B08_Section_J_Attachment_1_YELL-310533_FinalCD_OFWTP_Specs_8-16-2024.pdf

PDF 6 MB Posted

Attached to
YELL 310533 Rehabilitate and Improve Old Faithful
Solicitation number
140P2024R0050
Issued by

About this file

This document is a set of project specifications for the YELL 310533 Rehabilitate and Improve Old Faithful Water Treatment System project in Yellowstone National Park, Wyoming.

The key details are:

The project scope includes constructing a new CMU water treatment plant building and roof, providing water treatment equipment and controls, demolishing and replacing existing infrastructure, and rehabilitating existing facilities. The work covers the Old Faithful Water Treatment Plant and the Raw Water Intake at the Firehole River. The solicitation is being issued by the Department of the Interior National Park Service. Various optional work items are also identified, including demolition and replacement of the Backwash Pond Pumphouse roof and demolition of the existing water treatment plant building. The document provides detailed requirements for the construction materials, work restrictions, protection of natural features, and other project-specific information.

View the file

Other files

File Type Posted
B09-140P2024R0050-Amd_11_0011.pdf PDF
Sol_140P2024R0050_Amd_0011.pdf PDF
Amendment_10_140P2024R0050_0010.pdf PDF
Sol_140P2024R0050_Amd_0010.pdf PDF
B09__Amend_09_140P2024R0050_Attachments_0009.pdf PDF
Sol_140P2024R0050_Amd_0009.pdf PDF
B09-140P2024R0050-Amd_8_0008.pdf PDF
Sol_140P2024R0050_Amd_0008.pdf PDF
1980_OF_WTPplans_YELL_101_41195A_0008.pdf PDF
Amendment_8_SubKPlanForm__0008.docx DOCX document
Amendment_8_SMALL_BUSINESS_PARTICIPATION_DOCUMENT_0008.docx DOCX document
B09_Amend_7_140P2024R0050_Attachment_0007.pdf PDF
Sol_140P2024R0050_Amd_0007.pdf PDF
Sol_140P2024R0050_Amd_0006.pdf PDF
Sol_140P2024R0050_Amd_0005.pdf PDF
B09_Attachment_Amend_5_140P2024R0050_0005.pdf PDF
Sol_140P2024R0050_Amd_0004.pdf PDF
B09_Amend_4_140P2024R0050_0004.pdf PDF
Amendment_3_Attachments_0003.pdf PDF
Sol_140P2024R0050_Amd_0003.pdf PDF
Sol_140P2024R0050_Amd_0002.pdf PDF
B09-140P2024R0050-Amd_2_0002.pdf PDF
1_OFmtgOverview_1_0001.pdf PDF
2_OFmtg_1_0001.pdf PDF
Sol_140P2024R0050_Amd_0001.pdf PDF
B08-Attachment_9_-_YELL_WWTPS_Geotechnical_Interpretive_Report_20230804.pdf PDF
YELL-310533_FinalCD_OFWTP_Dwgs_Unsecure_8-16-2024_Part1.pdf PDF
YELL-310533_FinalCD_OFWTP_Dwgs_Unsecure_8-16-2024_Part2.pdf PDF
YELL-310533_FinalCD_OFWTP_Dwgs_Unsecure_8-16-2024_Part3.pdf PDF
Sol_140P2024R0050.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YELLOWSTONE NATIONAL PARK

WYOMING

REHABILITATE AND IMPROVE OLD FAITHFUL

WATER TREATMENT SYSTEM

YELL

310533

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE (NPS)

DENVER SERVICE CENTER (DSC)

NATIONAL PARK SERVICE

YELLOWSTONE NATIONAL PARK, WYOMING

OLD FAITHFUL WATER TREATMENT PLANT

CONTRACT DOCUMENTS

for the construction of the

YELL 310533 REHABILITATE AND IMPROVE OLD FAITHFUL

WATER TREATMENT SYSTEM

FINAL CONSTRUCTION DOCUMENTS

JACOBS

Loveland, Colorado

August 2024

Project No. D3167656 Copy No.

PW\JA\NPS\D3167656\4\42 SEALS PAGE

AUGUST 2024 00 01 07 - 1

YELL 310533

SECTION 00 01 07

SEALS PAGE

See Table of Contents for author of each specification section, identified by author’s initials as follows:

AUTHOR’S NAME = INITIALS

SCOTT HOFFMAN = SH JANA DEWEY MCKENZIE = JDM

GEOFFREY B. KIRSTEN = GBK LUKE A. SCOGGINS = LAS

JONATHAN JAMES = JJ KILE SNIDER = KS

SPECIFICATIONS

Digitally Signed on

August 16, 2024

Kile Snider

SEALS PAGE PW\JA\NPS\D3167656\4\42

00 01 07 - 2 AUGUST 2024

YELL 310533

Digitally Signed on

Scott Hoffman

AUGUST 2024 00 01 07 - 3

YELL 310533

Geoffrey B. Kirsten

08/16/2024

00 01 07 - 4 AUGUST 2024

YELL 310533

Jonathan James

008/1 5/20

OCTOBER 2023 00 01 07 - 5

YELL-310533

Digitally Signed on

October 18, 2023

Jana Dewey Mckenzie

00 01 07 - 6 APRIL 2024

YELL 310533

Digitally Signed on

April 30, 2024

Luke A. Scoggins

END OF SECTION

04/30/2024

PW\JA\NPS\D3167656\4\42 TABLE OF CONTENTS

AUGUST 2024 00 01 10 - 1

YELL 310533

TABLE OF CONTENTS

Person Section Responsible Title Pages

SPECIFICATIONS

DIVISION 01—GENERAL REQUIREMENTS

01 11 00 KS Summary of Work ....................................................................... 1- 18 01 12 00 KS Natural Features Protection ......................................................... 1- 4 01 26 01 KS Contract Modification Procedures .............................................. 1- 6 01 27 00 KS Definition of Contract Line Items ............................................... 1- 5 01 31 00 KS Project Management and Coordination ...................................... 1- 18 01 32 16 KS Construction Schedule ................................................................ 1- 12 01 32 33 KS Photo Documentation.................................................................. 1- 3 01 33 23 KS Submittal Procedures .................................................................. 1- 9 Supplement:

KS Submittal List .............................................................................. 1- 26 01 35 23 KS Safety Requirements ................................................................... 1- 6 01 40 00 KS Quality Requirements ................................................................. 1- 8 01 42 00 KS Reference Standards.................................................................... 1- 14 01 45 33 LAS Special Inspection, Observation, and Testing ............................. 1- 6 Supplement:

LAS Contractor’s Statement of Responsibility ................................... 1- 2 01 50 00 KS Temporary Facilities and Controls .............................................. 1- 16 01 57 19.11 KS Indoor Air Quality Management ................................................. 1- 7 01 57 19.12 KS Noise and Acoustics Management .............................................. 1- 3 01 57 23 KS Temporary Storm Water Pollution Prevention ........................... 1- 9 01 67 00 KS Product Requirements ................................................................. 1- 10 Supplements:

KS Affirmative Procurement Reporting Form .................................. 1- 2 KS Manufacturer’s Certificate of Proper Installation ....................... 1- 1 KS Manufacturer’s Certificate of Compliance ................................. 1- 1 01 73 29 KS Cutting and Patching ................................................................... 1- 4 01 73 40 KS Execution .................................................................................... 1- 8 01 74 19 KS Construction Waste Management and Disposal ......................... 1- 9 Supplement:

KS Project Waste Management Plan Worksheet Sample ................. 1- 2 01 77 00 KS Closeout Procedures.................................................................... 1- 5 01 78 23 KS Operation and Maintenance Data ................................................ 1- 9 Supplements:

KS Equipment Data Sheet................................................................. 1- 1 KS Closeout and Operation & Maintenance (O&M) Requirements Template ........................................................... 1- 1

Person Section Responsible Title Pages

TABLE OF CONTENTS PW\JA\NPS\D3167656\4\42

00 01 10 - 2 AUGUST 2024

YELL 310533

01 79 00 KS Demonstration and Training ....................................................... 1- 3 01 81 13 KS Sustainable Design Requirements............................................... 1- 4 01 88 15 LAS Anchorage and Bracing ............................................................... 1- 6 01 91 14 KS Total Building Commissioning ................................................... 1- 13 01 91 15 KS Process Equipment Testing and Facility Startup ........................ 1- 10 Supplements:

KS Unit Process Startup Form .......................................................... 1- 1 KS Facility Performance/Demonstration Certification Form ........... 1- 1

DIVISION 02—EXISTING CONDITIONS

02 41 00 KS Demolition .................................................................................. 1- 11 02 81 00 KS Transportation and Disposal of Hazardous Materials ................. 1- 11 Supplement:

KS Attachment A: Sample Offsite Policy Certification Memo ........ 1- 1 02 82 00 KS Asbestos Remediation ................................................................. 1- 31 02 83 00 KS Lead Remediation ....................................................................... 1- 18 02 84 16 KS Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury ............................................................................. 1- 7 02 84 33 KS Removal and Disposal of Polychlorinated Biphenyls (PCBs) ..................................................................................... 1- 11

DIVISION 03—CONCRETE

03 01 32 LAS Repair of Vertical and Overhead Concrete Surfaces .................. 1- 12 03 01 33 LAS Repair of Horizontal Concrete Surfaces ..................................... 1- 12 03 10 00 LAS Concrete Forming and Accessories ............................................ 1- 6 03 15 00 LAS Concrete Joints and Accessories ................................................. 1- 7 03 21 00 LAS Steel Reinforcement .................................................................... 1- 5 03 30 00 LAS Cast-in-Place Concrete................................................................ 1- 27 Supplements:

LAS Concrete Mix Design, Class 4500F2S1W1C1............................ 1- 2 LAS Concrete Mix Design, Class GM3500F1S1W1C1 ..................... 1- 1 LAS Concrete Mix Design, Class 3500F1S1W1C1............................ 1- 2 03 39 00 LAS Concrete Curing .......................................................................... 1- 5 03 62 00 LAS Grouting ...................................................................................... 1- 10 Supplement:

LAS 24-hour Evaluation of Nonshrink Grout Test Form and Grout Testing Procedures .................................................. 1- 3 03 63 00 LAS Concrete Doweling ..................................................................... 1- 4 03 64 23 LAS Epoxy Resin Injection Grouting ................................................. 1- 11 03 64 24 LAS Polyurethane Injection Grouting ................................................. 1- 9

AUGUST 2024 00 01 10 - 3

YELL 310533

DIVISION 04—MASONRY

04 21 13.13 GBK Masonry Veneer .......................................................................... 1- 12 04 22 00 LAS Concrete Unit Masonry ............................................................... 1- 14

DIVISION 05—METALS

05 05 19 LAS Post-Installed Anchors ................................................................ 1- 9 05 05 23 LAS Welding ....................................................................................... 1- 6 Supplement:

LAS Welding and Nondestructive Testing Table ............................... 1- 1 05 12 00 LAS Structural Steel Framing ............................................................. 1- 13 05 31 00 LAS Steel Decking .............................................................................. 1- 6 05 41 00 LAS Structural Metal Stud Framing .................................................... 1- 7 05 50 00 LAS Metal Fabrications ...................................................................... 1- 17 05 52 16 LAS Aluminum Railings ..................................................................... 1- 8 05 53 00 LAS Metal Gratings ............................................................................ 1- 6

