This document is Amendment No. 9 to the solicitation for the YELL 310533 Rehabilitate and Improve Old Faithful Water Treatment System project. The purpose of this amendment is to provide:
- The final Questions and Answers.
- An updated Fiber Optic Communication System specification.
- Updates to the 40 90 00 SUPPLEMENT - 6 for instrumentation details.
- Additional information in response to a question about contractor RV camps.
The proposal due date remains December 18, 2024 at 2:00 p.m. Mountain Time. The amendment also includes several supplemental documents related to fiber optic cable testing procedures and requirements.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2024R0050 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
11/19/20240009
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/27/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
YELL 310533 - Rehabilitate and Improve Old Faithful Water Treatment System
The purpose of this amendment is to provide the following:
1. To provide the final Questions and Answers.
2. To provide updated Fiber Optic Communication System specification
3. To provide updates to 40 90 00 SUPPLEMENT - 6
4. To provide additional instrument details
5. To provide additional information in response to 65 on contractor RV camps
The proposal due date remains 2:00 p.m. Mountain Time, December 18, 2024. The question due
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Vicki Freese-supler
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2024R0050/0009 date remains unchanged at November 18, 2024.
All other terms and conditions of the solicitation remain unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
PW\JA\NPS\D3167656\4\42 TABLE OF CONTENTS
AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024 00 01 10 - 1
YELL 310533 AMENDMENT NO. 9
TABLE OF CONTENTS
Person Section Responsible Title Pages
SPECIFICATIONS
DIVISION 01—GENERAL REQUIREMENTS
01 11 00 KS Summary of Work ....................................................................... 1- 18 01 12 00 KS Natural Features Protection ......................................................... 1- 4 01 26 01 KS Contract Modification Procedures .............................................. 1- 6 01 27 00 KS Definition of Contract Line Items ............................................... 1- 5 01 31 00 KS Project Management and Coordination ...................................... 1- 18 01 32 16 KS Construction Schedule ................................................................ 1- 12 01 32 33 KS Photo Documentation.................................................................. 1- 3 01 33 23 KS Submittal Procedures .................................................................. 1- 9 Supplement:
KS Submittal List .............................................................................. 1- 26 01 35 23 KS Safety Requirements ................................................................... 1- 6 01 40 00 KS Quality Requirements ................................................................. 1- 8 01 42 00 KS Reference Standards.................................................................... 1- 14 01 45 33 LAS Special Inspection, Observation, and Testing ............................. 1- 6 Supplement:
LAS Contractor’s Statement of Responsibility ................................... 1- 2 01 50 00 KS Temporary Facilities and Controls .............................................. 1- 16 01 57 19.11 KS Indoor Air Quality Management ................................................. 1- 7 01 57 19.12 KS Noise and Acoustics Management .............................................. 1- 3 01 57 23 KS Temporary Storm Water Pollution Prevention ........................... 1- 9 01 67 00 KS Product Requirements ................................................................. 1- 10 Supplements:
KS Affirmative Procurement Reporting Form .................................. 1- 2 KS Manufacturer’s Certificate of Proper Installation ....................... 1- 1 KS Manufacturer’s Certificate of Compliance ................................. 1- 1 01 73 29 KS Cutting and Patching ................................................................... 1- 4 01 73 40 KS Execution .................................................................................... 1- 8 01 74 19 KS Construction Waste Management and Disposal ......................... 1- 9 Supplement:
KS Project Waste Management Plan Worksheet Sample ................. 1- 2 01 77 00 KS Closeout Procedures.................................................................... 1- 5 01 78 23 KS Operation and Maintenance Data ................................................ 1- 9 Supplements:
KS Equipment Data Sheet................................................................. 1- 1 KS Closeout and Operation & Maintenance (O&M) Requirements Template ........................................................... 1- 1
Person Section Responsible Title Pages
TABLE OF CONTENTS PW\JA\NPS\D3167656\4\42
00 01 10 - 2 AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024
AMENDMENT NO. 9 YELL 310533
01 79 00 KS Demonstration and Training ....................................................... 1- 3 01 81 13 KS Sustainable Design Requirements............................................... 1- 4 01 88 15 LAS Anchorage and Bracing ............................................................... 1- 6 01 91 14 KS Total Building Commissioning ................................................... 1- 13 01 91 15 KS Process Equipment Testing and Facility Startup ........................ 1- 10 Supplements:
KS Unit Process Startup Form .......................................................... 1- 1 KS Facility Performance/Demonstration Certification Form ........... 1- 1
DIVISION 02—EXISTING CONDITIONS
02 41 00 KS Demolition .................................................................................. 1- 11 02 81 00 KS Transportation and Disposal of Hazardous Materials ................. 1- 11 Supplement:
KS Attachment A: Sample Offsite Policy Certification Memo ........ 1- 1 02 82 00 KS Asbestos Remediation ................................................................. 1- 31 02 83 00 KS Lead Remediation ....................................................................... 1- 18 02 84 16 KS Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury ............................................................................. 1- 7 02 84 33 KS Removal and Disposal of Polychlorinated Biphenyls (PCBs) ..................................................................................... 1- 11
