support to BIA DWP for existing and future efforts. The services sought will be applied to the support of DWP core functions related to management, operations, maintenance and repair of irrigation, dam, and power infrastructure. Services include:

● Engineering technical services in a variety of disciplines including agricultural, civil, mechanical, and electrical and controls. Additional technical services required include physical science activities related to the DWP program, such as geological, hydrologic, geophysical and related discipline activity. Additionally, services related to financial tracking and accountability are required. Administrative support services related to internal coordination and tracking are also required.

● The contractor shall assist in developing strategic and technical plans and shall assist with conducting technical analyses and assessments in support of DWP efforts. The contractor will help identify and translate user requirements.

● The contractor shall provide research expertise and program support of Government activities with regard to procurements, schedules, and technology/system transfer efforts, program documentation reviews, technical progress and milestone tracking, and execution and evaluation of various technical products.

● Assist in developing technical engineering products related to dam, irrigation and power infrastructure, including hydrologic studies, hydraulic studies, geotechnical, electrical studies related to utility grid and pumping plants, risk analyses, remediation design, value engineering, planning studies, power and irrigation rate studies, remote monitoring systems, technical document review, and other related activities.

● Assist in preparing and tracking technical, schedule, financial and budgetary data to ensure that the DWP program can effectively plan and administer their efforts and meet execution benchmarks.

● Gather information and assist in preparing contract specific financial execution documentation such as deferred maintenance tracking, funds disbursement and receipt tracking and other appropriate justifications.

● Assist the program managers in strategic planning of budgetary and schedule trade-offs/variance analysis during the life cycle of efforts in their portfolio.

● Provide temporary off-site facilities for meetings, conferences and workshops, facilitate these technical meetings, and provide feedback to the program managers on an as needed basis.

● Provide administrative and technical support on-site at BIA DWP offices in Lakewood, CO or other BIA facilities as necessary.

● National Irrigation Information Management Systems (NIIMS) Support

● MAXIMO Support

● The contractor shall provide personnel who have the necessary skills and expertise to accomplish their assigned functions and ensure performance is maintained for all tasks.

The contractor shall use effective benchmarks measuring actual performance against quantifiable goals to report on their quality of service.

● The contractor shall provide orientation and continuous training for all new and existing personnel employed in support of this effort to ensure that services provided are efficient and seamless. Training shall cover the latest applicable technological advances, processes, procedures, policies, applications and tools employed by BIA DWP. Topics shall also include safety, first aid, CPR, and other appropriate office and field types of training.

● Facility safety/Continuity of Operations activities

3.0 TECHNICAL REQUIREMENTS

The contractor shall provide the technical and administrative personnel and expertise to accomplish the following:

3.1. Work Activities

3.1.1. Strategic Planning: The contractor shall work with the program managers in developing strategic and technical plans to promote the DWP mission within the guidelines and time frame requested by the program manager.

3.1.2. Acquisition Support: The contractor shall provide assistance in drafting Scopes of Work for design and construction projects, performing cost estimates, and other associated acquisition tasks. The contractor shall be prohibited from submitting proposals/quotes for any acquisitions they have assisted with.

3.1.3. Technical Assistance:

3.1.3.a - The contractor shall provide technical services related to dam safety engineering, including hydrologic and hydraulic studies, condition assessments, risk analyses, site investigations, design analyses, design services, planning studies, value engineering, remote sensors, controls and inspection services.

3.1.3.b - The contractor shall provide technical services related to Irrigation and Power activities, including condition assessments, risk analyses, site investigations, program reviews and related A-123 activities, technical writing, Operation and Maintenance Guideline development and updates, Standing Operating Procedure (SOP) development, design analyses, design services, planning studies, controls, inspection services, land use spatial information including NIIMS parcel information, carteview conversion of land data description to a geospatial location, land parcel layer development, Database Organizational Guidelines (DOG) maintenance and support, Irrigation Fact Sheet updates, and Indian Irrigation Project knowledge support.

3.1.3.c - The contractor shall provide specialized program and project management assistance for water rights protection activities within the Branch of Water Resources. The activities include budget development, formulation, and implementation of policies, plans and programs relating to the protection of Indian trust water resources. The contractor will work with the Branch Chief and the Regional offices, agencies, and tribal/federal/state/local governments on issues involving water management planning and pre-development, technical consultation for water rights/negotiation activities, water resources technician training program administration and to conduct nationwide evaluations concerning water resources program activities.

3.1.4. Trainings and Briefings: The contractor shall assist in planning, organizing and hosting trainings and briefings for stakeholders of the DWP program. Trainings and briefings may include technical, administrative and financial topics.

3.1.5. Administrative Support: The contractor shall provide administrative support services related to internal coordination, records management, financial tracking, end user support and training, billing and collection activities, HR Classification expertise for new positions, and related tasks.

