This document appears to be a detailed description of fire protection system deficiencies and associated repair/maintenance costs for buildings located along the George Washington Memorial Parkway (GWMP). The deficiencies include items such as the need for 5-year internal pipe examinations, pressure gauge replacements, hydrostatic testing, identification signage, fire alarm system upgrades, and heat detector replacements. The total estimated net cost for addressing these deficiencies across multiple GWMP facilities is $0.00.

The document is related to a federal contract opportunity with Solicitation Number 140D0424Q0621 for "ARHO - Fire Monitoring" issued by the Department of the Interior Departmental Offices Interior Business Center. The contract appears to be for fire and intrusion monitoring with minor repairs at the GWMP facilities.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GWMP - 2023

DEFICIENCY COST ESTIMATE

GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP)

Annual

ITM

Date FMSS Bldg # System Asset

#Building NameDeficiency Description
(NOTE: Deficiencies in red are repeat deficiencies which were also cited from ITM performed last year)Nature of DeficiencyNFPA Reference Standard, SectionRAC

Work

TypeQtyMaterial CostLabor CostSubTotal CostSubTotal NET CostTotal NET Cost
05/12/
2023264241254332Great Falls Visitor CenterNo difificencies noted.N/AN/AN/AN/AN/AN/AN/AN/AN/A
05/12/
202385780?????Visitor Center Snack BarNo difificencies noted.N/AN/AN/AN/AN/AN/AN/AN/AN/A

05/12/ 2023 26492 1559075 Parkway Maintenance Hq Perform 5-year internal pipe examination of the fire sprinkler system, including alarm/check valves and fire department connection. Cost is per system/zone. FP 25, 13.4.1.2, 13.4.2.1,

14.2.1FM/DM
Serious1
05/12/ 2023264921559075Parkway Maintenance HqReplace two (2) pressure gauges as part of 5-year maintenance.FP25,
5.3.2FM/DM
Minor2
05/12/ 2023264921559075Parkway Maintenance Hq5 year hydrostatic test of fire department connection (FDC) piping is due. Perform hydrostatic test of the system as required.FP25,
6.3.2.1FM/DM
Minor1
05/12/ 2023264921559075Parkway Maintenance HqProvide identification sign for the fire department connection (FDC). FDC is currently not provided with an identification sign.FP25,
13.7.1FM/DM
Minor1
05/12/ 2023264921562544Parkway Maintenance HqAll fifteen (15) heat detectors are 15 years old and are required to be replaced. Heat detectors were tested for integrity and reported to panel.FA72,
14.4.3.2FM/EM
Serious15
05/12/ 2023264921562544Parkway Maintenance HqThe fire alarm control panel in this building is a conventional "Cerberus Pyrotronics System 3" panel. Fire alarm devices report to NPS Dispatch as zones with generic descriptions. The NPS document “National Capital Region Fire Protection Systems Requirements” requires all fire alarm control panels to be addressable type, so that fire alarm devices are programmed as individual points (instead of zones). Install an addressable fire alarm system.FA72, 14.4.3.2FM/CR
Serious1

05/12/ 2023 26493 ???? BLDG #2 Auto & Equipment Repair No fire alarm or sprinkler system preseent in this building. N/A N/A N/A N/A N/A N/A N/A

05/12/ 202326495384441BLDG #4 Grounds Operation StorageInvestigate integrity of fire alarm system monitoring. Outside monitoring station failed to receive signals from the fire alarm control panel during testing. Cost is for service call to determine the extent of corrective action.FA72,
14.4.3.2FM/EM
Critical1
05/08/
202326496384441BLDG #5-6 Grounds Operation BldgPerform 5-year internal pipe examination of the fire sprinkler system, including alarm/check valves and fire department connection. Cost is per system/zone.FP25,

13.4.1.2, 13.4.2.1,

14.2.1FM/DM
Serious1
05/08/
202326496384441BLDG #5-6 Grounds Operation BldgReplace (up to 4) pressure gauges as part of 5-year maintenance.FP25,
5.3.2FM/DM
Minor1
05/08/
202326496384441BLDG #5-6 Grounds Operation Bldg5 year hydrostatic test of fire department connection (FDC) piping is due. Perform hydrostatic test of the system as required.FP25,
13.8.5FM/DM
Minor1
05/08/
202326496384441BLDG #5-6 Grounds Operation BldgProvide identification sign for the fire department connection (FDC). FDC is currently not provided with signage.FP25,
13.7.1FM/DM
Minor1
05/08/
202326496384441BLDG #5-6 Grounds Operation BldgProvide an identification tag for the fire sprinkler control valve. Control valve currently not provided with an identification tag.FP25,
13.3.2.2FM/LMSF
Minor1

05/12/ 2023 26497 384441 BLDG #7 Roads & Bridges-Tree No deficiencies noted. N/A N/A N/A N/A N/A N/A N/A