DIVISION 03—CONCRETE
03 01 32 LAS Repair of Vertical and Overhead Concrete Surfaces .................. 1- 12 03 01 33 LAS Repair of Horizontal Concrete Surfaces ..................................... 1- 12 03 10 00 LAS Concrete Forming and Accessories ............................................ 1- 6 03 15 00 LAS Concrete Joints and Accessories ................................................. 1- 7 03 21 00 LAS Steel Reinforcement .................................................................... 1- 5 03 30 00 LAS Cast-in-Place Concrete................................................................ 1- 27 Supplements:
LAS Concrete Mix Design, Class 4500F2S1W1C1............................ 1- 2 LAS Concrete Mix Design, Class GM3500F1S1W1C1 ..................... 1- 1 LAS Concrete Mix Design, Class 3500F1S1W1C1............................ 1- 2 03 39 00 LAS Concrete Curing .......................................................................... 1- 5 03 62 00 LAS Grouting ...................................................................................... 1- 10 Supplement:
LAS 24-hour Evaluation of Nonshrink Grout Test Form and Grout Testing Procedures .................................................. 1- 3 03 63 00 LAS Concrete Doweling ..................................................................... 1- 4 03 64 23 LAS Epoxy Resin Injection Grouting ................................................. 1- 11 03 64 24 LAS Polyurethane Injection Grouting ................................................. 1- 9
AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024 00 01 10 - 3
YELL 310533 AMENDMENT NO. 9
DIVISION 04—MASONRY
04 21 13.13 GBK Masonry Veneer .......................................................................... 1- 12 04 22 00 LAS Concrete Unit Masonry ............................................................... 1- 14
DIVISION 05—METALS
05 05 19 LAS Post-Installed Anchors ................................................................ 1- 9 05 05 23 LAS Welding ....................................................................................... 1- 6 Supplement:
LAS Welding and Nondestructive Testing Table ............................... 1- 1 05 12 00 LAS Structural Steel Framing ............................................................. 1- 13 05 31 00 LAS Steel Decking .............................................................................. 1- 6 05 41 00 LAS Structural Metal Stud Framing .................................................... 1- 7 05 50 00 LAS AMD2/Metal Fabrications .......................................................... 1-1718 05 52 16 LAS Aluminum Railings ..................................................................... 1- 8 05 53 00 LAS Metal Gratings ............................................................................ 1- 6
DIVISION 06—WOOD, PLASTICS, AND COMPOSITES
06 10 00 GBK Rough Carpentry ......................................................................... 1- 8 06 41 00 GBK Architectural Wood Casework .................................................... 1- 10 06 82 00 LAS Glass-Fiber-Reinforced Plastic ................................................... 1- 7
DIVISION 07—THERMAL AND MOISTURE PROTECTION
07 14 00 GBK Fluid-Applied Waterproofing ..................................................... 1- 5 07 15 00 GBK Air and Water Barriers ................................................................ 1- 12 07 19 00 GBK Water Repellents ......................................................................... 1- 4 07 21 00 GBK Thermal Insulation ...................................................................... 1- 6 07 26 16 GBK Belowgrade Vapor Retarders ...................................................... 1- 3 07 41 13 GBK Metal Roof, Wall, and Soffit Panels ........................................... 1- 20 07 62 00 GBK Sheet Metal Flashing and Trim ................................................... 1- 7 07 70 01 GBK Roof Specialties and Accessories ............................................... 1- 4 07 84 00 GBK Firestopping ................................................................................ 1- 6 07 92 00 GBK Joint Sealants .............................................................................. 1- 9
DIVISION 08—OPENINGS
08 11 00 GBK Metal Doors and Frames ............................................................. 1- 5 08 30 00 GBK Specialty Doors ........................................................................... 1- 6 08 41 13 GBK Aluminum-Framed Windows ..................................................... 1- 8 08 45 00 GBK Translucent Wall Assemblies ..................................................... 1- 9 08 71 00 GBK Door Hardware ............................................................................ 1- 15
00 01 10 - 4 AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024
AMENDMENT NO. 9 YELL 310533
08 80 00 GBK Glazing ........................................................................................ 1- 12 08 90 00 GBK Louvers ....................................................................................... 1- 4
DIVISION 09—FINISHES
09 22 16 GBK Nonstructural Metal Framing ...................................................... 1- 4 09 29 00 GBK Gypsum Board ............................................................................ 1- 14 09 30 00 GBK Tiling ........................................................................................... 1- 10 09 51 13 GBK Acoustical Panel Ceilings ........................................................... 1- 5 09 65 00 GBK Resilient Flooring........................................................................ 1- 9 09 90 00 KS Painting and Coating ................................................................... 1- 28 Supplements:
KS Paint System Data Sheet (PSDS) ................................................ 1- 1 KS Paint Product Data Sheet (PPDS) ............................................... 1- 1 KS Volatile Organic Compound (VOC) Limit List .......................... 1- 2 09 96 35 KS Chemical-Resistant Coatings ...................................................... 1- 6 Supplements:
KS Corrosion Control Assistance Form............................................ 1- 1 KS Volatile Organic Compound (VOC) Limit List .......................... 1- 1
DIVISION 10—SPECIALTIES
