This document outlines the scope of electrical repair and construction work required at three national parks in Alaska. Locations requiring work include maintenance shops, visitor centers, weight rooms, headquarters buildings, saunas, hangars, mini-trailers and evidence sheds. Deficiencies include missing or damaged panels, conduits, disconnects, grounding systems and improper wiring. Required repairs involve installing ground bars, disconnects, breakers, conduits, covers and replacing or upgrading panels, feeders and other system components. The related federal contract opportunity is for electrical repair construction services at national parks in Alaska, solicited by the National Park Service Alaska Region under solicitation number 140P9723R0003.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Park

FMSS

Location # Building Name/ Description Location

LACL 38436 PA-4 Interior

LACL 38540 VISITOR CENTER Interior

LACL 38540 VISITOR CENTER interior

LACL 38541 Weight Room Exterior

LACL 38541 Weight Room Interior

LACL 38542 HEADQUARTERS Basement

LACL 38542 HEADQUARTERS Basement

LACL 38542 HEADQUARTERS Basement

LACL 38542 HEADQUARTERS Interior

LACL 38544 MAINTENANCE SHOP Interior

LACL 38544 MAINTENANCE SHOP Interior

LACL 38544 MAINTENANCE SHOP Interior

LACL 38544 MAINTENANCE SHOP Interior

LACL 38546 BATTERY SHED Exterior

LACL 38546 BATTERY SHED Interior

LACL 38547 PA-7 Interior

LACL 38548 VIP Building Exterior

LACL 58011 TANK FARM FUELING FACILITY Exterior

LACL 58011 TANK FARM FUELING FACILITY Exterior

LACL 83260 Birch Hill Interior

LACL 83260 Birch Hill Interior

LACL 83260 Birch Hill Interior

LACL 83261 Birch Hill Interior

LACL 91058 Sauna Exterior

LACL 91058 Sauna Exterior

LACL 91508 SAUNA-MINI Exterior

LACL 92276 HANGAR Exterior

LACL 92276 HANGAR Exterior

LACL 92276 HANGAR Exterior

LACL 238401 Boneyard Interior

LACL 238401 Boneyard Interior

LACL 238401 Boneyard Interior

LACL 247633 Homestead Interior

LACL 247633 Homestead Interior

LACL 247634 Café Interior

LACL 247635 Homestead Shop Interior

LACL 84714 Outside Panel at the Point Exterior

LACL 84714 Outside Panel at the Point Exterior

LACL 250829 EVIDENCE SHED - by the yurt Exterior

LACL 250829 EVIDENCE SHED - by the yurt Interior

Deficiency Description Required Repair

Meterbase is missing a KO. Provide KO.

Panel 'B' has the equipment grounding conductor terminated on the Neutral bus.

Install ground bar in existing panel 'B' and move ground wires off of neutral bar and over, Panel 'B' is fed using #2 AWG copper conductors, rated for 95A, but is protected by a 125A breaker which is too large to protect the conductors.

Replace 125A breaker with a new 100A breaker rated for use in the existing panel.

Weight room building requires a disconnect per NEC 225.31.

Intercept incoming feeders to Panel 'W' and install overcurrent protection device such as a breaker or fused disconnect.

Panel 'W' has its equipment grounding conductor landed on the neutral bus bar, and the incoming feeders are labeled incorrectly.

Neutral wire needs to be moved off the phase lug and onto the neutral bar and the equipment grounding conductor needs to be removed from the neutral bars and on the ground bar.

PVC LB in basement has no cover plate. Provide PVC LB cover plate.

Feeders to Uniform Cache Panel are exposed without protection.

Provide conduit or other approved means of preotection to exposed feeders. .

Panel ‘C’ is of unknown manufacturer type and is missing several knockouts and wire clamps.

Replace Panel 'C' with more readily available panel type and/or provide KO seals and wire clamps as required.

Panel ‘A’ is a Siemens type EQ load center and has several Thomas & Betts type TB breakers.

If work is done on these circuits the breakers will need to be replaced with breakers listed with the Siemens type load center.

Panel 'A' has neutral and ground bonded together

Install dedicated ground bar in panel. Move all ground wires to this dedicated bus bar.

Panel 'B' has neutral and ground bonded together

Install dedicated ground bar in panel. Move all ground wires to this dedicated bus bar.

Panel 'C' has neutral and ground bonded together

Install dedicated ground bar in panel. Move all ground wires to this dedicated bus bar.

Panel 'D' has neutral and ground bonded together

Install dedicated ground bar in panel. Move all ground wires to this dedicated bus bar.

Panel 'M' has neutral and ground bonded together

Install dedicated ground bar in panel. Move all ground wires to this dedicated bus bar.

Panel 'C' Is a Thomas & Betts type TBL

Panel which is no longer manufactured and breakers installed are not listed for use in this panel.

If any upgrades are required, the entire panel will need to be replaced.

Battery Shed has no grounding electrode or disconnect.

Install 60A disconnect in place of feeder LB on the exterior of the building.

Panel 'BA' has no grounding bus bar.

Install ground bar in existing panel 'BA' and move ground wires off of neutral bar and over, In Panel 'A' ground and neutral wires terminated on Neutral bar. No ground bar installed.

Provide dedicated ground bar in panel and move ground wires from neutral to ground bar.

Panel ‘V’ is missing several KOs and a deadfront.

Replace with a new panel with the ratings and model information available.