3.1.6. Policy Support: The contractor shall provide input to program policy documents, including CFR, IAM and Handbook updates. The contractor will maintain updated standard operating procedures and checklists that describe consistent steps for handling most commonly encountered situations.

3.1.7 Irrigation Services: The contractor shall provide technical services related to irrigation operations, maintenance, engineering, and modernization including hydrologic and hydraulic studies, condition assessments, asset management, risk analyses, site investigations, design analyses, design services, planning studies, value engineering, remote sensors, controls, documentation of operations processes, and inspection services.

3.1.8. Specialized Program Information Support: The contractor shall provide technical services for a National Irrigation Information Management System (NIIMS), and other DWP information programs related to information management, server maintenance, electronic tool creation, ongoing modernization, and all other activities required to maintain the current and future needs of the DWP. NIIMS also interoperates with other DOI and BIA electronic tools as well as Treasury shared services, and these interfaces must be supported and enhanced to meet ongoing modernization and security expectations.

3.1.9 Geospatial Support: The contractor shall provide technical services related to Geospatial support for all relevant DWP needs, including support of the DWP Decision Support Tool (DST) Solution, comprised of electronic backend tools for the Colorado River Agency Meter Map (CRAM) production solution deployed at CRA-ES, and planned for SCIP Power, the DWP DST, and other electronic tools.

3.1.10 Accounting: The contractor shall provide technical accounting support for a National Irrigation Information Management System (NIIMS) with complex land ownerships, sophisticated billing logic, and Multi-million dollar collections. Contract team also supports NIIMS interfaces with other DOI and BIA systems as well as Treasury shared services.

4.0 PERSONNEL REQUIREMENTS

4.1. Tasks/Description of Services

The contractor shall provide qualified, experienced engineering and technical support personnel, management support personnel, and administrative support personnel to accomplish the tasks and deliver the services required by this Statement of Work. The contractor shall maintain the personnel, organizational and administrative controls necessary to ensure that the work delivered meets contract specifications and requirements. The work history of each contractor employee must contain experience directly related to the tasks and functions they are intended to perform under this contract. Personnel assigned to, or utilized by, the contractor in performance of work, shall be fully capable of performing the contemplated functions of the respective labor categories in an efficient, reliable, and professional manner. Personnel assigned to or utilized by the contractor in the performance of this contract shall, as a minimum, be a United States Citizen, meet the experience, education, or other background requirements set forth in the job description.

Resumes are required to confirm the acceptability and availability of all proposed personnel.

The Government reserves the right, during the life of the resulting contract, to request work histories on any contractor employee for the purpose of verifying compliance with the contract requirements. IF the Contracting Officer questions the qualification or competencies of any personnel performing under this Scope of Work, the burden of proof to sustain that the candidate is qualified, as prescribed herein, shall rest with the contractor.

The Government reserves the right to modify the contract and add new labor categories that are within the general scope of the contract. The hourly rates for new labor categories will be negotiated.

4.2. Specialized Labor Categories, Technical Requirements and Areas of Support Positions included in the scope of this contract are included in four labor categories:

Management, Engineering, Physical Science and Support. Each Labor Category contains various technical qualifications and experience requirements as delineated in the attachment:

Labor Category Position Descriptions.

4.3. Key Personnel

The contractor shall appoint a Program Manager with overall responsibility for the contracted effort. The Program Manager shall be the single point of interface with the Government for all matters concerning technical progress and problems, program performance, schedule, cost, resources, and other program-related matters.

The contractor shall appoint a technical lead for the Safety of Dams Program (SOD) that is a Technical Coordinator, level III or Level IV Civil Engineer or Physical Scientist.

The contractor shall appoint a technical lead for the Branch of Irrigation and Power Program (BIP) that is a Technical Coordinator, level III or Level IV Civil Engineer or Physical Scientist.

Resumes shall be provided for each key personnel listed in this section.

4.4. Subcontractors and Consultants

The contractor may subcontract or otherwise obtain consultant services for the efforts defined within this Statement of Work to provide the expert talent needed to perform planning, special studies, analysis, development, integration and documentation. All subcontracted effort shall be subject to the consent requirements contained in the subcontracting clause of this contract. The contractor shall provide the manpower required to manage all subcontracts and consultant efforts and to monitor subcontractor activities to the appropriate level of detail that is required to assure timely delivery of all supplies and/or services. A Monthly Status Report on the performance of subcontracts is required in accordance with section 7.0 of this SOW.

4.5. Security

The Contractor shall comply with Federal, DOI, and IA-OIT Policies and Procedures to ensure the agency is compliant with current laws and regulations and any court orders issued regarding Indian Trust data security. The Contractor shall be responsible for safeguarding all Government property provided for Contractor use.

All personnel working in Government buildings must have passed the IA security requirements and be cleared through the IA Contractor security process in accordance with HSPD-12 regulations. Such clearance shall include a criminal background check and credit history check.