10 14 00 GBK Signage ........................................................................................ 1- 8 Supplement:
GBK Sign Schedule.............................................................................. 1- 6 10 28 00 GBK Toilet and Bath Accessories........................................................ 1- 8 10 44 00 GBK Fire Protection Specialties and Safety Equipment ...................... 1- 4 10 51 00 GBK Lockers and Benches .................................................................. 1- 4 10 80 00 GBK Miscellaneous Specialties ........................................................... 1- 4
DIVISION 11—EQUIPMENT
11 31 00 GBK Appliances................................................................................... 1- 2 11 53 00 GBK Laboratory Equipment ................................................................ 1- 9
DIVISION 12—FURNISHINGS
12 35 53 GBK Laboratory Casework .................................................................. 1- 18 12 49 00 GBK Roller Shades .............................................................................. 1- 6 12 50 00 GBK Furniture ...................................................................................... 1- 3 Supplement:
GBK Furniture Data Sheets .................................................................. 1- 8
AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024 00 01 10 - 5
YELL 310533 AMENDMENT NO. 9
DIVISION 13—SPECIAL CONSTRUCTION
13 34 19 LAS Metal Building Systems .............................................................. 1- 12
DIVISION 14 THROUGH DIVISION 21 (NOT USED)
DIVISION 22—PLUMBING
22 05 48 SH Vibration Isolation and Seismic Control for Plumbing and Equipment ......................................................... 1- 13 22 07 00 SH Plumbing Piping Insulation......................................................... 1- 7 22 10 01 SH Plumbing Piping and Accessories ............................................... 1- 29 22 10 01.02 SH Polyvinyl Chloride Drain Waste and Vent (PVC-DWV) Pipe and Fittings Data Sheet .................................................... 1- 1 22 10 01.10 SH Carbon Steel Tubing and Fittings Data Sheet ............................. 1- 1 22 10 01.13 SH High-Density Polyethylene (HDPE) Pipe and Fittings— Propane and Liquefied Petroleum Gas (LPG) Service Data Sheet ................................................................................ 1- 2 22 30 00 SH Plumbing Equipment .................................................................. 1- 10 Supplements:
SH Gas Water Heater (Commercial) Data Sheet .............................. 1- 1 SH Domestic Water Expansion Tank Data Sheet ............................. 1- 1 SH Domestic Hot Water Circulating Pump Data Sheet
– Performance Characteristics ................................................. 1- 1 SH Hydropneumatic Tank Data Sheet .............................................. 1- 1 SH Simplex, Submersible Sump Pump Data Sheet
– Performance Characteristics ................................................. 1- 1 SH Duplex, Submersible Sump Pump Data Sheet
– Performance Characteristics ................................................. 1- 1 SH Backflow Preventer Data Sheet .................................................. 1- 1 22 40 00 SH Plumbing Fixtures ....................................................................... 1- 11
DIVISION 23—HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 48 SH Vibration Isolation and Seismic Control for HVAC Piping and Equipment ......................................................................... 1- 13 23 05 93 SH Testing, Adjusting, and Balancing for HVAC ............................ 1- 6 23 07 00 SH HVAC Insulation ........................................................................ 1- 11 23 09 00 SH Instrumentation and Control Devices for HVAC ....................... 1- 15 23 09 13 SH HVAC Controls, Field Components, and Instruments ............... 1- 11 23 09 23 SH Direct-Digital Control System for HVAC .................................. 1- 18 23 23 00 SH Refrigerant Piping ....................................................................... 1- 8 23 31 13 SH Metal Ducts and Accessories ...................................................... 1- 28
00 01 10 - 6 AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024
AMENDMENT NO. 9 YELL 310533
23 34 00 SH HVAC Fans ................................................................................. 1- 14 23 37 00 SH Air Outlets and Inlets .................................................................. 1- 4 23 81 00 SH Unitary Air-Conditioning Equipment ......................................... 1- 18 23 82 00 SH Terminal Heating and Cooling Units .......................................... 1- 10
DIVISION 24 AND DIVISION 25 (NOT USED)
DIVISION 26—ELECTRICAL
26 05 02 JJ Basic Electrical Requirements .................................................... 1- 9 26 05 04 JJ Basic Electrical Materials and Methods ..................................... 1- 13 26 05 05 JJ Conductors .................................................................................. 1- 10 26 05 26 JJ Grounding and Bonding for Electrical Systems ......................... 1- 6 26 05 33 JJ Raceway and Boxes .................................................................... 1- 29 26 05 70 JJ Electrical Systems Analysis ........................................................ 1- 8 Supplement:
JJ Figure 1: Example Arc Flash Label ............................................ 1- 1 26 08 00 JJ Commissioning of Electrical Systems ........................................ 1- 20 26 09 13 JJ Power Measurement and Control ................................................ 1- 4 26 14 13 JJ Switchboards ............................................................................... 1- 9 26 20 00 JJ Low-Voltage AC Induction Motors ............................................ 1- 9 26 22 00 JJ Low-Voltage Transformers ......................................................... 1- 5 26 24 16 JJ Panelboards ................................................................................. 1- 7 26 24 19 JJ Low-Voltage Motor Control ....................................................... 1- 15 26 27 26 JJ Wiring Devices ........................................................................... 1- 12 26 29 23 JJ Low-Voltage Adjustable Frequency Drive System .................... 1- 9 26 32 13.16 JJ Propane Engine Generator Set .................................................... 1- 14 26 33 53 JJ Static Uninterruptible Power Supply .......................................... 1- 13 26 36 23 JJ Automatic Transfer Switches ...................................................... 1- 6 26 42 01 KS Pipe Bonding and Test Stations .................................................. 1- 16 Supplement:
KS Joint Bond Continuity Test Schematic ....................................... 1- 1 26 42 02 KS Galvanic Anode Cathodic Protection System ............................. 1- 8 26 42 03 KS Under Tank Cathodic Protection System .................................... 1- 7 26 43 00 JJ Surge Protective Devices ............................................................ 1- 6 26 50 00 JJ Lighting ....................................................................................... 1- 11
DIVISION 27—COMMUNICATIONS
27 13 13 JJ Communications Copper Cabling Systems ................................... 1- 14
AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024 00 01 10 - 7
YELL 310533 AMENDMENT NO. 9
DIVISION 28—ELECTRONIC SAFETY AND SECURITY
28 31 00 JJ Fire Detection and Alarm............................................................... 1- 25 Supplement:
JJ Sequence of Operations Matrix ..................................................... 1- 1
DIVISION 29 AND DIVISION 30 (NOT USED)
DIVISION 31—EARTHWORK
31 10 00 JDM Site Clearing................................................................................ 1- 8 31 23 13 KS Subgrade Preparation .................................................................. 1- 3 31 23 16 KS Excavation................................................................................... 1- 5 31 23 19.01 KS Dewatering .................................................................................. 1- 4 31 23 23 KS Fill and Backfill .......................................................................... 1- 11 31 23 23.15 KS Trench Backfill ........................................................................... 1- 12 31 32 19.16 KS Geotextile .................................................................................... 1- 9 31 37 00 KS Riprap .......................................................................................... 1- 4 31 41 00 KS Shoring ........................................................................................ 1- 2 31 50 00 KS Excavation Support and Protection ............................................. 1- 12
DIVISION 32—EXTERIOR IMPROVEMENTS
32 11 23 KS Aggregate Base and Subbase Courses ........................................ 1- 7 32 31 26 KS Woven Wire Fences and Gates ................................................... 1- 9 32 91 19.13 JDM Topsoil Placement and Grading .................................................. 1- 5 32 92 00 JDM Turf and Grasses ......................................................................... 1- 4
DIVISION 33—UTILITIES
33 05 01.02 KS Ductile Iron Pipe and Fittings ..................................................... 1- 12 33 05 01.09 KS Polyvinyl Chloride (PVC) Pressure Pipe and Fittings ................ 1- 6 33 05 13 KS Manholes ..................................................................................... 1- 13 33 05 16.13 KS Precast Concrete Utility Structure .............................................. 1- 6 33 12 16 KS Water Utility Distribution Valves ............................................... 1- 6 33 12 19 KS Water Utility Distribution Fire Hydrants .................................... 1- 4 33 13 00 KS Disinfection of Water Utility Distribution Facilities .................. 1- 6 33 41 01 KS Storm Drain, Sanitary Sewer, and Drainage Piping ................... 1- 5 33 41 01.01 KS Corrugated Metal Data Sheet ...................................................... 1- 1 33 41 01.03 KS Polyvinyl Chloride (PVC) Data Sheet ........................................ 1- 2 33 41 01.05 KS Reinforced Concrete Data Sheet ................................................. 1- 3 33 41 01.08 KS Corrugated Polyethylene (CPE) Data Sheet ............................... 1- 1 33 44 13.13 KS Catch Basins................................................................................ 1- 4 33 46 00 KS Subsurface Drainage ................................................................... 1- 9
00 01 10 - 8 AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024
AMENDMENT NO. 9 YELL 310533
DIVISION 34 (NOT USED)
DIVISION 35—WATERWAY AND MARINE CONSTRUCTION
35 20 16.24 KS Full-Aperture Sealing Slide Gates .............................................. 1- 12 35 20 16.27 KS Radial Gate.................................................................................. 1- 9
DIVISION 36 THROUGH DIVISION 39 (NOT USED)
DIVISION 40—PROCESS INTERCONNECTIONS
40 05 15 KS Piping Support Systems .............................................................. 1- 14 Supplements:
KS Table 1: Nonchemical Areas ....................................................... 1- 1 KS Table 2: Chemical Areas ............................................................. 1- 1 40 05 33 KS Pipe Heat Tracing ....................................................................... 1- 6 40 27 00 KS Process Piping—General ............................................................ 1- 21 40 27 00.01 KS Cement-Mortar and Ceramic-Epoxy-Lined Ductile Iron Pipe and Fittings Data Sheet ............................................ 1- 5 40 27 00.03 KS Carbon Steel Pipe and Fittings—General Service Data Sheet ................................................................................ 1- 6 40 27 00.08 KS Stainless Steel Pipe and Fittings—General Service Data Sheet ................................................................................ 1- 4 40 27 00.10 KS Polyvinyl Chloride (PVC) Pipe and Fittings Data Sheet ............ 1- 3 40 27 00.13 KS Copper and Copper Alloy Pipe, Tubing, and Fittings Data Sheet ................................................................................ 1- 2 40 27 00.15 KS Double Wall Containment Piping Data Sheet ............................ 1- 3 40 27 01 KS Process Piping Specialties........................................................... 1- 15 40 27 02 KS Process Valves and Operators ..................................................... 1- 29 40 42 13 KS Process Piping Insulation ............................................................ 1- 7 Supplement:
KS Service and Insulation Thickness Table ..................................... 1- 1 40 80 01 KS Process Piping Leakage Testing ................................................. 1- 5 40 90 00 JJ Instrumentation and Control for Process Systems ...................... 1- 40 Supplements:
JJ Control Descriptions ................................................................... 1- 14 JJ Control Panel Schedule ............................................................... 1- 1 JJ Instrument List ............................................................................ 1- 6 JJ PLC Input/Output List ................................................................ 1- 7 JJ Preparation for Testing and Functional Test Forms ................... 1- 3 JJ Performance Test Sheet .............................................................. 1- 1
AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024 00 01 10 - 9
YELL 310533 AMENDMENT NO. 9
40 91 00 JJ Instrumentation and Control Components .................................. 1- 54 40 95 80 AMD9/Fiber Optic Communication System .............................. 1- 20 Supplements:
AMD9/On-Reel Fiber Optic Cable Test Summary Form ........... 1- 1 AMD9/Fiber Optic Attenuation Performance Test Form ........... 1- 1 AMD9/Post-Installation Fiber Optic Cable Test Summary Form ........................................................................ 1- 2 40 96 00 JJ Applications Software ................................................................. 1- 21 40 99 90 JJ Package Control Systems ............................................................ 1- 48
DIVISION 41—MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 13 13.29 KS Manual Bag System with Mix Tank ........................................... 1- 10 41 22 23.19 KS Monorail Hoists and Portable Davit Crane ................................. 1- 9 Supplements:
KS Sodium Bicarbonate Monorail Data Sheet ................................. 1- 1 KS Sodium Bicarbonate Monorail Dimension Sheet ....................... 1- 1 KS Sodium Bicarbonate Trolley Motor Data Sheet .......................... 1- 1 KS Vertical Turbine Pumps Monorails Data Sheet .......................... 1- 1 KS Vertical Turbine Pumps Monorails Dimension Sheet ................ 1- 1
DIVISION 42 (NOT USED)
DIVISION 43—PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND
STORAGE EQUIPMENT
43 40 01 KS Polyethylene Storage Tank ......................................................... 1- 11 Supplements:
KS Sodium Hypochlorite Tank 1 Fitting/Opening Schedule............ 1- 1 KS Sodium Hypochlorite Tank 2 Fitting/Opening Schedule............ 1- 1 KS Sodium Hydroxide Tank 1 Fitting/Opening Schedule ................ 1- 1 KS Sodium Hydroxide Tank 2 Fitting/Opening Schedule ................ 1- 1 KS Coagulant Tank 1 Fitting/Opening Schedule .............................. 1- 1 KS Coagulant Tank 2 Fitting/Opening Schedule .............................. 1- 1 KS Filter Aid Polymer Solution Tank 1 Fitting/Opening Schedule ................................................................................... 1- 1 KS Filter Aid Polymer Solution Tank 2 Fitting/Opening Schedule ................................................................................... 1- 1
00 01 10 - 10 AUGUST 2024SEPTEMBER 27, 2024NOVEMBER 2024
AMENDMENT NO. 9 YELL 310533
DIVISION 44—POLLUTION AND WASTE CONTROL EQUIPMENT
44 42 56.03 KS Vertical Turbine Pumps .............................................................. 1- 9 Supplements:
KS Backwash Supply Pumps 1 and 2 Data Sheet ............................. 1- 3 KS House Water Pumps 1 and 2 Data Sheet .................................... 1- 3 44 42 56.10 KS Screw-Induced Flow Centrifugal Pumps .................................... 1- 7 Supplement:
KS Decant Pump Data Sheet ............................................................ 1- 2 44 42 56.14 KS Lobe Pumps ................................................................................ 1- 9 Supplement:
KS Sludge Pump Data Sheet ............................................................. 1- 2 44 43 30 KS Packaged Polymer and Dewatering System ............................... 1- 11 44 44 13.01 KS Chemical Feed Systems .............................................................. 1- 19 Supplement:
KS Chemical Feed System Schedule ................................................ 1- 2 44 44 59 KS Package Water Treatment System .............................................. 1- 48 Supplement:
KS Package Water Treatment System Process Control Descriptions ................................................................ 1- 6 44 44 63.01 KS Polymer Feed System, Liquid ..................................................... 1- 10
DIVISION 45 THROUGH DIVISION 49 (NOT USED)
DRAWINGS
END OF SECTION
PW\JA\NPS\D3167656\4\42 FIBER OPTIC
NOVEMBER 2024 COMMUNICATION SYSTEM
YELL 310533 40 95 80 - 1
AMENDMENT NO. 9
SECTION 40 95 80
FIBER OPTIC COMMUNICATION SYSTEM
PART 1 GENERAL
1.01 SCOPE OF WORK
A. See the following network diagrams for more details:
1. 459N101 through 459N107 Communication Network Diagrams.
B. Route 24-strand (12 pair) Single-Mode Fiber Optic cables between the following facilities:
1. Facility 465 NIP to Facility 460 Headworks (459N101).
2. Facility 465 NIP to Facility 475 Bioreactor and Digesters (459N104).
3. Facility 465 Process to Facility 480 Dewatering (459N105).
1.02 REFERENCES
A. The following is a list of standards that may be referenced in this section:
1. Electronic Components, Assemblies, and Materials Association (ECA):
310-E, Cabinets, Racks, Panels, and Associated Equipment.
2. Institute of Electrical and Electronic Engineers, Inc. (IEEE): 802.3, Telecommunications and Information Exchange Between Systems— Local and Metropolitan Networks.
3. Insulated Cable Engineers Association (ICEA):
a. S-83-596, Optical Fiber Premises Distribution Cable.
b. S-87-640, Optical Fiber Outside Plant Communications Cable.
c. S-104-696, Indoor-Outdoor Optical Fiber Cable.
4. International Organization for Standardization (ISO): 9001, Quality Management Systems—Requirements.
5. National Fire Protection Association (NFPA): 70, National Electrical Code (NEC).
6. QuEST Forum (QF): TL 9000, Quality Management Systems.
7. Telecommunications Industry Association (TIA):
a. 526-7, OFSTP-7 Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant.
b. 526-14, OFSTP-14 Optical Power Loss Measurements of Installed Multimode Fiber Cable Plant.
c. 568-C.1, Commercial Building Telecommunications Cabling Standards.
d. 568-C.3, Optical Fiber Cabling Components Standard.
