B08_Solicitation_(Attachment_03_-_Submittal_List).pdf
PDF 102 KB Posted
- Attached to
- NICO Interpretive Waysides and Walk Improvements Federal contract opportunity
- Solicitation number
- 140P6026Q0037
About this file
This is a Submittal List template for the National Park Service Midwest Regional Office (MWRO) standardized Statements of Work, specifically for construction projects following specification section 32 13 13 (Concrete Paving).
The document outlines required contractor submittals organized into two categories: Informational and Action items. Under General Requirements (Section 11000, Paragraph 9.1C), contractors must submit eight action items including a preconstruction conference submittal, letter designating the project superintendent, construction schedule, schedule of values, accident prevention/safety plan, list of subcontractors, statements of compliance from subcontractors, and a quality control plan. For Concrete Paving work (Section 321313, Paragraph 1.4), the submittal requirements include product data, samples for initial selection and verification, design mixtures, shop drawings, and grass seed mix specifications as action items. Section 1.5 designates qualification data and material test reports as informational items. The template is designed to be completed and attached to the end of Specification Section 32 13 13, with contractors indicating required submittals by marking them with an "X" in the appropriate column. This standardized format ensures consistent documentation and quality control across National Park Service construction projects.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Solicitation_Amendments_(Attachment_06_-_Q_A)_0002.pdf | ||
| Sol_140P6026Q0037_Amd_0002.pdf | ||
| Sol_140P6026Q0037_Amd_0001.pdf | ||
| B08_Solicitation_(Attachment_01_-_Project_Specifications).pdf | ||
| B08_Solicitation_(Attachment_02_-_Construction_Drawings).pdf | ||
| Sol_140P6026Q0037.pdf | ||
| B08_Solicitation_(Attachment_05_-_Technical_Questionnaire).pdf | ||
| B08_Solicitation_(Attachment_04_-_KS20260044_Modification_1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
ER
T.
/L
A B
T
ES
T
R
EP
O R
T/ C
A
LC
O
R P
LA
N
M fg
. D A
TA
IN
ST
R U
C
TI
O N
S
A dm in is tr at iv e
SH
O
P D
R A
W
IN
G
SA
M
PL
E
M fg
. D A
TA
IN
ST
R U
C
TI
O N
S
11000 9.1C GENERAL REQUIRMENTS
Preconstruction Conference Submittal: X
Letter designating Project Superintendent X
Construction Schedule X
Schedule of Values X
Accident Prevention (Safety) Plan X list of Subcontractors X statements from subcontractors...compliance... X
Quality Control Plan X
321313 1.4 Concrete Paving Product Data X Samples for Initial Selection X Samples for Verification X Design Mixtures X Shop Drawings X Grass Seed Mix X
1.5 Qualification Data X
Material Test Reports X
SUBMITTAL LIST
Attach to end of Specification Section 32 13 13 when complete.
Spec.
Sec. Par. No. Description
INFORMATIONAL ACTION