05/12/ 2023 26498 384369 BLDG #8 B&U Signs Perform 5-year internal pipe examination of the fire sprinkler system, including alarm/check valves and fire department connection. Cost is per system/zone. FP 25, 13.4.1.2 13.4.2.1

14.2.1FM/DM
Serious1
05/12/ 202326498384369BLDG #8 B&U SignsReplace (up to 4) pressure gauges as part of 5-year maintenance.FP25,
5.3.2FM/DM
Minor4
05/12/ 202326498384369BLDG #8 B&U SignsWet sprinkler system is not piped outside, which means a main drain test could not be prefromed. Cost is for an inspection to determine the extent of corrective action required.FP25,
6.3.2.1FM/DM
Serious1
05/12/ 202326498384369BLDG #8 B&U SignsHydraulic nameplate is missing from each of the two (2) sprinkler risers. Provide a hydraulic nameplate for each as required.FP25,
5.2.7FM/DM
Minor2
05/12/ 202326498384441BLDG #8 B&U SignsReplace/repair valve water flow switch. Valve water flow switch failed to report to panel when tested.FP13,
6.9.2.1FM/EM
Critical1
05/12/ 202326498384441BLDG #8 B&U SignsReplace/repair valve tamper switch. Valve tamper switch failed to report to panel when tested.FP25,
13.3.2.2FM/EM
Critical2
05/12/ 202326498384441BLDG #8 B&U SignsAll sixteen (16) heat detectors are 15 years old and are required to be replaced. Heat detectors were tested for integrity and reported to panel.FA72,
14.4.3.2FM/EM
Serious16
05/12/ 202326498384441BLDG #8 B&U SignsReplace two (2) 12V, 7A batteries serving the fire alarm control panel. Batteries are over five years old and should be replaced.FA72,
14.4.3.2FM/DM
Serious2
05/12/ 202326498384441BLDG #8 B&U SignsThe fire alarm control panel in this building is a conventional "Cerberus Pyrotronics System 3" panel. Fire alarm devices report to NPS Dispatch as zones with generic descriptions. The NPS document “National Capital Region Fire Protection Systems Requirements” requires all fire alarm control panels to be addressable type, so that fire alarm devices are programmed as individual points (instead of zones). Install an addressable fire alarm system. Cost is for system replacement, which covers Buildings #4 through #9 at the GWMP Maintenance Yard.FA72, 14.4.3.2FM/CR
Serious1
05/11/
202326499UnknownBLDG #9 President Park/White HousePerform 5-year internal pipe examination of the fire standpipe system, including alarm/check valves and fire department connection. Cost is per system/zone.FP25,

13.4.1.2 13.4.2.1

14.2.1FM/DM
Serious1
05/11/
202326499UnknownBLDG #9 President Park/White HouseReplace (up to 4) pressure gauges as part of 5-year maintenance.FP25,
5.3.2FM/DM
Minor2
05/11/
202326499UnknownBLDG #9 President Park/White HouseProvide identification sign for the fire department connection (FDC). FDC is currently not provided with signage.FP25,
13.7.1FM/DM
Minor1
05/11/
202326499UnknownBLDG #9 President Park/White HouseHydraulic nameplate is missing from the sprinkler riser. Provide a hydraulic nameplate as required.FP25,
5.2.7FM/DM
Minor2
05/11/
202326499UnknownBLDG #9 President Park/White House5 year hydrostatic test of fire department connection (FDC) piping is due. Perform hydrostatic test of the system as required.FP25,
6.3.2.1FM/DM
Minor1
05/11/
202326499UnknownBLDG #9 President Park/White HouseProvide a spare sprinkler cabinet with a minimum of 6 sprinkler heads and a matching wrench. Spare sprinkler cabinet is currently not provided at this location.FP25,
5.4.1.5FM/LMSF
Minor1
05/11/
202326499UnknownBLDG #9 President Park/White HouseAll fifteen (15) heat detectors are 15 years old and are required to be replaced. Heat detectors were tested for integrity and reported to panel.FA72,
14.4.3.2FM/EM
Serious15
05/12/
202326842316838Turkey Run Headquarters-Admin (TRHQ)Repair/replace notification appliance located "Inside Women's Room by the Lobby (strobe)". Device failed to activate when tested.FA72,
14.4.3.2FM/EM
Serious2
05/12/
202326842316838Turkey Run Headquarters-Admin (TRHQ)Replace two (2) 12V, 7A batteries serving the fire alarm control panel. Batteries failed the load test.FA72,
14.4.3.2FM/DM
Serious2
05/14/
202326843224834USPP HQ BuildingPerform 5-year internal pipe examination of the fire sprinkler system, including alarm/check valves and fire department connection. Cost is per system/zone.FP25,

13.4.1.2, 13.4.2.1,

14.2.1FM/DM
Serious2
05/14/
2023268431562547USPP HQ BuildingReplace four (4) pressure gauges as part of 5-year maintenance.FP25,
5.3.2FM/DM
Minor5
05/14/
202326843224834USPP HQ Building5 year hydrostatic test of fire department connection (FDC) piping is due. Perform hydrostatic test of the system as required.FP25,
6.3.2.1FM/DM
Minor1
05/14/
2023268431562547USPP HQ BuildingPerform a 3-year leak test and full flow trip test of the dry pipe sprinkler system. Cost is per system/zone.FP25, 13.4.4.2.9FM/DM
Serious1
05/14/
2023268431562547USPP HQ BuildingProvide identification sign for the fire department connection (FDC). FDC is currently not provided with signage.FP25,
13.7.1FM/DM
Minor1
05/14/
2023268431562547USPP HQ BuildingProvide an identification tag for the fire sprinkler control valve. Control valve currently not provided with an identification tag.FP25,
13.3.2.2FM/LMSF
Minor2
05/14/
2023268431562547USPP HQ BuildingReplace dry-type sprinkler heads, or send representative samples for testing. Dry-type sprinkler heads were noted to be over 10 years old. Cost is for dry-type sprinkler head replacement. Number of sprinkler heads that require replacement is estimated in the quantity column.FP25, 5.3.1.1.1.6FM/EM
Serious20
05/14/
2023268431562547USPP HQ BuildingReplace two (2) 12V, 18A outdated batteries serving the fire alarm control panel. Batteries are outdated as they have been in use for over 5 years.FA72,
14.4.3.2FM/DM
Serious2
05/14/
202326843318474USPP HQ BuildingSystem was not tested due to main fire alarm control panel being out of service. Cost is for service call to determine extent of corrective action.FA72, 14.4.3.2FM/EM
Serious1
05/14/
202326869?????TR-IRRM Ranger BuildingNo fire alarm or sprinkler systems on site need to move from listNANANANAN/AN/AN/A
05/11/ 202327173(need asset #)Clara Barton HouseRepair/replace smoke detector. Smoke detector failed to activate alarm/report to the fire alarm control panel when tested.FA72,
14.4.3.2FM/EM
Serious2
05/11/ 202327173(need asset #)Clara Barton HouseReplace/repair the manual pull station. Manual pull station failed to operate when tested.FA72,
14.4.3.2FM/EM
Serious1
05/11/ 202327173(need asset #)Clara Barton HousePerform 5-year internal pipe examination of the fire standpipe system, including alarm/check valves and fire department connection. Cost is per system/zone.FP25,

13.4.1.2 13.4.2.1

14.2.1FM/DM
Serious1
05/11/ 202327173(need asset #)Clara Barton HouseReplace 2 (two) pressure gauges as part of 5-year maintenance.FP25,
5.3.2FM/DM
Minor2
05/11/ 202327173(need asset #)Clara Barton House5 year hydrostatic test of fire department connection (FDC) piping is due. Perform hydrostatic test of the system as required.FP25,
6.3.2.1FM/DM
Minor1
05/11/ 202327173(need asset #)Clara Barton HouseReplace two (2) 12V, 7A batteries serving the fire alarm control panel. Batteries are over five years old and should be replaced.FA72,
14.4.3.2FM/DM
Serious2
05/14/ 202316756?????Fort Hunt Maintinance BuildingPerform immediate investigation of fire alarm system outage. Fire alarm system is currently out of service, due to not having power. Cost is for a service call to determine the extent of corrective action.FA25,
5.1.1.2FM/EM
Critical1

05/14/ 2023 27278 ????? USPP - Fort Hunt Stable No alarm system is present. Existing heat detectors should be removed. NA NA NA NA N/A N/A N/A

05/14/ 202339662?????Fort Hunt TrailerSystem was not tested due to main fire alarm control panel being out of service. Cost is for service call to determine extent of corrective action.FA72, 14.4.3.2FM/EM
Serious1

05/18/ 2023 85785 ????? Wahsington Sailing Marina - Indigo Landing & Afterdeck Site is leased and responsible for its own inspections. NA NA NA NA N/A N/A N/A

05/18/ 2023 85787 ????? Wahsington Sailing Marina - Office Site is leased and responsible for its own inspections. NA NA NA NA N/A N/A N/A

05/11/ 202390327?????Columbia Island Marina OfficeAccess to a manual pull station in the kitchen is being obstructed by a shelf. Clear a path to the pull station.FA72,
17.15.9.2FM/LMSF
MinorNAN/AN/AN/A

PROJECT SUBTOTALS $0.00 $0.00 $0.00 $0.00

PROJECT TOTALS $0.00

Inspection and Testing of the Fire Protection and Life Safety Systems NCR Region August 9, 2022

EBL Project 20902.011 &P of &N