FIBER OPTIC PW\JA\NPS\D3167656\4\42
COMMUNICATION SYSTEM NOVEMBER 2024
40 95 80 - 2 YELL 310533
AMENDMENT NO. 9
e. 598, Optical Fiber Cable Color Coding.
f. 606, Administration Standard for Commercial
Telecommunications Infrastructure.
8. Telecommunications Industry Association/Electronics Industry
Association (TIA/EIA):
a. 455-78, FOTP-78 - IEC 60793-1-40 Optical Fibres Part 1-40:
Measurement Methods and Text Procedures – Attenuation.
b. 455-133, FOTP-133 IEC-60793-1-22 Optical Fibres Part 1-22:
Measurement Methods and Test Procedures Length Measurement.
c. 492AAAA, Detail Specification for 62.5-Micrometer Core
Diameter/125-Micrometer Cladding Diameter Class Ia Graded- Index Multimode Optical Fibers.
d. 492AAAB, Detail Specification for 50-Micrometer Core Diameter/125-Micrometer Cladding Diameter Class Ia Graded- Index Multimode Optical Fibers.
e. 492AAAC, Detail Specification for 850-nm Laser-Optimized, 50-um Core Diameter/125-um Cladding Diameter Class Ia Graded-Index Multimode Optical Fibers.
f. 492CAAA, Detail Specification for Class IVa Dispersion- Unshifted Single-Mode Optical Fibers.
g. 492CAAB, Detail Specification for Class IVa Dispersion- Unshifted Single-Mode Optical Fibers with Low Water Peak.
h. 604-2, FOCIS-2 Fiber Optic Connector Intermateability Standard, Type ST.
i. 604-3, FOCIS-3 Fiber Optic Connector Intermateability Standard, Type SC and SC-APC.
j. 604-12, FOCIS-12 Fiber Optic Connector Intermateability Standard, Type MT-RJ.
k. 942, Telecommunications Infrastructure Standard for Data Centers.
l. TSB-140, Additional Guidelines for Field-Testing Length, Loss and Polarity of Optical Fiber Cabling Systems-Contains Color.
9. UL: 94, Tests for Flammability of Plastic Materials for Parts in Devices and Appliances.
1.03 DEFINITIONS
A. ATM: Asynchronous Transfer Mode.
B. AUI: Attachment Unit Interface.
C. dB: Decibel.
D. DNI: Desktop Network Interface.
YELL 310533 40 95 80 - 3
AMENDMENT NO. 9
E. EMB: Effective Modal Bandwidth.
F. ETL: Electrical Test Laboratories.
G. FDDI: Fiber Distributed Data Interface.
H. FIM: Facilities Information Management.
I. Flux Budget: Difference between transmitter output power and receiver input power required for signal discrimination when both are expressed in dBm.
J. FOCS: Fiber Optic Communication System.
K. FOIRL: Fiber Optic Inter Repeater Link.
L. Fusion Splice: Connecting ends of two fibers together by aligning fiber ends and applying electric arc to fuse ends together.
M. Hybrid Cable: Cable containing more than one type of fiber.
N. LAN: Local Area Network.
O. LIMS: Laboratory Information Management System.
P. m: Micrometer.
Q. Mbps: Megabits per Second.
R. Mechanical Splice: Connecting ends of two fibers together by means other than fusion.
S. Megahertz (MHz): One million cycles per second.
T. MHz: Megahertz.
U. micro: x 10-6.
V. Micron: Micrometer or one millionth meter.
W. MIS: Management Information System.
X. n, nano: x 10-9.
Y. N: Newton.
Z. nm: Nanometer—unit of measure equal to one billionth meter.
AA. OFL: Over-filled Launch.
40 95 80 - 4 YELL 310533
AMENDMENT NO. 9
BB. OFN: Nonconductive Optical Fiber Cable.
CC. OFNP: Nonconductive Optical Fiber Plenum Cable.
DD. OFNR: Nonconductive Optical Fiber Riser Cable.
EE. OLTS: Optical Loss Test Sets.
FF. OTDR: Optical Time Domain Reflectometer.
GG. OVD: Outside Vapor Deposit.
HH. PIC: Process Instrumentation and Control.
II. Plenum: Air return path of central air handling system, such as open space above suspended ceiling.
JJ. RLM: Restricted Mode Launch.
KK. ROL: Reverse Oscillation Lay.
LL. SPC: Super Physical Contact.
MM. UPC: Ultra Physical Contact.
NN. UPS: Uninterruptible Power Supply.
OO. V ac: Volts Alternating Current.
PP. WAN: Wide Area Network.
1.04 SYSTEM DESCRIPTION
A. Function of FOCS is to transmit digital data between network nodes.
Requirements listed identify minimum acceptable system performance.
B. Provide a FOCS based on referenced standards for use in the following local and wide area networks:
1. Ethernet.
C. Network(s) will be used by PIC to distribute data and coordinate Contracting Officer’s operations.
YELL 310533 40 95 80 - 5
AMENDMENT NO. 9
1.05 SUBMITTALS
A. Action Submittals:
1. Cable Schedule Showing:
a. Cable identification.
b. Fiber counts for each cable and identification of used fiber pairs.
c. Cable length.
2. Component Data:
a. Manufacturer and model number.
b. General data and description.
c. Specifications and data sheet.
d. Scaled drawings and mounting arrangements.
3. Proposed testing and acceptance plan including sequence and expected duration of each test. Include procedures for investigation and resolution of failed cable tests.
4. Proposed testing schedule.
5. Proposed on-reel testing procedures.
6. Fiber optic cable attenuation loss budget calculations with two connector pairs and no splices, based on TIA 568-C.3, Annex H.
