The file's text, extracted by GovTribe without its formatting.
Instructions
| Instructions |
| Fill in all green cells in the Pricing Tab. |
| If you would like to quote pricing for additional types of equipment not listed in this spreadsheet, you may add those in the blue cells |
| NOTE: Any resultant award will include only the unit prices and total ceiling price per CLIN. Quantities of any kind will not be included in any resultant award and are only included in this pricing sheet in order to calculate a ceiling price for each CLIN. |
| NOTE: Pricing for CLINs on the CLIN Summary tab is calculated by dividing the total quoted price for each SOW Task 2.1-2.3 on the Pricing Details tab evenly across two six-month periods of performance |
Pricing Details
ONLY INPUT DATA IN GREEN BOXES!!! ONLY INPUT DATA IN GREEN BOXES!!!
| CLIN # | DESCRIPTION | CLIN CEILING PRICE |
| 1 | NON-EMERGENCY Hazardous Tree Removal Services | $ - 0 |
| 2 | EMERGENCY Hazardous Tree Removal Services | $ - 0 |
| 3 | Vegetation Management and Debris Removal | $ - 0 |
Total Contract Value : $ - 0
IMPORTANT NOTE: All Quantities shown below are ESTIMATES ONLY. The quantities are based on historical data however these quantities are NOT guarenteed. Quantities are used for pricing purposes only.
| SOW Task 2.1 | NON-EMERGENCY Hazardous Tree Removal Services & Stump Grinding |
| Service: | Hazardous Tree Removal |
| Description: The pricing shown below for NON-EMERGENCY Hazard Tree Removal is inclusive of ALL LABOR and STANDARD MATERIALS, as specified in the SOW, that are necessary for the safe dismantling or felling of the tree, material removal, chipping of debris, and site clean-up. | |
| HAZARDOUS TREE REMOVAL, DEBRIS REMAINING ONSITE | | | | |
| Diameter at Breast Height | Est Qty | UOM | Price/Unit | Subtotal |
| <5" | 1 | Tree | | $ - 0 |
| 6-11" | 13 | Tree | | $ - 0 |
| 12-17" | 45 | Tree | | $ - 0 |
| 18-23" | 31 | Tree | | $ - 0 |
| 24-30" w/ Crown Dia. <40' | 21 | Tree | | $ - 0 |
| 24-30" w/ Crown Dia. >40' | 14 | Tree | | $ - 0 |
| 31-36" w/ Crown Dia. <40' | 3 | Tree | | $ - 0 |
| 31-36" w/ Crown Dia. >40' | 9 | Tree | | $ - 0 |
| 37-47" w/ Crown Dia. <40' | 3 | Tree | | $ - 0 |
| 37-47" w/ Crown Dia. >40' | 9 | Tree | | $ - 0 |
| 48-60" w/ Crown Dia. <40' | 0 | Tree | | $ - 0 |
| 48-60" w/ Crown Dia. >40' | 1 | Tree | | $ - 0 |
| >60" w/ Crown Dia <40' | 0 | Tree | | $ - 0 |
| >60" w/ Crown Dia >40' | 1 | Tree | | $ - 0 |
| SUBTOTAL | 151 | | | $ - 0 |
| CHARGE FOR DEBRIS REMOVAL TO GWMP LOCATION PER TREE | | | | |
| Diameter at Breast Height | Est Qty | UOM | Price/Unit | Subtotal |
| <12" | 9 | Tree | | $ - 0 |
| 12-30" | 47 | Tree | | $ - 0 |
| 31" -47" | 13 | Tree | | $ - 0 |
| 47"-60" | 3 | Tree | | $ - 0 |
| >60" | 1 | Tree | | $ - 0 |
| SUBTOTAL | 73 | | | $ - 0 |
| CHARGE FOR DEBRIS REMOVAL TO OFFSITE LOCATION PER TREE | | | | |
