B08 - Solication.pdf
PDF 277 KB Posted
- Attached to
- JMTC-RI Concrete Trench Fill-In
- Solicitation number
- W9098S-20-R-0010
About this file
This solicitation requests proposals for a concrete trench fill-in project at Rock Island Arsenal. Offerors are requested to provide concrete work and materials to fill in an old train trench, providing a single level work area in place of two raised platforms with a trench between. Proposals are due by 5:00 PM Central Time on August 17, 2020. The award will be made to the lowest price technically acceptable proposal. The work must be completed by September 30, 2020 at Rock Island Arsenal. Offerors should submit pricing using the attached Statement of Work and Price Matrix, providing fully burdened fixed labor rates and estimated material costs. The Army Contracting Command - Rock Island will evaluate proposals based on technical acceptability, price, and past performance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W52H1B012101GY
ATTACHMENT - 1 - SOW
ATTACHMENT - 2 - PRICE MATRIX
SHAVOKIE GIBSON 309-782-4114
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
06-Jul-2020
(RFP)
(IFB)
X
CALL:
Concrete Trech Fill-In
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________90 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
ROCK ISLAND ARSENAL (ACC-RI)
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W9098S
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
20-3-03
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9098S20R0010 13
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9098S20R0010
Section 00 10 00 - Solicitation
SUBMISSION INSTRUCTIONS
1. Per allowance provided by FAR 12.203, this is a combined synopsis and solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This will be a Combination Contract for services.
a. This is a combined synopsis/solicitation for commercial service prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice.
b. Request for Proposal (RFP) is being issued by the Army Contracting Command -Rock Island (ACC-
RI) for specified services listed in paragraph 1g.
c. This solicitation, and the provisions and clauses incorporated within, are in effect through the Federal
Acquisition Circular 2005-97, effective 24 January 2018 and Defense Federal Acquisition Regulation
Supplement (DFARS) DPN 20171228, effective 28 December 2017 (Offeror Representations and
Certifications—Commercial Item). The complete text of any of the provisions and clauses included in this solicitation may be accessed in full text at http://farsite/hill.af.mil
d. Type of Set-Aside:
i. Small Business
e. NAICS code:
i. 238110
f. Small Business Size Standard:
i. $16,500,000
g. Line Items being requested via this RFP:
i. CLIN 0001 – Provide service for construction of concrete services IAW SOW.
ii. CLIN 0002 – Materials.
2. The Required Completion Date is 30 September 2020.
3. The work will be performed at the following location:
i. Rock Island Arsenal
4. Pictures are avaiable upon request. If you need pictures please foward request to shavokie.m.gibson.civ@mail.mil.
5. Site visits is scheduled for 31 July 2020 at 0800 CST at Rock Island Arsenal. Please forward request to same email address above before 29 July 2020 1700 CST.
6. The award resulting from this RFP shall comply with the clauses and provisions within this RFP. The contract will be awarded to the lowest price, technically acceptable proposal.
http://farsite/hill.af.mil mailto:shavokie.m.gibson.civ@mail.mil
7. ADDITIONAL INFORMATION:
a. Offerors shall submit quotes by completing the Price Matrix spread sheet (ATTACHMENT - 2).
Offerors shall utilize the attached Statement of Work (SOW), (ATTACHMENT - 1).
b. In accordance with FAR 52.204-7 and 52.204-13, offerors must be registered in SAM prior to submitting an offer.
8. QUOTE SUBMISSION
a. The proposal shall consist of the following:
i. Completed Solicitation and Price Proposal: One electronic copy submitted in PDF format and one completely filled-out solicitation to include total evaluated prices entered on each Contract Line
Item (CLIN) found in the Price Matrix document contained at Exhibit# 003. The Price Matrix must be submitted in Microsoft Excel format with working formulas. Potential vendors shall enter unit prices for all quantity ranges. All unit prices will be binding once agreed to.
ii. Potential vendors shall forward the complete proposal, including the executed RFP and all amendments to the following electronic mail (e-mail) address and the subject line SHALL state
CONCRETE TRENCH FILL-IN SUBMISSION:
Contract Specialist: shavokie.m.gibson.civ@mail.mil
9. PROPOSAL FILES
Format – This RFP shall make use of electronic proposals submitted through e-mail only. The potential vendor is responsible for ensuring their complete proposal reaches the email address above in paragraph 3
a. ii. A. by the date and time specified. Please allow enough time for the entire proposal to go through any firewalls and reach the Government’s server. Hard copy proposals will not be accepted. Failure to submit all required information in the format directed shall lead to a determination that the proposal is non-compliant.
10. Potential contractors shall submit their quote NLT 1700hrs (5:00 PM) CENTRAL TIME, FRIDAY, 17
AUGUST 2020.
11. If you have any questions or concerns, please contact the undersigned, Cathy Mendoza at 309-782-1258, email: cathy.k.mendoza.civ@mail.mil or Mr. Shavokie Gibson, 309-792-4114, email:
shavokie.m.gibson.civ@mail.mil.