7. Fiber Optic Test Reports:
a. Site on-reel test summary and individual cable test reports.
Include a copy of the manufacturer’s pre-shipment test results.
b. Post-installation fiber optic cable test summary.
c. Post-installation fiber optic cable attenuation and OTDR test.
B. Informational Submittals:
1. Manufacturer’s statement that installer is certified to perform installation Work.
2. Subcontractor Qualifications:
a. FOCS Subcontractor: Minimum of 5 years’ experience providing, integrating, installing, and commissioning of similar systems.
1) Statement of Experience:
a) List of at least three fiber optic data communications systems comparable to system specified which have been furnished and placed into operation. For each system, provide following information:
(1) Client’s name, address, telephone number, and name of current operations supervisor or other contact.
(2) Description of system hardware configuration, including major equipment items, number of nodes, and communication standards implemented.
40 95 80 - 6 YELL 310533
AMENDMENT NO. 9
(3) System block diagram.
(4) Dates when contract was signed, equipment was delivered, and system was accepted by Client.
Also, include originally scheduled completion date and if different from actual date, explain why.
(5) Approximate value of listed FOCS provided in dollars.
(6) Detailed horizontal and riser routing.
(7) Distribution frame arrangements.
(8) Fiber and termination identification, including spares.
b. FOCS Subcontractor’s Site Representative: Minimum of 5 years’ experience installing similar systems.
c. Qualification of Personnel:
1) Resumes identifying management and technical qualifications of supervisory, local service representative, and key personnel.
2) Qualification data of firm and persons to demonstrate capabilities and experience in the following areas:
a) Fiber optic cable handling and placement techniques.
b) Fiber optic splicing and installation of connections.
c) Attenuation testing procedures.
d. Client’s acceptance of FOCS Subcontractor does not exempt FOCS Subcontractor or Contractor from meeting Contract Document requirements nor does it give prior acceptance of subsystems, equipment, materials, or services.
e. Sample of Network Test Report, minimum 10 pages, that Contractor generated in a previous project.
f. Testing and acceptance plan, 30 days prior to beginning of testing.
g. Fiber test results. Documentation covering fiber facility testing, not later than 2 days after testing, showing:
1) Manufacturer’s tag of attenuation per fiber as recorded from
OTDR reading before shipment.
2) Attenuation of each fiber upon delivery to Site.
3) Attenuation of each fiber plus connector after installation as recorded from OTDR with tracing.
4) Flux Budget calculations with comparison to measured attenuation for each run verifying adequate optical signal strength.
h. For each maintenance organization, identify location of base of service and how required coverage will be achieved.
YELL 310533 40 95 80 - 7
AMENDMENT NO. 9
3. Manufacturer’s Certificate of Compliance.
4. Manufacturer’s suggested installation practice.
5. Operation and Maintenance Data: As specified in Section 01 78 23, Operation and Maintenance Data.
1.06 ENVIRONMENTAL REQUIREMENTS
A. Optical Fiber Cable and Cable Splice Centers:
1. Outside, Underground/Submerged: Minus 20 degrees C to 40 degrees C.
2. Outside, Aboveground in Conduit: Minus 40 degrees C to 80 degrees C.
3. Inside: 0 degree C to 40 degrees C.
B. Equipment:
1. Outside, Aboveground: Minus 40 degrees C to 80 degrees C.
2. Control Rooms, Equipment Rooms, and Telecommunications Closets:
30 percent to 55 percent relative humidity, 18 degrees C to 24 degrees C.
3. Other Interior Areas: 0 percent to 100 percent relative humidity, 5 degrees C to 35 degrees C.
1.07 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Cable:
a. ISO 9001 or QF TL 9000 registered, whichever applies to material.
b. Minimum of 20 years in manufacturing optical fiber cable in order to demonstrate reliable field performance.
2. Housing: ISO 9001 and QF TL 9000 registered.
3. Connector:
a. ISO 9001 or QF TL 9000 registered.
b. Minimum 10-year history of manufacturing and supporting connector technology that does not require epoxy or polishing in field.
4. Jumper Cable: ISO 9001 and QF TL 9000 registered.
B. Installer Qualifications:
1. Individuals with at least 3 years of experience with projects utilizing fiber optic cable in compliance with TIA 568-C.3.
2. Certified by fiber cable manufacturer.
40 95 80 - 8 YELL 310533
AMENDMENT NO. 9
C. Tester Qualifications: Individuals with at least 3 years of experience with projects utilizing fiber optic cable in compliance with TIA 568-C.3.
1. Technician:
a. Successfully attended training program, which includes testing with an OLTS and an OTDR and have obtained a certificate as proof thereof. Certificate may have been issued by the following organizations or an equivalent organization:
1) Manufacturer of fiber optic cable and fiber optic connectors.
2) Manufacturer of test equipment used for field certification.
3) Other independent training organizations acceptable to
Contracting Officer.
D. Provide connectors/coupling, splicing enclosures, mounting hardware, and miscellaneous accessories for fibers by same manufacturer.
PART 2 PRODUCTS
2.01 SINGLE MODE FIBER OPTIC CABLE
A. 8.3/125-micron Class IVa dispersion-unshifted optical fibers for use in the backbone distribution subsystem shall meet or exceed requirements of TIA 568-C.3, including the following specifications:
1. Chromatic Dispersion:
a. Zero-Dispersion Wavelength: Between 1,302 nm and 1,322 nm.
b. Maximum value of dispersion slope at zero dispersion wavelength shall be no greater than 0.093 ps per km-nm2.
