B08_Solicitation_Attach_5_Submittal_List.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- THRO South Unit Fence Construction Federal contract opportunity
- Solicitation number
- 140P6325B0002
About this file
This file is a Submittal List with Review Estimate Template for the Theodore Roosevelt National Park (THRO) Boundary Fence Replacement - Phase 1 project (PMIS 258443). The document provides detailed instructions for construction submittal requirements, specifically focusing on the design services and construction phase of a fence project. The submittal list outlines various required submissions, including preconstruction conference materials, construction schedules, safety plans, subcontractor lists, quality control plans, and detailed documentation for materials such as steel posts, wire, livestock panels, and gate structures.
The template is designed for use by the Design Architect/Engineer (A/E) and Construction Contracting Officer Representative (COR), with specific guidelines for completing submittal requirements, reviewing submittals, and estimating review times. It is part of a National Park Service (NPS) - Denver Service Center (DSC) project, associated with the solicitation number 140P6325B0002 for fence construction at Theodore Roosevelt National Park's South Unit. The document provides a structured approach for tracking and reviewing various technical and administrative submittals throughout the project's design and construction phases.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Solicitation_Amendment_2_Q___A_2_0002.pdf | ||
| Sol_140P6325B0002_Amd_0002.pdf | ||
| B09_Solicitation_Amendment_Attach_1_Question_an_Answers_0001.pdf | ||
| Sol_140P6325B0002_Amd_0001.pdf | ||
| B09_Solicitation_Amendment_Attach_2_DOT_Permit_0001.pdf | ||
| B08_Solicitation_attach_6_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_Solicitation_Attach_3_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Sol_140P6325B0002.pdf | ||
| B08_Solicitation_Attach_4_Wage_Determination.pdf | ||
| B08_Solicitation_Attach_2__Drawings.pdf | ||
| B08_Solicitation_Attach_1_Specifications.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Submittal List with Review Estimate Instructions | |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 | |
| DESIGN SERVICES (Construction Documents (CD) Phase) | |
| Responsible Party: Design Architect/Engineer (A/E) | |
| 1 | Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title. |
| 2 | Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals. |
| 3 | In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals. |
| 4 | Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page. |
| CONSTRUCTION SERVICES (Construction Phase) | |
| Responsible Party: Construction Contracting Officer Representative (COR) | |
| 1 | Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary. |
| 2 | Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services. |
| 3 | Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline. |
| 4 | Add discipline heading column as required. |
| 5 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews. |
| 6 | Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order. |
| 7 | Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative. |
| Responsible Party: Architect/Engineer (A/E) | |
| 1 | Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section. |
| 2 | All Informational submittals will be reviewed by Construction Management Representative (CMR). |
| 3 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate. |
| 4 | Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order. |
&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N
Template
| Submittal List with Review Estimate Template |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 |
| SUBMITTAL LIST | ACTION SUBMITTAL | |||||||||
| REVIEW ESTIMATE | ||||||||||
| Theodore Roosevelt National Park (THRO) PMIS 258443 | (Complete this portion for Architect / Engineer (A/E) | |||||||||
| Project Title: Bountary Fence Replacement - Phase 1 | construction service task order negotiation.) | |||||||||
| SUBMITTAL | REQUIREMENTS | ARCHITECT / ENGINEER REVIEW TIME | ||||||||
| (Indicate with X) | (Indicate in whole or partial hours.) | |||||||||
| INFORMATIONAL | ACTION | |||||||||
| SPECIFICATION SECTION | PARAGRAPH NUMBER | DESCRIPTION | CERTIFICATIONS OR LABORATORY TESTS | REPORTS OR CALCULATIONS | ||||||
| OR PLAN | MANUFACTURER DATA | |||||||||
| AND INSTRUCTIONS | OTHER | SAMPLES | SHOP DRAWINGS | MANUFACTURER DATA | ||||||
| AND INSTRUCTIONS | OTHER | ARCHITECT | CIVIL ENGINEER | STRUCTURAL ENGINEER | MECHANICAL ENGINEER | ELECTRICAL ENGINEER | PROJECT MANAGER COORDINATION | LANDSCAPE ARCHITECT |
| 01 10 00 | 9.1.C | GENERAL REQUIRMENTS | ||||
| Preconstruction Conference Submittal: | ||||||
| Letter designating Project Superintendent | X | |||||
| Construction Schedule | X | |||||
| Schedule of Values | X | |||||
| Accident Prevention (Safety) Plan | X | |||||
| list of Subcontractors | X | |||||
| statements from subcontractors...compliance... | X | |||||
| Quality Control Plan | X | |||||
| Waste Management Plan - Metal Recycling | X | |||||
| Required ND D.O.T. Construction Permits and insurance Coverage | X | |||||
| L0.1 | Project Sequencing and Temporary Access Methods | X | ||||
| L0.1 | Recycled Materials Documentation | X | X | |||
| L0.1 | Materials - Round Steel Posts | X | ||||
| L0.1 | Materials - U-Channel Posts | X | ||||
| L0.1 | Materials - Woven Wire | X | ||||
| L0.1 | Materials - Tie Wire | X | ||||
| L0.1 | Materials - H-Brace Wire and Clips | X | ||||
| L0.1 | Materials - Livestock Panels | X | ||||
| L0.1 | Materials - Aircraft Cable | X | ||||
| L0.1 | Materials - Concrete Mix | X | ||||
| L0.1 | Materials - Miscelaneous hardware for H-Brace Construction | X | ||||
| L2.2 | Gate Structure | X | X |
Total: 0 0 0 0 0 0 0
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N
File details come from the government source that posted it. Updated .