DIVISION 06—WOOD, PLASTICS, AND COMPOSITES

06 10 00 GBK Rough Carpentry ......................................................................... 1- 8 06 41 00 GBK Architectural Wood Casework .................................................... 1- 10 06 82 00 LAS Glass-Fiber-Reinforced Plastic ................................................... 1- 7

DIVISION 07—THERMAL AND MOISTURE PROTECTION

07 14 00 GBK Fluid-Applied Waterproofing ..................................................... 1- 5 07 15 00 GBK Air and Water Barriers ................................................................ 1- 12 07 19 00 GBK Water Repellents ......................................................................... 1- 4 07 21 00 GBK Thermal Insulation ...................................................................... 1- 6 07 26 16 GBK Belowgrade Vapor Retarders ...................................................... 1- 3 07 41 13 GBK Metal Roof, Wall, and Soffit Panels ........................................... 1- 20 07 62 00 GBK Sheet Metal Flashing and Trim ................................................... 1- 7 07 70 01 GBK Roof Specialties and Accessories ............................................... 1- 4 07 84 00 GBK Firestopping ................................................................................ 1- 6 07 92 00 GBK Joint Sealants .............................................................................. 1- 9

DIVISION 08—OPENINGS

08 11 00 GBK Metal Doors and Frames ............................................................. 1- 5 08 30 00 GBK Specialty Doors ........................................................................... 1- 6 08 41 13 GBK Aluminum-Framed Windows ..................................................... 1- 8 08 45 00 GBK Translucent Wall Assemblies ..................................................... 1- 9 08 71 00 GBK Door Hardware ............................................................................ 1- 15

00 01 10 - 4 AUGUST 2024

YELL 310533

08 80 00 GBK Glazing ........................................................................................ 1- 12 08 90 00 GBK Louvers ....................................................................................... 1- 4

DIVISION 09—FINISHES

09 22 16 GBK Nonstructural Metal Framing ...................................................... 1- 4 09 29 00 GBK Gypsum Board ............................................................................ 1- 14 09 30 00 GBK Tiling ........................................................................................... 1- 10 09 51 13 GBK Acoustical Panel Ceilings ........................................................... 1- 5 09 65 00 GBK Resilient Flooring........................................................................ 1- 9 09 90 00 KS Painting and Coating ................................................................... 1- 28 Supplements:

KS Paint System Data Sheet (PSDS) ................................................ 1- 1 KS Paint Product Data Sheet (PPDS) ............................................... 1- 1 KS Volatile Organic Compound (VOC) Limit List .......................... 1- 2 09 96 35 KS Chemical-Resistant Coatings ...................................................... 1- 6 Supplements:

KS Corrosion Control Assistance Form............................................ 1- 1 KS Volatile Organic Compound (VOC) Limit List .......................... 1- 1

DIVISION 10—SPECIALTIES

10 14 00 GBK Signage ........................................................................................ 1- 8 Supplement:

GBK Sign Schedule.............................................................................. 1- 6 10 28 00 GBK Toilet and Bath Accessories........................................................ 1- 8 10 44 00 GBK Fire Protection Specialties and Safety Equipment ...................... 1- 4 10 51 00 GBK Lockers and Benches .................................................................. 1- 4 10 80 00 GBK Miscellaneous Specialties ........................................................... 1- 4

DIVISION 11—EQUIPMENT

11 31 00 GBK Appliances................................................................................... 1- 2 11 53 00 GBK Laboratory Equipment ................................................................ 1- 9

DIVISION 12—FURNISHINGS

12 35 53 GBK Laboratory Casework .................................................................. 1- 18 12 49 00 GBK Roller Shades .............................................................................. 1- 6 12 50 00 GBK Furniture ...................................................................................... 1- 3 Supplement:

GBK Furniture Data Sheets .................................................................. 1- 8

AUGUST 2024 00 01 10 - 5

YELL 310533

DIVISION 13—SPECIAL CONSTRUCTION

13 34 19 LAS Metal Building Systems .............................................................. 1- 12

DIVISION 14 THROUGH DIVISION 21 (NOT USED)

DIVISION 22—PLUMBING

22 05 48 SH Vibration Isolation and Seismic Control for Plumbing and Equipment ......................................................... 1- 13 22 07 00 SH Plumbing Piping Insulation......................................................... 1- 7 22 10 01 SH Plumbing Piping and Accessories ............................................... 1- 29 22 10 01.02 SH Polyvinyl Chloride Drain Waste and Vent (PVC-DWV) Pipe and Fittings Data Sheet .................................................... 1- 1 22 10 01.10 SH Carbon Steel Tubing and Fittings Data Sheet ............................. 1- 1 22 10 01.13 SH High-Density Polyethylene (HDPE) Pipe and Fittings— Propane and Liquefied Petroleum Gas (LPG) Service Data Sheet ................................................................................ 1- 2 22 30 00 SH Plumbing Equipment .................................................................. 1- 10 Supplements:

SH Gas Water Heater (Commercial) Data Sheet .............................. 1- 1 SH Domestic Water Expansion Tank Data Sheet ............................. 1- 1 SH Domestic Hot Water Circulating Pump Data Sheet

– Performance Characteristics ................................................. 1- 1 SH Hydropneumatic Tank Data Sheet .............................................. 1- 1 SH Simplex, Submersible Sump Pump Data Sheet

– Performance Characteristics ................................................. 1- 1 SH Duplex, Submersible Sump Pump Data Sheet

– Performance Characteristics ................................................. 1- 1 SH Backflow Preventer Data Sheet .................................................. 1- 1 22 40 00 SH Plumbing Fixtures ....................................................................... 1- 11