2. Mode Field Diameter: Nominal 8.7 microns to 10 microns, with a tolerance of plus or minus 0.5 micron at 1,300 nm.
3. Maximum Attenuation:
a. Outside and Indoor-Outdoor Optical Fiber Cable:
1) 0.5 dB per km at 1,310 nm.
2) 0.5 dB per km at 1,550 nm.
4. Cutoff Wavelength of Cabled Fiber: Less than 1,260 nm.
5. TIA 492 CAAB (OS2) low water peak and complies with ITU T G.652
(A to D).
6. Distance Capacity per IEEE 802.3:
a. 1 Gbit Ethernet, 1,300 nm Laser Minimum Distance: 5000 m.
b. 10 Gbit Ethernet: 10 km at 850 nm and 40 km at 1,310 nm.
YELL 310533 40 95 80 - 9
AMENDMENT NO. 9
B. Type 8.3/250, Backbone for Underground Conduit Installation:
1. Individual Fibers: 8.3/125/250 microns.
2. Assembly:
a. Nonmetallic, gel-free, dry water blocked, loose-tube fiber core with dielectric strength member enclosed by nonmetallic cross-ply sheath; requires buffer tubing.
b. Cable: Comply with ICEA S-87-640 and RDUP 7 CFR 1755.902 for backbone, feeder and distribution cables and RDUP 7 CFR 1755.903 for service entrance or drop cable with 12 strands or less used having a distance of 100 m or less (fiber-to-the-home applications).
3. NEC/UL Listing: None; not approved for general use within building, except when installed in metallic conduit.
4. Protective Covering: Black, antifungus, UV-resistant, polyethylene jacket with rip-cord.
5. Minimum Short Term Pull Strength: 600 lbf.
2.02 ETHERNET FIBER-TO-COPPER TRANSCEIVERS
A. Function: Convert half/full-duplex fiber optic ethernet signal to copper ethernet signal and vice versa.
B. Speed: Auto-negotiating 10/100/1000 Mbps.
C. Features:
1. Support fiber optic type specified.
2. Fiber Optic Connectors: LC.
3. Copper Connector: RJ45 unshielded.
4. Power: 24V dc.
5. Mounting: Suitable for permanent mounting.
2.03 FIBER DISTRIBUTION FRAME
A. Function: Provides industry-standard rack mounting system for interface between fiber optic backbone and equipment cables.
40 95 80 - 10 YELL 310533
AMENDMENT NO. 9
B. Features:
1. Used in either cross-connect or interconnect configuration.
2. 23-inch (584-mm) rack for mounting 19-inch (483-mm) rack mount units.
a. Accommodates up to 576 fiber terminations per frame.
b. Accepts connector module housing and splice housing within same rack.
c. Fiber Optic Connectors: LC.
3. Fiber/Wire Management System:
a. Vertical: 75-mm by 100-mm supports on 200-mm centers vertically on four sides (front LHS, back LHS, front RHS, back
RHS).
b. Horizontal: Supports on 100-mm centers horizontally above and below each termination frame front and back. Support may serve frames immediately above and below.
4. Mounting Hardware: Accepts standard 19-inch (483-mm) rack for integrated fiber optic system (for example, hubs, routers, patch panels).
5. Splice Trays with Coil Former: Former to wind slack cable around, provides controlled long radius bends.
a. Doors: Pivot down lockable.
b. Foot and End Caps: Included in final, assembled unit.
c. Ancillaries: Jumper troughs and covers, cable tie brackets.
2.04 PANELS
A. Closet Connector Housing Panel:
1. Manufactured from 16-gauge cold rolled steel or injection-molded polycarbonate for structural integrity.
2. Designed to accommodate applications requiring specified labeling.
3. Offered in 24-fiber versions.
a. LC Duplex Connectors.
4. Capable of being used with field-installable connectors or in applications where preconnectorized cables are routed directly from equipment to interconnect hardware.
2.05 CONNECTORS
A. General:
1. Comply with TIA/EIA 604-2, TIA/EIA 604-3, TIA/EIA 604-12, and
TIA 568-C.3.
2. LC connectors.
3. Pull Strength: 0.2 N minimum.
YELL 310533 40 95 80 - 11
AMENDMENT NO. 9
4. Durability: Sustain minimum 500 mating cycles without violating other requirements.
a. Ferrules: Free-floating low loss ceramic.
b. Polarizing key on duplex connector systems.
5. Attenuation:
a. In accordance with TIA 568-C.3.
b. Maximum of 0.75 dB per connector pair.
2.06 PATCHCORDS
A. General:
1. In accordance with TIA 568-C.3.
2. Function: Connect fiber centers to network nodes, such as computer workstations.
3. Fiber Characteristics: In accordance with requirements for fiber optic cable.
4. Cable Configuration:
a. Individual tight-buffer thermoplastic, fibers single or multimode, to match fibers being jumpered on.
b. Protected with kevlar strength members and enclosed in thermoplastic jacket.
5. Length: Standard, to meet requirements shown, plus minimum 3 meters at workstations.
6. Connectors:
a. As required by Article Connectors.
b. On-axial Pull Strength: 33 N.
c. Normal-to-Axial Pull Strength: 22 N.
7. Cable Rating: OFNR or OFNP.
8. Color: Per standards or as indicated.
9. Measured for insertion loss with the following values for each connector:
a. Typical of 0.3 dB and maximum of 0.5 dB (LC typical of 0.1 dB and maximum of 0.3 dB).
2.07 CONDUIT
A. In accordance with Section 26 05 33, Raceway and Boxes.
2.08 ACCESSORIES
A. Hardware: Provide cable…