| Diameter at Breast Height | Est Qty | UOM | Price/Unit | Subtotal |
| <12" | 9 | Tree | | $ - 0 |
| 12-30" | 47 | Tree | | $ - 0 |
| 31" -47" | 13 | Tree | | $ - 0 |
| 47"-60" | 3 | Tree | | $ - 0 |
| >60" | 1 | Tree | | $ - 0 |
| SUBTOTAL | 73 | | | $ - 0 |
| OTHER Non-Standard Labor and Equipment Rates |
| Description: Equipment Rates include Operator. Historically, this equipment has been required for project work on a limited basis only. |
| Description * | Est Qty | UOM | Price/Unit | Subtotal |
| Forestry Mulcher | 13 | Hour | | $ - 0 |
| Skid Steer | 540 | Hour | | $ - 0 |
| Bush Hog | 54 | Hour | | $ - 0 |
| Traffic Control** | 216 | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| SUBTOTAL | 823 | | | $ - 0 |
| *Equipment Rates are inclusive of Equipment Operator. Equipment costs are for active run time only. | | | | |
| **Traffic Control is inclusive of all Labor and Materials needed to ensure public safety. | | | | |
| Service: | Stump Grinding | | | | | | | | | | |
| Description: The pricing below includes ALL LABOR and STANDARD MATERIALS, as specified in the SOW, to grind stumps to specified depth and includes either hauling away grindings or spreading them on-site as mulch. Services shall adhere to industry standards and arboricultural practices. | | | | | | | | | | | |
| Stump Grinding – 12" Depth (mulch remains on-site) | | | | | | Stump Grinding – 24" Depth (mulch remains on-site) | | | | | |
| Includes all Standard Labor and Equipment | | | | | | Includes all Standard Labor and Equipment | | | | | |
| Stump Diameter | Est Qty | UOM | Price/Unit | Subtotal | | Stump Diameter | Est Qty | UOM | Price/Unit | Subtotal |
| <12" | 3 | Stump | | $ - 0 | | <12" | 1 | Stump | | $ - 0 |
| 12-17" | 3 | Stump | | $ - 0 | | 12-17" | 1 | Stump | | $ - 0 |
| 18-23" | 3 | Stump | | $ - 0 | | 18-23" | 1 | Stump | | $ - 0 |
| 24-30" | 4 | Stump | | $ - 0 | | 24-30" | 1 | Stump | | $ - 0 |
| 31-36" | 1 | Stump | | $ - 0 | | 31-36" | 0 | Stump | | $ - 0 |
| 37-47" | 0 | Stump | | $ - 0 | | 37-47" | 0 | Stump | | $ - 0 |
| 48-59" | 0 | Stump | | $ - 0 | | 48-59" | 0 | Stump | | $ - 0 |
| >60" | 0 | Stump | | $ - 0 | | >60" | 0 | Stump | | $ - 0 |
| SUBTOTAL | 14 | | | $ - 0 | | SUBTOTAL | 4 | | | $ - 0 |
| Stump Grinding – 12" Depth (mulch removal and topsoil backfill) | | | | | | Stump Grinding – 24" Depth (mulch removal and topsoil backfill) | | | | | |
| Includes all Standard Labor and Equipment | | | | | | Includes all Standard Labor and Equipment | | | | | |
| Stump Diameter | Est Qty | UOM | Price/Unit | Subtotal | | Stump Diameter | Est Qty | UOM | Price/Unit | Subtotal |
| <12" | 3 | Stump | | $ - 0 | | <12" | 1 | Stump | | $ - 0 |
| 12-17" | 3 | Stump | | $ - 0 | | 12-17" | 1 | Stump | | $ - 0 |
| 18-23" | 3 | Stump | | $ - 0 | | 18-23" | 1 | Stump | | $ - 0 |
| 24-30" | 4 | Stump | | $ - 0 | | 24-30" | 1 | Stump | | $ - 0 |
| 31-36" | 1 | Stump | | $ - 0 | | 31-36" | 0 | Stump | | $ - 0 |