DIVISION 23—HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 48 SH Vibration Isolation and Seismic Control for HVAC Piping and Equipment ......................................................................... 1- 13 23 05 93 SH Testing, Adjusting, and Balancing for HVAC ............................ 1- 6 23 07 00 SH HVAC Insulation ........................................................................ 1- 11 23 09 00 SH Instrumentation and Control Devices for HVAC ....................... 1- 15 23 09 13 SH HVAC Controls, Field Components, and Instruments ............... 1- 11 23 09 23 SH Direct-Digital Control System for HVAC .................................. 1- 18 23 23 00 SH Refrigerant Piping ....................................................................... 1- 8 23 31 13 SH Metal Ducts and Accessories ...................................................... 1- 28

00 01 10 - 6 AUGUST 2024

YELL 310533

23 34 00 SH HVAC Fans ................................................................................. 1- 14 23 37 00 SH Air Outlets and Inlets .................................................................. 1- 4 23 81 00 SH Unitary Air-Conditioning Equipment ......................................... 1- 18 23 82 00 SH Terminal Heating and Cooling Units .......................................... 1- 10

DIVISION 24 AND DIVISION 25 (NOT USED)

DIVISION 26—ELECTRICAL

26 05 02 JJ Basic Electrical Requirements .................................................... 1- 9 26 05 04 JJ Basic Electrical Materials and Methods ..................................... 1- 13 26 05 05 JJ Conductors .................................................................................. 1- 10 26 05 26 JJ Grounding and Bonding for Electrical Systems ......................... 1- 6 26 05 33 JJ Raceway and Boxes .................................................................... 1- 29 26 05 70 JJ Electrical Systems Analysis ........................................................ 1- 8 Supplement:

JJ Figure 1: Example Arc Flash Label ............................................ 1- 1 26 08 00 JJ Commissioning of Electrical Systems ........................................ 1- 20 26 09 13 JJ Power Measurement and Control ................................................ 1- 4 26 14 13 JJ Switchboards ............................................................................... 1- 9 26 20 00 JJ Low-Voltage AC Induction Motors ............................................ 1- 9 26 22 00 JJ Low-Voltage Transformers ......................................................... 1- 5 26 24 16 JJ Panelboards ................................................................................. 1- 7 26 24 19 JJ Low-Voltage Motor Control ....................................................... 1- 15 26 27 26 JJ Wiring Devices ........................................................................... 1- 12 26 29 23 JJ Low-Voltage Adjustable Frequency Drive System .................... 1- 9 26 32 13.16 JJ Propane Engine Generator Set .................................................... 1- 14 26 33 53 JJ Static Uninterruptible Power Supply .......................................... 1- 13 26 36 23 JJ Automatic Transfer Switches ...................................................... 1- 6 26 42 01 KS Pipe Bonding and Test Stations .................................................. 1- 16 Supplement:

KS Joint Bond Continuity Test Schematic ....................................... 1- 1 26 42 02 KS Galvanic Anode Cathodic Protection System ............................. 1- 8 26 42 03 KS Under Tank Cathodic Protection System .................................... 1- 7 26 43 00 JJ Surge Protective Devices ............................................................ 1- 6 26 50 00 JJ Lighting ....................................................................................... 1- 11

DIVISION 27—COMMUNICATIONS

27 13 13 JJ Communications Copper Cabling Systems ................................... 1- 14

AUGUST 2024 00 01 10 - 7

YELL 310533

DIVISION 28—ELECTRONIC SAFETY AND SECURITY

28 31 00 JJ Fire Detection and Alarm............................................................... 1- 25 Supplement:

JJ Sequence of Operations Matrix ..................................................... 1- 1

DIVISION 29 AND DIVISION 30 (NOT USED)

DIVISION 31—EARTHWORK

31 10 00 JDM Site Clearing................................................................................ 1- 8 31 23 13 KS Subgrade Preparation .................................................................. 1- 3 31 23 16 KS Excavation................................................................................... 1- 5 31 23 19.01 KS Dewatering .................................................................................. 1- 4 31 23 23 KS Fill and Backfill .......................................................................... 1- 11 31 23 23.15 KS Trench Backfill ........................................................................... 1- 12 31 32 19.16 KS Geotextile .................................................................................... 1- 9 31 37 00 KS Riprap .......................................................................................... 1- 4 31 41 00 KS Shoring ........................................................................................ 1- 2 31 50 00 KS Excavation Support and Protection ............................................. 1- 12

DIVISION 32—EXTERIOR IMPROVEMENTS

32 11 23 KS Aggregate Base and Subbase Courses ........................................ 1- 7 32 31 26 KS Woven Wire Fences and Gates ................................................... 1- 9 32 91 19.13 JDM Topsoil Placement and Grading .................................................. 1- 5 32 92 00 JDM Turf and Grasses ......................................................................... 1- 4

DIVISION 33—UTILITIES

33 05 01.02 KS Ductile Iron Pipe and Fittings ..................................................... 1- 12 33 05 01.09 KS Polyvinyl Chloride (PVC) Pressure Pipe and Fittings ................ 1- 6 33 05 13 KS Manholes ..................................................................................... 1- 13 33 05 16.13 KS Precast Concrete Utility Structure .............................................. 1- 6 33 12 16 KS Water Utility Distribution Valves ............................................... 1- 6 33 12 19 KS Water Utility Distribution Fire Hydrants .................................... 1- 4 33 13 00 KS Disinfection of Water Utility Distribution Facilities .................. 1- 6 33 41 01 KS Storm Drain, Sanitary Sewer, and Drainage Piping ................... 1- 5 33 41 01.01 KS Corrugated Metal Data Sheet ...................................................... 1- 1 33 41 01.03 KS Polyvinyl Chloride (PVC) Data Sheet ........................................ 1- 2 33 41 01.05 KS Reinforced Concrete Data Sheet ................................................. 1- 3 33 41 01.08 KS Corrugated Polyethylene (CPE) Data Sheet ............................... 1- 1 33 44 13.13 KS Catch Basins................................................................................ 1- 4 33 46 00 KS Subsurface Drainage ................................................................... 1- 9