12. EXHIBITS:
ATTACHMENT - 1 – SOW
ATTACHMENT - 2 – Pricing Matrix
CLAUSES INCORPORATED BY REFERENCE
52.204-13 System for Award Management Maintenance OCT 2018 mailto:shavokie.m.gibson.civ@mail.mil mailto:cathy.k.mendoza.civ@mail.mil mailto:shavokie.m.gibson.civ@mail.mil.
CLAUSES INCORPORATED BY FULL TEXT
52.237-1 SITE VISIT (APR 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
(End of provision)
52.204-7 System for Award Management OCT 2018
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Technical Acceptability
Price
Past Performance
Technical Factor Evaluations:
An offeror’s proposal must fully address each of the sub factors delineated below, and must provide specified documentation with respect to each sub-factor. In order for an offeror’s technical proposal to be rated as “Acceptable”, each sub-factor identified below must receive an “Acceptable” rating. “Acceptable” and “Unacceptable” ratings are defined as follows.
Acceptable: The proposal demonstrates a clear understanding of the minimum requirements.
Evidence provided indicates the stated approach will be successful and that the requirements set forth will be met. The offeror has successfully demonstrated the stated approach will be successful and has adequately addressed each of the following items: The understanding the requirement, work breakdown structure, maintenance plan, and experience of a similar nature.
Unacceptable: The offeror fails to demonstrate a clear understanding of the minimum requirements, or the evidence provided does not fully demonstrate that the stated approach will be successful or does not indicate that the requirements set forth will be met. The Offeror has not adequately addressed any one of the following items, or, if addressed, the proposal fails to demonstrate that the stated approach will be successful: understanding the requirement, work breakdown structure, maintenance plan, or experience of a similar nature.
Supplement to FAR 52.212-2, Instructions to Offerors: The government is not responsible for locating or securing any information, which is not identified in the quote. To ensure information is available, vendors must furnish as part of their proposal all descriptive material necessary for the government to determine whether the service meets the technical requirements.
Price Factor Evaluation:
Services are to be priced in accordance with the attached Price Model. The offeror will enter the labor category, comparable Service Contract Act (SCA) labor code, base labor rate, fully burdened fixed labor rate, proposed hours based on a review of the SOW and estimated cost of materials for each year. The fully burdened fixed labor rates will be binding.
The Government reserves the right to require the submission of any data necessary to validate the reasonableness of an offer.
The Total Evaluated Price is the result of applying the fully burdened fixed labor rates to the proposed hours for CLINs 0001 and 0002.
If an offeror fails to submit prices for all CLINs on the base and option years, its proposal will be considered unacceptable and the Government will reject the proposal.
Price Analysis shall be used to determine price reasonableness. Additional analysis techniques may be used as determined necessary by the procuring contracting officer. These methods of evaluation may include the use of information/input from sources such as (but not limited to) other Government agencies and personnel.
As part of the evaluation, quotes may be reviewed to identify any significant unbalanced pricing found between CLINs and/or base and option years. In accordance with FAR 15.404-1(g), i.e., Unbalanced Pricing, a proposal may be rejected if the contracting officer determines the lack of balance poses an unacceptable risk to the Government
Past Performance Evaluation:
Past performance will be evaluated using information contained in PPIRS, CPARS, other
Government databases, and information received from sources with personal knowledge of the offeror’s past performance if deemed necessary by the Contracting Officer and rated either as “Acceptable” or
“Unacceptable”. Offerors with no past performance will be rated “Acceptable”. Each initial offer should contain the offeror’s best terms for award of a contract under the solicitation. If the Contracting Officer determines that a small business’ past performance is not acceptable, the matter shall be referred to the
Small Business Administration for a Certificate of Competency determination, in accordance with the procedures contained in FAR Subpart 19.6 and 15 U.S.C. 637(b)(7).
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting
Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include
Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the
Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the
Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent
Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal
Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at
52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the
Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--
(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the
Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award.
(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government's interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the
Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
52.222-34 Project Labor Agreement MAY 2010
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment JUN 2020
52.222-33 Notice of Requirement for Project labor Agreement MAY 2010
52.222-15 Certification of Eligibility MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-12 Contract Termination-Debarment MAY 2014
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-9 Apprentices and Trainees JUL 2005
52.222-8 Payrolls and Basic Records AUG 2018
52.222-8 Payrolls and Basic Records AUG 2018
52.222-7 Withholding of Funds MAY 2014
52.222-6 Construction Wage Rate Requirements AUG 2018
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 30-SEP-2020 1 ROCK ISLAND ARSENAL (ACC-RI)
LALA KEHN
TARA-RM
BLDG 210-2ND FLR
1 ROCK ISLAND ARSENAL
ROCK ISLAND IL 61299-5000
309-782-0470
FOB: Destination
W9098S
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Concrete Trench In-Fill
FFP
Concrete Work- Concrete Trench In-Fill IAW attached SOW "20-3-03 Concrete
Trench Fill SOW". Filling in the old train trench will provide a single level work area instead of two raised platforms with a trench in the center. This will improve safety and effective floor space usage.Doc# E4000-115-PSF1
FOB: Destination
PURCHASE REQUEST NUMBER: W52H1B012101GY
NET AMT
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
Section 00 73 00 - Supplementary Conditions
File details come from the government source that posted it. Updated .