B08_Solicitation_Attach_5_Submittal_List.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
THRO South Unit Fence Construction Federal contract opportunity
Solicitation number
140P6325B0002
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This file is a Submittal List with Review Estimate Template for the Theodore Roosevelt National Park (THRO) Boundary Fence Replacement - Phase 1 project (PMIS 258443). The document provides detailed instructions for construction submittal requirements, specifically focusing on the design services and construction phase of a fence project. The submittal list outlines various required submissions, including preconstruction conference materials, construction schedules, safety plans, subcontractor lists, quality control plans, and detailed documentation for materials such as steel posts, wire, livestock panels, and gate structures.

The template is designed for use by the Design Architect/Engineer (A/E) and Construction Contracting Officer Representative (COR), with specific guidelines for completing submittal requirements, reviewing submittals, and estimating review times. It is part of a National Park Service (NPS) - Denver Service Center (DSC) project, associated with the solicitation number 140P6325B0002 for fence construction at Theodore Roosevelt National Park's South Unit. The document provides a structured approach for tracking and reviewing various technical and administrative submittals throughout the project's design and construction phases.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Theodore Roosevelt National Park (THRO) PMIS 258443(Complete this portion for Architect / Engineer (A/E)
Project Title: Bountary Fence Replacement - Phase 1construction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
01 10 009.1.CGENERAL REQUIRMENTS
Preconstruction Conference Submittal:
Letter designating Project SuperintendentX
Construction ScheduleX
Schedule of ValuesX
Accident Prevention (Safety) PlanX
list of SubcontractorsX
statements from subcontractors...compliance...X
Quality Control PlanX
Waste Management Plan - Metal RecyclingX
Required ND D.O.T. Construction Permits and insurance CoverageX
L0.1Project Sequencing and Temporary Access MethodsX
L0.1Recycled Materials DocumentationXX
L0.1Materials - Round Steel PostsX
L0.1Materials - U-Channel PostsX
L0.1Materials - Woven WireX
L0.1Materials - Tie WireX
L0.1Materials - H-Brace Wire and ClipsX
L0.1Materials - Livestock PanelsX
L0.1Materials - Aircraft CableX
L0.1Materials - Concrete MixX
L0.1Materials - Miscelaneous hardware for H-Brace ConstructionX
L2.2Gate StructureXX

Total: 0 0 0 0 0 0 0

Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

File details come from the government source that posted it. Updated .