00 01 10 - 8 AUGUST 2024

YELL 310533

DIVISION 34 (NOT USED)

DIVISION 35—WATERWAY AND MARINE CONSTRUCTION

35 20 16.24 KS Full-Aperture Sealing Slide Gates .............................................. 1- 12 35 20 16.27 KS Radial Gate.................................................................................. 1- 9

DIVISION 36 THROUGH DIVISION 39 (NOT USED)

DIVISION 40—PROCESS INTERCONNECTIONS

40 05 15 KS Piping Support Systems .............................................................. 1- 14 Supplements:

KS Table 1: Nonchemical Areas ....................................................... 1- 1 KS Table 2: Chemical Areas ............................................................. 1- 1 40 05 33 KS Pipe Heat Tracing ....................................................................... 1- 6 40 27 00 KS Process Piping—General ............................................................ 1- 21 40 27 00.01 KS Cement-Mortar and Ceramic-Epoxy-Lined Ductile Iron Pipe and Fittings Data Sheet ............................................ 1- 5 40 27 00.03 KS Carbon Steel Pipe and Fittings—General Service Data Sheet ................................................................................ 1- 6 40 27 00.08 KS Stainless Steel Pipe and Fittings—General Service Data Sheet ................................................................................ 1- 4 40 27 00.10 KS Polyvinyl Chloride (PVC) Pipe and Fittings Data Sheet ............ 1- 3 40 27 00.13 KS Copper and Copper Alloy Pipe, Tubing, and Fittings Data Sheet ................................................................................ 1- 2 40 27 00.15 KS Double Wall Containment Piping Data Sheet ............................ 1- 3 40 27 01 KS Process Piping Specialties........................................................... 1- 15 40 27 02 KS Process Valves and Operators ..................................................... 1- 29 40 42 13 KS Process Piping Insulation ............................................................ 1- 7 Supplement:

KS Service and Insulation Thickness Table ..................................... 1- 1 40 80 01 KS Process Piping Leakage Testing ................................................. 1- 5 40 90 00 JJ Instrumentation and Control for Process Systems ...................... 1- 40 Supplements:

JJ Control Descriptions ................................................................... 1- 14 JJ Control Panel Schedule ............................................................... 1- 1 JJ Instrument List ............................................................................ 1- 6 JJ PLC Input/Output List ................................................................ 1- 7 JJ Preparation for Testing and Functional Test Forms ................... 1- 3 JJ Performance Test Sheet .............................................................. 1- 1

AUGUST 2024 00 01 10 - 9

YELL 310533

40 91 00 JJ Instrumentation and Control Components .................................. 1- 54 40 96 00 JJ Applications Software ................................................................. 1- 21 40 99 90 JJ Package Control Systems ............................................................ 1- 48

DIVISION 41—MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 13 13.29 KS Manual Bag System with Mix Tank ........................................... 1- 10 41 22 23.19 KS Monorail Hoists and Portable Davit Crane ................................. 1- 9 Supplements:

KS Sodium Bicarbonate Monorail Data Sheet ................................. 1- 1 KS Sodium Bicarbonate Monorail Dimension Sheet ....................... 1- 1 KS Sodium Bicarbonate Trolley Motor Data Sheet .......................... 1- 1 KS Vertical Turbine Pumps Monorails Data Sheet .......................... 1- 1 KS Vertical Turbine Pumps Monorails Dimension Sheet ................ 1- 1

DIVISION 42 (NOT USED)

DIVISION 43—PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND

STORAGE EQUIPMENT

43 40 01 KS Polyethylene Storage Tank ......................................................... 1- 11 Supplements:

KS Sodium Hypochlorite Tank 1 Fitting/Opening Schedule............ 1- 1 KS Sodium Hypochlorite Tank 2 Fitting/Opening Schedule............ 1- 1 KS Sodium Hydroxide Tank 1 Fitting/Opening Schedule ................ 1- 1 KS Sodium Hydroxide Tank 2 Fitting/Opening Schedule ................ 1- 1 KS Coagulant Tank 1 Fitting/Opening Schedule .............................. 1- 1 KS Coagulant Tank 2 Fitting/Opening Schedule .............................. 1- 1 KS Filter Aid Polymer Solution Tank 1 Fitting/Opening Schedule ................................................................................... 1- 1 KS Filter Aid Polymer Solution Tank 2 Fitting/Opening Schedule ................................................................................... 1- 1

DIVISION 44—POLLUTION AND WASTE CONTROL EQUIPMENT

44 42 56.03 KS Vertical Turbine Pumps .............................................................. 1- 9 Supplements:

KS Backwash Supply Pumps 1 and 2 Data Sheet ............................. 1- 3 KS House Water Pumps 1 and 2 Data Sheet .................................... 1- 3 44 42 56.10 KS Screw-Induced Flow Centrifugal Pumps .................................... 1- 7 Supplement:

KS Decant Pump Data Sheet ............................................................ 1- 2

00 01 10 - 10 AUGUST 2024

YELL 310533

44 42 56.14 KS Lobe Pumps ................................................................................ 1- 9 Supplement:

KS Sludge Pump Data Sheet ............................................................. 1- 2 44 43 30 KS Packaged Polymer and Dewatering System ............................... 1- 11 44 44 13.01 KS Chemical Feed Systems .............................................................. 1- 19 Supplement:

KS Chemical Feed System Schedule ................................................ 1- 2 44 44 59 KS Package Water Treatment System .............................................. 1- 48 Supplement:

KS Package Water Treatment System Process Control Descriptions ................................................................ 1- 6 44 44 63.01 KS Polymer Feed System, Liquid ..................................................... 1- 10

