This document outlines requirements for a concrete trench fill project at the Rock Island Arsenal Joint Manufacturing and Technology Center in Illinois. The solicitation is seeking bids to fill approximately 299 linear feet of trenches with concrete and install expansion joints up to 84 inches deep using a minimum 5000 PSI concrete mix. Bidders must saw cut existing rebar, remove debris from the site, and isolate new foundations with 1/2 inch rigid foam insulation. Work hours are specified as weeknights and Saturdays to minimize disruption. The contracting agency is the Department of the Army Materiel Command Joint Munitions Command, and the solicitation number is W9098S-20-R-0010.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08 - Solication(Amend).pdf | ||
| ATTACHMENT - 3 - SF25 PERFORMANCE BOND.pdf | ||
| B08 - Solication(Amend).pdf | ||
| ATTACHMENT - 4 - SF25A PAYMENT BOND.pdf | ||
| ATTACHMENT - 4 - SF25B PAYMENT BOND CONTINUATION SHEET.pdf | ||
| B08 - Solication.pdf | ||
| Attachment 2 Pricing Matrix.xlsx | XLSX spreadsheet | |
| B08 - Solication.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
299 TRENCH FILL
CONCRETE PROJECT #20‐3‐03
TARA‐PSF
DISTRO‐A
Approval for Distribution:
Niles, Bradley D
Largent, Christopher P
NOTES
1. THE CONTRACTOR WILL USE WATER TO El IMINATE
OUST DURING ENTIRE CONSTRUCTION,
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
JMTC CONCRETE PROJECTS
GENERAL NOTES
LOCATION ON ROCK ISLAND ARSENAL
2, WHEN SAW CUTTING FLOOR AROUND WORK AREA,
REBAR WILL BE PRESENT ANO MUST BE CUT OFF EVEN
WI TH SAW curs.
3, THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
FLOOR OR THE UNDERLYING SOIL CAUSED BY THE
CONSTRUCTION,
◄, THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH
AS BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD
BLOCKS, CONCRETE ANO REBAR OFF RIA IN ACCORDANCE
WITH LOCAL REGULATIONS.
5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE, IF
EQUIPMENT USED ARE GAS ENGINES.
-CONTRACTOR $HALL HAVE CATALYTIC•
CONVERTER ON ALL OIESEL ENGINES.
6. NEW CONCRETE FOR MACHINE FOUNDATION SHALL BE
A MIN, 5000 PSI.
7. THE CONTRACTOR SHALL CLEANUP THE WORKS I TE
AFTER COMPLETION OF THE PROJECT.
8. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL.
AFTER CLEANUP IS COMPLETE. LINE FOUNDATION WITH
1/2" RIGID FOAM INSULATION FOR VIBRATION ISOLATION.
JOINT SEALANT SHALL BE BASF SONOLASTIC SL-1 DR EQUAL.
9. JACK HAMMERING / REMOVAL WILL BE DONE BETWEEN THE TIMES OF
2:30 PM ANO 11:00 PM OR SATURDAYS.
.POURING OF NEW CONCRETE WILL BE ON FRIDAY OR SATURDAY•
FRAMING. TYING OF REBAR WILL BE DAY SHIFT WORK.
1 O. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC ANO
WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK.
THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:
Concrete Tefl'08roh.re ot Point of Oischorge f 1c1
Haul Time
HO<TS Minutes
50-64 110-17,51 1 JO
65-90 118-321 - without l'"etol'"der" 1 0
65-90 118-321 - with l'"eh:rdel'" 1 30
11. BARRICAOES WILL BE POSITIONEO 6' FROM EACH SIOE OF THE WORK AREA.
CONTRACTOR SHALL PROVIDE ANO PLACE THE BARRICADES
12. CONTRACTOR WILL PROVIDE SPOTTER / GROUND MAN
FOR EQUIPMENT / TRUCKS GOING IN ANO OUT OF BLDG.
13. SINGLE TIED LAYER OF #4 REBAR (1/2"1. 12" X-W
SPACING. REBAR SHOULD BE A MIN OF 3" BELOW
SURFACE ANO HAVE A MINUMUM OF 2 ROOS IN EACH
DIRECTION. DOWELS WILL BE ORILLEO A MINIMUM OF 6"
INTO THE VERT I CAL FACE OF THE EXIST I NG CONCRETE.
U. CONSOLIDATE PLACED CONCRETE USING MECHANICAL VIBRATING
EOUIPMENT WITH HANO RODDING ANO TAMPING SO THAT CONCRETE
IS WORKED AROUND REINFORCING ANO OTHER EMBEDDED ITEMS
ANO INTO FORMS.
15, FABRICATION ANO INSTALLATION OF STRUCTURAL STEEL
SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL
CONSTRUCTION IAISCI STANDARDS AND SPECIFICATIONS. ALL
WORK SHALL BE PERFORMEO BY COMPETENT. EXPERIENCEO.
OUAL IF I EO WORK ME NT.
16, ANY DISCREPANCIES IN PLANS. OR BETWEEN PLANS ANO
SPECIFICATIONS. SHALL BE BROUGHT TO THE ATTENTION OF
RIA REPRESENTATIVE Robert McClure IMMEOIATELY.
17. DRAWING NOT TO SCALE,
INOEX
SECURITY NOTES •••••••••••••••••••••••••••••• 2
299 PAINT FLOOR DEMO/FLOOR CUT.,, ••••••••••• 3
299 PAINT FLOOR ELEV/CONST PLAN ••••••••••••• 4
OLD 299 PAINT CAP DEMO ..................... S
OLD 299 PAINT CAP LAYOUT
CHILLER PIER FOOTINGS ••••••••••••••••••••••• 7
212 FOUNDRY CAP, •••• , ••••• ,., ••• , •• , ••• , •••• 8
JMTC CONCRETE WORK
SHEET- 1 OF 8
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
299 PAINT FLOOR REPAIR
ELEVATION/CONSTRUCTION PLAN
NOTES:
1, l THE NORTH ANO SOUTH SLABS ARE NOT
ALWAYS THE SAME ELEVATION. WHEN THIS OCCURS
THE NEW CONCRETE WILL BE SLOPED TO
MATCH THE EXISTING CONCRETE.
2,) 299 CRANE WALL TRENCH WALL
IS APPROXIMATLY 600 ft, LONG AND WILL NEED TO BE SLOPED TO A 1(one) TO 10(ten)
SLOPE MATCHING GRADE APPROXIMATELY 40 FEET
FROM THE WEST OVER HEAD DOOR.
1/2" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT
PRODUCT WILL BE USED IN TOPICAL CRACK
NORTH SLAB
REINFORCING BAR NOTES
#L. BAR
6" DOWEL EMBEDMENT I
I'' THICK TRAIN PIT WALL - 8'0EEP I
SOUTH SLAB
NAL
PLANT ENGINEERING DIRECTORATE
TARA-PIP
FLOOR REPAIR FOR BLOG 299
PA NT F R REPAIR
SHEET- 4 OF 8
CONCRETE PAD SHALL BE RELATIVELY LEVEL WITH REGARDS TO
MATCHING EXISTING CONCRETE GRADES OF NORTH AND SOUTH PADS.
NORTH AND SOUTH RETAINING WALLS SHALL BE REMOVED AND
REBAR BORES WILL BE PLACED IN AT 6 INCH INTERVALS TO
RETAIN REGIDITY AND MATCHING GRADE TO AVOID SINKING OF
NEW SLAB.
THE EXISTING CURB ON NORTH AND SOUTH SIDE OF RAMPS WILL
BE REMOVED AND CAN BE USED AS RECYLCLED FILL FOR PIT AREA.
RECYCLE FILL WILL NOT BE ADDED TO MORE THAN 12 INCHES
FROM THE TOP OF FINISH GRADE. THE REMAINING 12 INCHES
WILL BE CONCRETE.
REBAR WILL BE ADDED ACCORDING TO SPECS.
FILL WILL BE COMPACTED BETWEEN EACH LIFT EQUALLING 12
INCHES OR LESS AND LEAVE THE COMPLETE LAYERS WITH NO AIR
VOIDS OR BIODEGRADABLE MATERIAL IMPREGNATED IN THE FILL
MATERIAL.
CONCRETE WILL BE PLACED USING CURRENT AND STANDARD
PRACTICES THAT COINCIDE WITH ALL OSHA AND FEDERAL
GUIDELINES AND SAFETY POLICIES.
RELIEF CUTS AND ALL JOINTS WILL BE SEALED WITH ADHESIVE
FLEXABLE CAUKING TO AVOID CHIPPING, CRACKING OR SPLITTING
OF CONCRETE EDGESACCORDING TO INDUSTRIAL APPLICATION
STANDARDS.
CONTRACTOR WILL ASSUME RESPONSIBILITY OF TRAFFIC CONTROL
AND ACCESS TO WORK SITE. SAFEGUARDS WILL BE EMPLACED TO
PREVENT INJURIES FROM ARSENAL EMPLOYEES DURING NORMAL
BUSINESS HOURS OR WHEN DOD CIVILIANS ARE AREOUND.
| Notes Concrete.pdf |
| Blank Page |
| 2020-03-25T10:30:58-0500 | |
| NILES.BRADLEY.D.1209288008 |
| 2020-03-25T08:36:55-0500 | |
| LARGENT.CHRISTOPHER.P.1283709929 |
File details come from the government source that posted it. Updated .