Electrical distribution system equipment backboard was hit by a vehicle. The supports and electrical installations were damaged.

While the wiring is still intact, the support system and all raceway systems need to be replaced.

Panel 'F' has no grounding bus bar.

Since the panel is no longer manufactured and supports are damaged, replace panel with similar Siemens or Square D product.

Panel ‘A’ EGCs need to be moved to the existing ground bar. Panel ‘A’ is no longer manufactured. Conductors are not color identified by phase or are mis-labeled.

Move panel ‘A’ EGCs to the existing ground bar. Relabel the feeders with A-phase as black, and B-phase as red.

Panel ‘B’ EGCs need to be moved to a new ground bar. Conductors are not color identified by phase or are mis-labeled.

Move panel ‘B’ EGCs to a new ground bar.

Relabel the feeders with A-phase as black, and B-phase as red.

Panel ‘C’ EGCs need to be moved to the existing ground bar. Conductors are not color identified by phase or are mis-labeled.

Move panel ‘C’ EGCs to the existing ground bar. Relabel the feeders with A-phase as black, and B-phase as red.

Panel ‘S2’ EGCs need to be moved to a new ground bar. Did not see evidence of a grounding electrode to a ground rod. Feeders to Panel 'S2' require disconnect per NEC

225.31.

Investigate this further and install as required. Install disconnects on the Feeders to Panel 'S2' per NEC 225.31.

Panel ‘S1’ EGCs need to be moved to a new ground bar. Did not see evidence of a grounding electrode to a ground rod. Feeders to Panel 'S1' require disconnect per NEC

225.31.

Investigate this further and install as required. Install disconnects on the Feeders to Panel 'S1' per NEC 225.31.

Feeders to Panels ‘S1’ and ‘S2’ require disconnects per NEC 225.31.

Install disconnects on the Feeders to Panels

'S1' and 'S2' per NEC 225.31.

In Panel 'S' has a NEMA 1 rated enclosure, the ground and neutral wires are terminated on Neutral bar, no ground bar is installed, KO seals are missing, and the panel is not properly mounted to a structure.

Provide NEMA 3R enclosure for panel, provide a dedicated ground bar in panel and move ground wires from neutral to ground bar, and properly mount to a structure.

Panel 'S' is Provided with a NEMA 1 enclosure which is not rated for use in exterior locations.

Feeder for Mini trailer/building is an extension cord not rated for direct burial and should not be used as such a permanent basis.

Replace extension cord with a more permanent feed to a twist-lock receptacle mounted on a pedestal. Then replace the existing receptacle with a 10’-15’ section of extension cord with a plug. The cord can be coiled on a building-mounted hook when not in use. At this time the proper 4-wire connection can be installed to Panel ‘M’ and

Service disconnect Is unfused.

Install overcurrent protection device such as a breaker or fused disconnect.

No main bonding jumper in service disconnect.

Install main bonding jumper within the service disconnect.

Manual transfer switch and adjacent electrical equipment covereed in ice during winter months.

Provide an awning to provide protection to electrical equipment from ice build-up.

The awning panel feeders are run underground unprotected. Also, the panel is no longer in use.

Abandoning the panel in place and remove the panel feeders and all associated wiring and devices.

The incinerator building needs a grounding electrode installed.

Install new grounding electrode in incinerator building.

The electrical building needs a grounding electrode installed.

Install new grounding electrode in electrical building.

Panel ‘A’ missing ground bar. Panel 'A' feeder conductors are routed unprotected and exposed within the building. The panel also requires bushings/clamps for the occupied

KOs.

Provide new grounding bar in Panel 'A'.

Move panel ‘A’ EGC to the new ground bar.

Install bushings/clamps for the occupied

KOs. For unprotected panel feeder and circuits, encase in conduit or other approved means to provide protectioin.

Panel ‘G’ feeder breakers do not appropriately protect conductors.

Replaced main circuit breaker with a 60A breaker to appropriately protect the conductors.

Café panel 'B' missing ground bar.

Provide new grounding bar in Panel 'B'.

Move panel ‘B’ EGC and grounds to the new grounding bar.

Panel ‘S’ is missing the panel dead front and feeder breakers does not appropriately protect conductors.

Install new dead front. Main circuit breaker needs to be replaced with 60A breaker to appropriately protect the conductors.

Panel ‘F’ missing grounding bar.

Provide new grounding bar in Panel 'F'.

Move panel ‘F’ EGC and grounds to the new grounding bar.

The 20A, 1-pole breaker may be feeding 2-pole motor loads. We did not pull submersible fuel pumps to verify.

If they are 2-pole motors then the existing breakers need a handle tie or need to be replaced with appropriate 2-pole breakers.

Evidence Shed has no grounding electrode or disconnect.

Install 60A disconnect in place of feeder LB on the exterior of the building.

Panel 'E' has no grounding bus bar.

Install ground bar in existing panel 'E' and move ground wires off of neutral bar and over, Park Work

Order # Notes

26431095

26431096

26431096

26431097

26431097

26431098 Unknown conduit size. Assume 0.75"-

1.25"C.

26431098

26431098

26431098

26431099

26431099

26431099

26431099

26431100

26431100

26431102

26431103

26431104

26431104

26431124

26431124

26431124

26431125

26431126 With a new enclosure the mising Kos will be removed from the equation.

26431126

#N/A

26431127

26431127

26431127

26431128

26431128

26431128

26431129

26431129

26431130

26431131

26431133

26431133

26431132

26431132