DIVISION 45 THROUGH DIVISION 49 (NOT USED)

DRAWINGS

SPECIFICATIONS

PW\JA\NPS\D3167656\4\42 SUMMARY OF WORK

AUGUST 2024 01 11 00 - 1

YELL 310533 REV. 5/11/2021

SECTION 01 11 00 – SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

A. Section includes the following:

1. Work Covered by Contract Documents.

2. Work Under Other Contracts.

3. Government Furnished Materials.

4. Materials and Work by Others.

5. Contractor Use of Sites.

6. Public Use of Sites.

7. Administrative Access During Construction.

8. Access During Construction.

9. Occupancy Requirements for Buildings.

10. Conduct of Operations.

11. Work Restrictions.

12. Special Construction Requirements.

13. Soils Investigation Report.

14. Unexpected Discovery of Archeological Resources.

15. Construction Materials.

16. Project Clean Up.

1.2 DEFINITIONS

A. Demolish: Means to remove and dispose.

B. Provide: Means to furnish and install.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location:

1. Yellowstone National Park: Old Faithful Village, Teton County Wyoming. Old Faithful Water Treatment Plant, and Raw Water Intake at Firehole River.

B. Contractor shall procure all items they are providing. “Provide” means to furnish and install and provide complete in place.

C. Project will be constructed under a single prime contract.

D. Project is designed to comply with requirements as specified in Section 01 81 13, Sustainable Design Requirements.

SUMMARY OF WORK PW\JA\NPS\D3167656\4\42

01 11 00 - 2 AUGUST 2024

REV. 5/11/2021 YELL 310533

E. Completion of each item includes all materials, labor, transportation, material processing plants, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the Work as described in the construction drawings and these specifications.

F. The Work required in the base scope as described in Section 01 27 00, Definition of Contract Line Items, includes the following work as described herein, but not limited to:

1. General Conditions: Include General Requirements, Mobilization/Demobilization, Permitting, Erosion Control, Maintenance of Traffic, and Surface Restoration required to complete the Work per Contract Specifications and Drawings.

2. Old Faithful Water Treatment Plant includes the following work described herein, but not limited to:

a. Construct new CMU water treatment plant building and roof including, but not limited to, a laboratory, control room, server room, break room, electrical room, process area, chemical rooms with containment areas, a below ground chlorine contact basin and backwash supply wetwell, an upper-level entrance and a lower-level loading dock.

b. Provide interior and exterior piping, pipe supports, gates, gate operators, valves, valve operators, and valve supports.

c. Provide instrumentation and analyzers as shown including flow meters, pressure gages, pressure transmitters, level indicators and transmitters, turbidity analyzers, pH analyzers, and chlorine analyzers.

d. Provide a Process Control System (PCS) including and not limited to the main plant PLC, SCADA servers, operator workstations, network switches and firewalls.

e. Provide laboratory furnishings and equipment including sink, cabinets, refrigerator and desktop laboratory equipment.

f. Provide water treatment package system including but not limited to:

1) 2nd stage rapid mix, flocculation, sedimentation and filtration tanks, and associated structural supports.

2) Walkway platforms, stairs and structural supports along the flocculation, sedimentation and filtration tanks.

3) Vertical rapid mixer, vertical flocculation mixers, sedimentation equipment, sludge removal equipment, filtration media, filtration equipment, two air scour blowers with sound enclosure, two vertical turbine backwash supply pumps, appurtenances, and controls.

4) Control panels and programming for the rapid mix flocculation, sedimentation and filtration system to control the treatment process and communicate with the plant PLC.

AUGUST 2024 01 11 00 - 3

YELL 310533 REV. 5/11/2021

g. Provide two vertical turbine house water pumps, appurtenances, and controls.

h. Provide liquid chemical fill, storage, feed and control systems for sodium hypochlorite, sodium hydroxide, ferric chloride, coagulant, coagulant polymer, filer aid polymer and solids polymer.

i. Provide dry chemical storage, feed and control system for sodium bicarbonate.

j. Provide portable standby generator connection switchboard and manual transfer switch.

k. Provide transformer pad and ground sleeve in accordance with Northwestern Energy (NWE) standards. Install the transformer. Provide meter enclosure and Current Transformer (CT) enclosure. Provide raceway between transformer pad and CT enclosure. Provide raceway and conductors between current enclosure and meter enclosure. Provide raceway and conductors on the load side of the CT enclosure.

l. Apply to and coordinate with the serving electric utility to provide service to the facility.

m. Apply to and coordinate with the serving telephone utility to provide service to the facility.

n. Provide unit heaters, direct expansion split air conditioning systems, supply and exhaust fans, sump pump, two water heaters, and emergency safety eye wash and shower units.

o. Construct dewatering pad and provide associated piping, valves, geotextile tubes, and roll-off containers.

p. Procure and have ready pipe and fittings needed to repair existing 12-inch raw water pipe or finished water pipe, made of Techite brand reinforced plastic mortar (fiberglass) material, in the event of a pipe leak or failure.

q. Demolish existing septic tank and existing leach field and associated piping. Remove unsuitable soils for preparation to construct the new septic tank and leach field.

r. Provide new septic tank and construct new sand mound leach field.

s. Demolish the existing Storage Building (old wooden shed) as shown.

t. Modify existing observation well SW-OF-10W to be flush with finished grade and comply with Wyoming Administrative Code, Chapter 26 Well Construction Standards.

u. Provide underground propane storage tanks and associated valves and controls.

v. Coordinate with telecom company to maintain existing service and provide telephone service through a landline to the new water treatment plant building location.

w. Contractor shall reblade the access road from the highway to the plant site after substantial completion.

x. Confirm location of onsite utilities with potholing or other method.