| 37-47" | 0 | Stump | | $ - 0 | | 37-47" | 0 | Stump | | $ - 0 |
| 48-59" | 0 | Stump | | $ - 0 | | 48-59" | 0 | Stump | | $ - 0 |
| >60" | 0 | Stump | | $ - 0 | | >60" | 0 | Stump | | $ - 0 |
| SUBTOTAL | 14 | | | $ - 0 | | SUBTOTAL | 4 | | | $ - 0 |
CLIN 1 TOTAL: $ - 0 (Total of inclusive of Stump Grinding and Non-Emergency Tree Removal Services)
SOW Task 2.2 EMERGENCY Hazardous Tree Removal Services
| Service: Emergency Hazard Tree Removal |
| Description: The pricing shown below for EMERGENCY Hazard Tree Removal is inclusive of ALL LABOR and STANDARD MATERIALS, as specified in the SOW, that are necessary for the safe dismantling or felling of the tree, material removal, chipping of debris, and site clean-up. Services shall adhere to industry standards and arboricultural practices. |
regulatory expectations for arboricultural practices.
2 / 2
125%
| EMERGENCY TREE REMOVAL, DEBRIS REMAINING ONSITE | | | | |
| Diameter at Breast Height | Est Qty | UOM | Price/Unit | Subtotal |
| 6-11" | 13 | Tree | | $ - 0 |
| 12-17" | 16 | Tree | | $ - 0 |
| 18-23" | 27 | Tree | | $ - 0 |
| 24-30" | 27 | Tree | | $ - 0 |
| 31-36" | 27 | Tree | | $ - 0 |
| 37-47" | 16 | Tree | | $ - 0 |
| 48-60" | 3 | Tree | | $ - 0 |
| >60" | 3 | Tree | | $ - 0 |
| SUBTOTAL | 132 | | | $ - 0 |
| CHARGE FOR DEBRIS REMOVAL TO GWMP LOCATION | | | | |
| Diameter at Breast Height | Est Qty | UOM | Price/Unit | Subtotal |
| <12" | 10 | Tree | | $ - 0 |
| 12-30" | 34 | Tree | | $ - 0 |
| 31" -47" | 13 | Tree | | $ - 0 |
| 47"-60" | 8 | Tree | | $ - 0 |
| >60" | 1 | Tree | | $ - 0 |
| SUBTOTAL | 66 | | | $ - 0 |
| CHARGE FOR DEBRIS REMOVAL TO OFFSITE LOCATION | | | | |
| Diameter at Breast Height | Est Qty | UOM | Price/Unit | Subtotal |
| <12" | 10 | Tree | | $ - 0 |
| 12-30" | 34 | Tree | | $ - 0 |
| 31" -47" | 13 | Tree | | $ - 0 |
| 47"-60" | 8 | Tree | | $ - 0 |
| >60" | 1 | Tree | | $ - 0 |
| SUBTOTAL | 66 | | | $ - 0 |
| OTHER Non-Standard Labor and Equipment Rates |
| Description: Equipment Rates include Operator. Historically, this equipment has been required for project work on a limited basis only. |
| Description * | Est Qty | UOM | Price/Unit | Subtotal |
| Forestry Mulcher | 0 | Hour | | $ - 0 |
| Skid Steer | 108 | Hour | | $ - 0 |
| Bush Hog | 0 | Hour | | $ - 0 |
| Traffic Control** | 10 | Hour | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| SUBTOTAL | 118 | | | $ - 0 |
| CLIN 2 TOTAL: | $ - 0 |
| *Equipment Rates are inclusive of Equipment Operator. Equipment costs are for active run time only. | | |
| **Traffic Control is inclusive of all Labor and Materials needed to ensure public safety. Historically, GWMP has provided traffic control on Emergency responses. | | |
| SOW Task 2.3 | Vegetation Management and Debris Removal |
| Service: Vegetation Management and Debris Removal | |
