B08_SOL_-_Att_1_-_MPI_Camera_SOW.pdf
PDF 213 KB Posted
- Attached to
- Security Cameras - IACB
- Solicitation number
- 140D0426Q0473
About this file
This is a Statement of Work (SOW) for security monitoring camera installation at the Museum of the Plains Indian, operated by the Indian Arts and Crafts Board in Browning, Montana.
The contractor must provide and install 14 new Performance 2MP IP MFZ Mini Dome cameras (or equivalent models) compatible with the existing security system, along with one additional 24-port Network Video Recorder (NVR) and all necessary cabling, connectors, power supplies, and installation materials. All cameras must include night-vision capability, be fixed-position (no pan-tilt-zoom), and be NDAA compliant. The 14 new cameras will augment the existing 17 cameras (Turing TP-MFM4M28 4MP HD TwilightVision IR Mini Dome models) already in place. Cameras must be positioned at entrance and exit points to capture faces of individuals entering or exiting the museum, with final placement approved by the onsite Curator. Installation must occur Monday through Friday, 7:30 a.m. to 6:00 p.m., at 19 Museum Loop, Browning, MT 59417. Due to masonry walls, cabling will primarily run on the exterior in conduit, with any new wall penetrations requiring approval from the Contracting Officer's Representative (COR) or designee.
Deliverables include hardware installation, full system configuration and integration with existing equipment, device configuration documentation, NDAA compliance documentation, warranty information, system functionality testing, and a final report. The contractor must provide a one-year warranty covering all parts, labor, and installation, plus technical troubleshooting assistance with phone support during business hours and in-person support within five business days. All work must be completed by September 30, 2026. Within 10 working days of award, the contractor shall conduct a kick-off meeting. Site visits are optional but not required to submit a bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140D0426Q0473_Amd_0001.pdf | ||
| B08_SOL_-_Att_3_-_SCA_Verification.pdf | ||
| Sol_140D0426Q0473.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Page 1 of 3
Statement of Work (SOW) Museum of the Plains Indian Security Monitoring Camera Installation
Indian Arts and Crafts Board
1. BACKGROUND
The Indian Arts and Crafts Board (IACB), Museum of the Plains Indian (MPI) is located in Browning, Montana. The MPI displays richly varied arts of Northern Plains Tribal peoples including the Blackfeet, Crow, Northern Cheyenne, Sioux, Assiniboine, Arapaho, Shoshone, Nez Perce, Flathead, Chippewa, and Cree. Their historic clothing, horse gear, weapons, household implements, baby carriers, and toys highlight the exhibits.
2. SCOPE
The IACB, MPI requires additional cameras to be added to its existing security monitoring system to allow museum staff to monitor current blind areas in the interior and exterior of the museum.
The selected vendor shall provide and install new security cameras adhering to the specifications provided in this statement of work.
• Cameras will be placed in locations as noted on the map in Attachment 2 (Map to be provided at time of Award).
• A total of 14 cameras are to be added. The vendor shall select cameras that provide maximum area coverage. Cameras must be Performance 2MP IP MFZ Mini Dome Camera or an equivalent model and must function with the existing camera system.
• An additional Network Video Recorder (NVR), minimum 24-port is required to support the new cameras.
• The vendor shall provide all miscellaneous wires, cabling, and related materials necessary to complete the installation.
The are currently 17 cameras installed in the locations noted in Attachment 2. Those cameras shall remain in place. The existing cameras installed at the museum are Turing TP-MFM4M28 4MP HD TwilightVision IR Mini Dome Camera.
All newly installed cameras and any additional NVR equipment must be fully compatible with, and operate seamlessly alongside, the existing MPI cameras and existing 32-Channel Smart Series Performance NVR (with Turing Vision Bridge and 24-Port Gigabit PoE+ Switch). The contractor is responsible for ensuring full system compatibility.
The cameras and all components of the system must be NDAA COMPLIANT.
All camera options must include night-vision capability. All cameras are to be fixed-position, no Pan Tilt Zoom (PTZ) cameras are to be used in the system.
The cameras are to be placed in the locations indicated on the maps in Attachment 2. Before cameras are physically installed, the vendor must discuss and confirm locations with the onsite Curator to ensure maximum coverage of the area. The onsite Curator must give final approval on camera locations.
Statement of Work Page 2 of 3
Cameras must be placed at the entrances and exits of the museums in such an orientation that ensures that the faces of individuals entering/exiting the museum are captured by the security camera system.
Due to the nature of the building and the masonry walls at the Museum of the Plains Indian, cabling can only be run through walls in limited areas. Any new penetrations to the walls must be approved by the COR or onsite designee before they are performed. The cabling will have to be on the exterior of the walls and shall be in a conduit. The contractor may reuse existing cabling from the previous system provided it is in good condition.
Potential vendors can schedule a site visit of the museum, but a site visit is not required to submit a bid.
3. DELIVERABLES
Hardware
• Fourteen (14) new cameras meeting the specified model or equivalent
• One (1) additional 24-port NVR compatible with the existing system
• All required cabling, connectors, power supplies, and installation materials
Installation
• Physical installation of all new cameras in Curator-approved locations
• Installation and configuration of the new NVR and integration with all existing cameras
• Mounting, routing, and protecting cabling, including conduit where necessary
System Configuration
• Full integration of new cameras with the existing NVR system
• Configuration of camera naming, views, recording profiles, retention settings, and motion/alert settings (if applicable)
• Verification that night-vision functions operate correctly
• Optimization of camera placement to ensure maximum area coverage
Documentation
• Device configuration summary (IP addresses, naming conventions, settings)
• NVR configuration documentation
• NDAA compliance documentation for all components
• Warranty information
Testing & Verification Deliverables
• System functionality test demonstrating proper recording from all cameras
• Walkthrough with the onsite Curator
Final Handover Deliverables
• Complete deliverables package submitted electronically (PDF or shared drive)
• Final report summarizing work completed, issues encountered, and confirmation of system compatibility
4. WARRANTY
Vendor must provide the following:
• A full one-year warranty covering all parts, labor, and installation.
Statement of Work Page 3 of 3
• Technical troubleshooting assistance in the event of system failure:
– Phone and in-person support available
– Phone assistance available during business hours
– In-person support response within five (5) business days of the initial request, unless otherwise coordinated with the COR or Curator.
5. PLACE OF PERFORMANCE
Museum of the Plains Indian
The contractor will perform the work at the Museum of the Plains Indian located at 19 Museum Loop, Browning, MT 59417.
6. KICK-OFF MEETING
Within 10 working days of award, the contractor shall conduct an orientation briefing for the Government. The intent of the briefing is to initiate the communication process between the Government and contractor by introducing key task participants and explaining their roles, reviewing communication ground rules, and assuring a common understanding of subtask requirements and objectives.
7. PERIOD OF PERFORMANCE
All work shall be completed by September 30, 2026. Upon award, the contractor shall coordinate with the COR and the onsite Curator to schedule installation activities. All installation work shall be performed Monday through Friday, between the hours of 7:30 a.m. and 6:00 p.m.
8. GOVERNMENT FURNISHED EQUIPMENT
N/A
9. CONTRACTOR FURNISHED ITEMS AND SERVICES
N/A
10. CONTACT INFORMATION
Renee Bear Medicine MPI Curator Indian Arts and Crafts Board 19 Museum Loop Browning, MT 59417 Email: Renee_BearMedicine@ios.doi.gov 406-338-2230
Michele Hill Administrative Officer Indian Arts and Crafts Board Tel: 202-208-3286 Email: Michele_Hill@ios.doi.gov
File details come from the government source that posted it. Updated .