There are additional clearance requirements for Contractors working in school locations.

Contractor personnel who occupy positions required under this contract, are required to submit to suitability clearance procedures, and shall not commence work under the contract until the COR and/or Government Contract Officer have cleared them to be on site. All contract employees must be United States citizens. The information collected during this effort is considered unclassified, sensitive; therefore, Level 6C – High Risk Public Trust, is the sensitivity level.

Background Investigations are required for Level 6C positions.

The Contractor shall report suspected computer security breaches as soon as the breach is received, heard of, or found to the IAIT help desk. The Contractor shall only use government furnished computers to service IA users, equipment and software; under no circumstance is the Contractor permitted to make use of Government computer systems, information, equipment, software, supplies, or accounts for purposes other than the performance of this contract. Personal or Contractor-owned computers are not permitted in government buildings or on any of the government networks, which includes ENAN networks.

The Contractor shall abide by United States Federal policies and procedures, the DOI policies and procedures, IA policies and procedures, and court orders.

The Contractor shall not allow employees to use files (script) for logging onto systems, which contain the employee’s password(s).

5.0 Orientation Briefing

Within five working days of IDIQ award, the Contractor shall conduct an orientation briefing for the Government. The intent of the briefing is to initiate the communication process between the Government and Contractor by introducing key personnel and explaining their roles, reviewing communication ground rules, and assuring a common understanding of subtask requirements and objectives.

The date, time and location for the Orientation Briefing will be determined at the time of the contract award.

The completion of this briefing will result in the following:

Introduction of both the Contractor and Government personnel performing work under this

IDIQ.

The Contractor will demonstrate confirmation of their understanding of the work to be accomplished under this Scope of Work.

6.0 OTHER DIRECT CHARGES/TRAVEL

6.1 Non-Travel Other Direct Charges

Other direct charges at the task order level may include:

Equipment and materials for the Early Warning Systems installations and other dam maintenance activities

Hardware or software acquisition, Obtaining temporary training or briefing facilities and associated expenses. Specific requirements and locations will be determined as needed.

For proposal purposes only, ODCs (excluding travel) are not expected to exceed

$75,000.00 per year.

For the purpose of the possibility of utilizing the 52.217-8 clause to extend the contract, ODCs are not expected to exceed half the annual amounts.

6.2 Travel

Travel will be detailed at the task order level. Travel for staff will be primarily within the continental United States to include Alaska, Hawaii, and its territories and will not include international travel. Average travel for staff is five (5) times per year with additional trips as required. Travel must not be scheduled simply to fulfill this minimum; it must be in support of this requirement. Some positions will require substantially more travel, and some positions will require no travel. All travel will be in accordance with the Federal Travel Regulations (FTR).

For proposal purposes only, Travel ODCs are not expected to exceed $400,000.00 per year.

For the purpose of the possibility of utilizing the 52.217-8 clause to extend the contract, Travel is not expected to exceed half the annual amounts.

7.0 GOVERNMENT FURNISHED INFORMATION/EQUIPMENT/FACILITIES

7.1 Government Furnished Information

The Government will provide the Contractor access to information and documentation in support of this requirement at the task order level.

7.2 Government Furnished Property/Equipment (GFE/GFP)

The government will provide the GFP to the contractor to be identified in each individual task order in support of this requirement. Such property/equipment will be returned to the Government upon conclusion of the contract or as specified by the CO, in writing. The Contractor will be required to report any deficiencies to the COR.

8.0 DELIVERABLES

8.1 Monthly IDIQ Tracking/Status Report: On/by the 5th calendar day of each month the contractor(s) shall provide an IDIQ task level order summary report detailing items such as available funding, travel, ODC’s, task order progress, upcoming milestones, and issues/delays.

The format and final inputs will be agreed to between the Contractor and Government after award.

8.2 Government Furnished Property Report: On/by the 5th calendar day of each month the contractor(s) shall provide an IDIQ level task order summary report accounting for all government furnished property and/or equipment.

8.3 Final IDIQ Tracking/Status Report: Thirty (30) days prior to the end of the period of performance the contractor(s) shall provide a detailed financial summary. Report to include all task orders, ODC’s and travel. The format and final inputs will be agreed to between the Contractor and Government after award.

9.0 LOCATION OF PERSONNEL AND FACILITIES REQUIREMENTS

Location of Personnel. Due to the necessity for quick responses and close coordination between DWP and Contractor personnel, Key Personnel, with the exception of the Branch of Irrigation and Power lead, shall be required to be located on-site at DWP Offices in Lakewood, CO located at 13922 Denver West Parkway Building 54, Lakewood CO, 80401, or other previously identified BIA facility. Other staff may be located remotely or undesignated worksites with agreement from the government. Further location of personnel may be detailed in each individual task order.

File details come from the government source that posted it. Updated .