| Description: The pricing shown below for Vegetation Management and Debris Removal is inclusive of ALL LABOR and STANDARD MATERIALS, as specified in the SOW, that are necessary to remove debris and manage vegetation as described in the SOW. | |
| Vegetation Management | | | | | |
| Description* | Est Qty | UOM | Price/Unit | Subtotal |
| Crew Supervisor | 324 | Hour | | $ - 0 |
| Forestry Crew Member | 1620 | Hour | | $ - 0 |
| Chipper | 162 | Hour | | $ - 0 |
| Chip Truck | 162 | Hour | | $ - 0 |
| Bucket Truck | 108 | Hour | | $ - 0 |
| ISA Arborist / MD Licensed Tree Expert | 80 | Hour | | $ - 0 |
| SUBTOTAL | 2,456 | | | $ - 0 |
| *Equipment Rates are inclusive of Equipment Operator. Equipment costs are for active run time only. | | | | |
| Vegetation Management OTHER Labor and Equipment Rates |
| Description: Equipment Rates include Operator. Historically, this equipment has been required for project work on a limited basis only. |
| Description * | Est Qty | UOM | Price/Unit | Subtotal |
| Climber | 40 | Hour | | $ - 0 |
| Crane | 0 | Hour | | $ - 0 |
| Log Loader | 216 | Hour | | $ - 0 |
| Small Wheel Loader or Track Loader | 324 | Hour | | $ - 0 |
| Forestry Mulcher | 10 | Hour | | $ - 0 |
| Skid Steer | 40 | Hour | | $ - 0 |
| Bush Hog | 0 | Hour | | $ - 0 |
| Traffic Control** | 40 | Hour | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | | | $ - 0 |
| {Contractor Proposed Line} | | Hour | | $ - 0 |
| SUBTOTAL | 670 | | | $ - 0 |
| *Equipment Rates are inclusive of Equipment Operator. Equipment costs are for active run time only. | | | | |
| Debris Removal | | | | | |
| Description* | Est Qty | UOM | Price/Unit | Subtotal |
| Debris grinding/removal haul off-site | 4000 | Cubic Yard | | $ - 0 |
| Debris grinding/removal remain on-site | 6750 | Cubic Yard | | $ - 0 |
| SUBTOTAL | 10,750 | | | $ - 0 |
| Debris Removal OTHER Labor and Equipment Rates | | |
| Description: Equipment Rates include Operator. Historically, this equipment has been required for project work on a limited basis only. | | |
| CLIN 3 TOTAL: | $ - 0 |
CLIN Summary Pricing for CLINs is calculated by dividing the total quoted price for each SOW Task 2.1-2.3 evenly across two six-month periods of performance
| Contract Period | CLIN # | Description | PoP | CLIN Type | Price Ceiling |
| Base | 10 | Base Period Non-Emergency Hazard Tree Removal | 9/23/2025-3/22/2026 | T&M | $ - 0 |
| 20 | Base Period Emergency Hazard Tree Removal | 9/23/2025-3/22/2026 | T&M | $ - 0 |
| 30 | Base Period Vegetation Management and Debris Removal | 9/23/2025-3/22/2026 | T&M | $ - 0 |
| | | Base Period Subtotal: | | $ - 0 |
| Option Period 1 | 40 | OP1 Non-Emergency Hazard Tree Removal | 3/23/2026-9/22/2026 | T&M | $ - 0 |
| 50 | OP1 Emergency Hazard Tree Removal | 3/23/2026-9/22/2026 | T&M | $ - 0 |
| 60 | OP1 Vegetation Management and Debris Removal | 3/23/2026-9/22/2026 | T&M | $ - 0 |
| | | Option Period 1 Subtotal: | | $ - 0 |
| | | | Total: | $ - 0 |
image1.png