01 11 00 - 4 AUGUST 2024

REV. 5/11/2021 YELL 310533

y. Rehabilitate existing backwash waste ponds as shown including:

1) Demolish existing concrete in pond.

2) Demolish existing decant piping.

3) Provide new concrete ramp, bottom and wall.

4) Provide new decant piping in the pond.

5) Restore pond slope as shown.

6) Provide new underdrain around the north backwash waste pond.

7) Demolish existing fence and gates.

8) Provide a new steel drill stem wire mesh fence and gates around the backwash ponds.

z. Rehabilitate existing Backwash Pond Pumphouse as shown including:

1) Demolish decant pump, sludge pump, piping, valves, valve operators, level instrument, and related appurtenances.

2) Patch concrete floor where valve operators were removed.

3) Provide new decant pump and controls, sludge pump and controls, piping, valves, valve operators, level instrument, and related appurtenances.

aa. Demolish yard piping and utilities as shown. Utilities that cross into the delineated wetlands (outside of the limits of construction) are to be abandoned in place. Plug yard piping and abandon as shown to avoid disturbing adjacent wetlands.

bb. Provide temporary utilities as shown including, but not limited to, the following:

1) Demolish segments of existing power, communications, backwash waste, decant, and non-potable water piping to/from the existing WTP Process Building to the Backwash Pond Pumphouse as needed to construction the new WTP Process Building.

a) Temporarily reroute power, communications, non-potable water, and backwash waste lines as shown.

b) Construct new decant pipe as shown.

2) Demolish temporary utilities when new WTP is complete.

cc. Selective demolition of trees and other vegetation outside of construction impact area to create wildfire defensible zones. Tree removal within protected wetland areas to meet the wildfire defensible zones shall protect wetland vegetation and shall be done with handheld equipment; no wheeled equipment is allowed in protected wetland areas.

AUGUST 2024 01 11 00 - 5

YELL 310533 REV. 5/11/2021

dd. Restore all landscape disturbed by demolition, construction, or temporary facilities including preparing topsoil, fine grading, and mulching.

ee. Provide fiber in a duct from the water treatment plant building down to the Grand Loop Road along the access road for future connection. Provide new hand hole at the Grand Loop Road. Terminate fiber run and provide 20 feet of coiled spare fiber.

ff. Provide phone service to the new water treatment plant building to support phone, internet and fire alarm.

gg. Provide a fire detection and alarm system in the new water treatment plant building.

3. Presedimentation Pond Soil Nail Wall includes the following work described herein, but not limited to:

a. Design and provide a soil nail wall along the west side of the Presedimentation Pond.

b. Demolish the section of fence along the Presedimentation Pond that is required to construct the Soil Nail Wall. Replace demolished section with new fence.

c. Confirm location of onsite utilities with potholing or other method.

G. The optional work items as described in Section 01 27 00, Contract Line Items, includes the following work as described herein, but not limited to:

1. Rehabilitate Raw Water Intake at Firehole River includes the following work described herein, but not limited to:

a. Install and maintain temporary cofferdams in the Firehole River for the purpose of isolating and dewatering the structures to be repaired.

b. Install and maintain a temporary water diversion for the purpose of delivering raw water to the water treatment plant during construction.

Two options have been identified for consideration as follows and as shown:

1) Option A – Gravity water supply.

2) Option B – Pumped water supply.

c. Demolish existing equipment and related appurtenances including, but not limited to: Needle gate; radial gate and hoist; two head gates and operators; flushing gate and operator; bar screen; and log boom.

d. Field measure the gate openings in the dry during a short diversion prior to fabricating the gates.

e. Fabricate and install a permanent bulkhead at the needle gate location.

f. Fabricate a maintenance bulkhead for the radial gate.

g. Provide a replacement radial gate with hoist, two head gates with operators, a flushing gate with operator, a bar screen, and a log boom.

h. Repair structural concrete, and refurbish steel embeds as shown.

01 11 00 - 6 AUGUST 2024

REV. 5/11/2021 YELL 310533

i. Demolish existing railings and vertical supports posts. Replace with new railings and vertical support posts as shown.

2. Demolish and Replace Roof at Backwash Pond Pumphouse includes the following work described herein, but not limited to:

a. Remove and dispose of existing roof from the existing Backwash Pond Pumphouse building. Assume the roof contains asbestos.

b. Provide a new roof on the Backwash Pond Pumphouse building.

3. Existing Water Treatment Plant Building Demolition includes the following work described herein, but not limited to:

a. Demolish and properly dispose of remaining items in the building including, but not limited to, electrical equipment, HVAC equipment, chemical tanks, process equipment, and furniture.

b. Demolish the building structure to 5 feet below grade and properly dispose of material. Fill in all below ground void spaces and cover and compact to match existing grades. Prior to backfilling, make remaining below grade structures capable of sufficiently draining to ground to prevent underground pooling.

c. Assume the roof contains asbestos.

d. Disconnect piping from demolished WTP building walls and plug. Any piping remaining below the 5-foot depth shall be plugged at the face of the walls.

e. Restore all landscape disturbed by demolition including: Preparing topsoil, fine grading, and mulching.

4. Generator Building includes the following work described herein, but not limited to:

a. Construct new generator building as shown.

b. Provide associated underground utilities:

1) Power and communications duct bank between the Treatment Plant Building and the Generator Building.

a) 480V power from panelboard in the Treatment Plant Building’s electrical room to a mini power center in the Generator Building.

b) 480V power from the generator to an automatic transfer switch in the Treatment Plant Building’s electrical room.

c) Control circuits from the automatic transfer switch in the Treatment Plant Building’s electrical room to the generator.

AUGUST 2024 01 11 00 - 7

YELL 310533 REV. 5/11/2021

2) Propane gas line, routed from meter located at the WTP Process Building.

3) Underdrain piping as shown at the Generator Building.

c. Provide a new generator, HVAC equipment, and controls.

d. Provide an automatic bypass-isolation/automatic transfer switch in the treatment plant’s electrical room.

e. Provide a fire detection and alarm system in the generator building.

f. Restore all landscape disturbed by construction and temporary facilities:

Preparing topsoil, fine grading, and mulching.

5. Presedimentation Pond Fence includes the following work described herein, but not limited to:

a. Demolish the existing section of chain link fence around the Presedimentation Pond that is not associated with construction of the soil nail wall. Replace demolished section with new fence.

b. Provide a new steel drill stem wire mesh fence and gates around the Presedimentation Pond.

c. Restore all landscape disturbed by demolition, construction, and temporary facilities: Preparing topsoil, fine grading, and mulching.

6. Additional Spare Equipment includes the following equipment:

a. One 2nd stage rapid mixer motor and gear box (110-MXR-136).

b. One first stage flocculation mixer motor and gear box (110-MXR-101).

c. One third stage flocculation mixer motor and gear box (110-MXR-103).

d. One sodium hypochlorite chemical feed pump (110-PMP-111).

e. One decant pump (120-PMP-101).

f. One sludge waste pump (120-PMP-102).

g. Backwash supply pump motor (110-PMP-124).

1.4 WORK UNDER OTHER CONTRACTS

A. General: Cooperate with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.

Coordinate Work of this Contract with work performed under separate contracts.

1.5 GOVERNMENT FURNISHED MATERIALS

A. Communications Facilities: Interior communications central and station equipment including telephone instruments and switches.

01 11 00 - 8 AUGUST 2024

REV. 5/11/2021 YELL 310533

1.6 MATERIALS AND WORK BY OTHERS

A. Northwestern Energy (NWE):

1. NWE will provide a new primary feeder in a trench to the Water Treatment Plant Site that will run along the access road to the treatment plant site.

2. NWE will provide a new transformer that will serve the new Water Treatment Plant building. NWE will provide the conductors between the transformer secondary terminals and meter enclosure line-side terminals. NWE will provide the Current Transformer (CT).

a. Contractor Coordination: Contractor shall submit product information to Contracting Officer for the CT enclosure and the meter enclosure for review by NWE prior to ordering materials.

1.7 CONTRACTOR USE OF SITES

A. General: Contractor shall have limited use of Site for construction operations. Limit use of premises to work in areas indicated on the Drawings. Do not disturb portions of Project Site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to limits of disturbance.

2. Limit Site disturbance, including earthwork and clearing of vegetation, to limits shown on the Drawings.

B. Storage of Materials: Confine storage of materials to designated staging areas as shown on the Drawings or in coordination with the Contracting Officer.

C. Coordinate with Contracting Officer and Park Staff to minimize disruption of normal Park activities. Inform construction workers and supervisors about the special sensitivity of Park values, regulations, and appropriate housekeeping.

D. Maximize the use of previously disturbed areas for staging and stockpile areas to minimize ground disturbance.

E. Parking: Contractor personnel should not block plant operators’ access to any areas they need to access and should coordinate with operators to determine allowable parking areas. Parking off of road or non-vegetated areas is not allowed unless approved by the Contracting Officer.

AUGUST 2024 01 11 00 - 9

YELL 310533 REV. 5/11/2021

F. Preservation of Natural Features:

1. Prevent damage to natural surroundings as specified in Section 01 12 00, Natural Features Protection. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

a. Trees and other vegetation within fire protection tree removal zones to be removed as specified in Section 31 10 00, Site Clearing.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction. Do not fasten ropes, cables, or guys to existing trees.

4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

G. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment onsite.

H. Construction Camp:

1. Establishment of housing camps will be permitted at the Grant Contractor Court near Grant Village and near Old Faithful Village. The Contractor has been assigned 30 trailer sites in 2024 at the Grant Contractor Court. An additional 30 trailer sites will be available in 2025 and 2026 between the Grant Contractor Court and Old Faithful Village. The trailer sites will have electric, water, and sewer hookups. Activation of water and sewer service is dependent on the weather.

a. The Contractor will be responsible for paying rental fees for these sites to the NPS. While 2024 – 2026 rates are not set yet, 2022 rates were $322.30 per month or $148.74 per two-week period. Rates would be expected to be slightly higher in future years but comparable. The Contractor would also be responsible for paying for the electricity for these sites

b. Adhere to Park rules, animal deterrent policies, cleanliness policies, and return Site to previous condition at completion of work. These requirements also apply to all Contractors’ employees who may, with prior approval, establish their own camping facilities. The use of campgrounds or other in-park commercial lodging is prohibited.

I. Roads: The Contractor shall be responsible for ensuring the vehicles they and their subcontractors drive to and from the Job Site do not cause damage to the roads. The

01 11 00 - 10 AUGUST 2024

REV. 5/11/2021 YELL 310533

access road to the treatment plant site is unpaved. The Contractor shall be responsible for repairing any road damage that occurs because of these vehicles. Following substantial completion, Contractor shall reblade the access road from the highway to the plant site.

J. Hauling Restrictions: Comply with legal load restrictions in hauling of materials.

Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment. Contractor shall obtain current rules and regulations for vehicular traffic on park roads from the Park’s Visitor Services Office, which can be reached at (307) 344-2107. Overweight vehicles generally need to be discussed with the Visitor Services Office and the Federal Highways Administration (FHWA).

FHWA will evaluate capacities of bridges in the Park and inform Contractor if there is an acceptable path for the Contractor to take through the Park and if there are any specific requirements they have to follow.

1. Contractor is required to submit a travel control plan and haul route for oversize or overweight vehicles to the Visitor Services Office and Contracting Officer for approval.

K. Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined.

L.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .