TURNPOINT LITEHOUSE FURNANCE REPLACEMENT Federal contract opportunity
Solicitation number
140L4326Q0079
Issued by
Department of the Interior Bureau of Land Management Oregon-Washington

About this file

This is a sealed bid solicitation (IFB) for a firm fixed-price construction contract to remove and replace two aging propane furnaces at the Turn Point Keepers Quarters on Stuart Island, San Juan County, Washington. The solicitation number is 140L4326Q0079, issued by the BLM Spokane District on July 7, 2026, with offers due by July 22, 2026 at 1500 hours local time. Award is anticipated to be made without discussions to the responsive bidder with the lowest evaluated price determined to be fair and reasonable.

The contract is set aside exclusively for small businesses under NAICS code 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19 million size standard. The estimated project value ranges between $25,000 and $100,000. The scope of work requires furnishing two new high-efficiency propane furnaces (minimum 95% AFUE), thermostats, surge protectors, and accessories; removal and proper disposal of existing equipment; installation with compatible ductwork and venting; system testing and startup; and training documentation. The contractor must commence work within 10 calendar days of notice to proceed and complete all work within 180 days. A performance bond is required if the contract award exceeds $35,000. The work period runs August 1, 2026 through July 31, 2027. Key submittals include liability insurance certificates, performance and payment bonds, and invoices via the Invoice Processing Platform (IPP). The contractor must comply with Davis-Bacon Act wage requirements, provide certified payrolls, and maintain a Spill Prevention, Control, and Countermeasure Plan. Sealed bids in original and one copy must be submitted to Holand Nordholm, Contract Specialist, at the BLM Oregon State Office in Portland.

View the file

Other files for this federal contract opportunity

Other files attached to TURNPOINT LITEHOUSE FURNANCE REPLACEMENT, newest first.
File Type Posted
B09_Amd0002_Attach1_Q_A__0002.pdf PDF
Sol_140L4326Q0079_Amd_0002.pdf PDF
B09_Amd0002_RFQ_140L4326Q0079_0002.pdf PDF
Sol_140L4326Q0079_Amd_0001.pdf PDF
B09_Amd0001_Attach1_Q_A__0001.pdf PDF
Sol_140L4326Q0079.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140L4326Q0079

BLM OR-ST OFC PROC MGMT BR(OR952)

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204

Holand Nordholm Contract Specialist at:

holand_nordholm@ios.doi.gov

0044050716

LHA

Holand Nordholm 5038086492

07/07/2026

07/22/2026

10 180 FAR Clause 52.211-10

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA

The estimated magnitude of this construction project is between $25,000 and $100,000.

The solicitation will be issued as a total Small Business set aside under NAICS code 238220, Plumbing, Heating, and Airconditiong Contractors, and the size standard is $19 million.

Contractors are reminded that any amount awarded over $35,000.00 requires submission of a Payment Bond.

Company Name:______________________ CPOC:_______________________

SAM UEI: ___________________________ Email and Phone: __________________________

1 59

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

BLM OR-ST OFC PROC MGMT BR(OR952)

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204

LHA

Matthew Duane

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140L4326Q0079

FOB: Destination

00010 TPL FURNACE RPL

Product/Service Code: J071

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- FURNITURE

Period of Performance: 08/01/2026 to

07/31/2027

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

BLM Spokane District, Washington

Section Title

Part I—The Schedule

A Solicitation/contract form

B Bid schedule

C Specifications/Drawings

D Packaging and marking

E Inspection and acceptance

F Deliveries or performance

G Contract administration data

H Special contract requirements

Part II—Contract Clauses

I Contract clauses

Part III—List of Documents, Exhibits, and Other

Attachments

J List of attachments

Part IV—Representations and Instructions

K Representations, certifications, and other statements of offerors

L Instructions, conditions, and notices to offerors

M Evaluation factors for award

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

SECTION B – BID SCHEDULE

This requirement is for one (1) Firm Fixed Price Construction contract for the removal and replacement of two aging, propane fired furnaces located in the basement of the Turn Point Keepers Quarters on Stuart Island, Washington.

BASE

Item no. Item Description Quantity Unit of

Measure

Unit Price Total

0001 Equipment – Gas Furnace

Units (High Efficiency, Single

Stage, ECM fan, 95-96%

AFUE efficiency rating)

2 LS $ $

0002 Accessories – Thermostat

Units (low power, programmable)

2 LS $ $

0003 Safety Equipment – Surge

Protector (AG3000 or equivalent)

1 LS $ $

0004 Additional Services 1 LS $ $

GRAND TOTAL $

LS = Lump Sum

PERFORMANCE PERIOD: See Section F below.

THIS SOLICITATION IS SET ASIDE FOR SMALL BUSINESS CONCERNS.

(End of Section B)

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

SECTION C – SPECIFICATIONS/DRAWINGS

See Description/Specification attachment:

Attachment 1 – Statement of Work (SOW)

CONSTRUCTION SPILL PROVISIONS:

PART 2: PRODUCTS

A. Spark Arresters: Shall meet the requirements of the State of Oregon’s regulations.

PART 3: EXECUTION

3.01 HAZARDOUS MATERIAL CONTAINMENT/CLEANUP

A. During contractor operations on lands managed by the BLM, in event of a release as defined in Oregon

Administrative Rules (OAR), Chapter 340, Division 142, Oil and Hazardous Materials Emergency Response

Requirements, the Contractor shall immediately implement the SPCC plan as referenced herein and notify the on-site Government Contract Representative (COR or PI). The Government Representative will initiate the District’s

Hazardous Materials Contingency Plan and/or Spill Containment Plan reporting requirements. The Government

Representative will remain on scene until relieved by the District Hazardous Materials Management Coordinator

(HMMC) or his/her representative.

B. Spill Prevention, Control, and Countermeasure Plan (SPCC): The Contractor shall develop an SPCC Plan as defined under 40 CFR Part 112. The SPCC Plan will be reviewed and accepted by the Contracting Officer prior to initiating project work. The SPCC Plan shall, as a minimum, contain the following information:

1. Response Priorities

2. Contractor Representative in Charge

3. Duties of Contractor Personnel

4. Contractor Emergency Response Procedures

5. Contents of Spill Containment Kit (SCK)

6. Spill Response Diagram

Upon request, an example of a SPCC may be obtained from the Spokane District Environmental Protection

Specialist for Hazardous Materials.

C. Spill Containment Kit (SCK): The Contractor shall have a SCK, as described in the SPCC, on-site during any operation and provide training to employees on how components of the SCK are used. The SCK must be designed for use with petroleum products, and must contain, as a minimum, the following items:

1. Two Bales (4 Booms/Bale, of 8" dia. X 10’ length Oil-only Absorbent Booms)

2. Two Bales (100 Pads/Bale, of Oil-only Absorbent Pads, minimum of 17"x19"x1/4")

3. One Oil-only Absorbent Sweep (minimum of 18" dia. X 100' length)

4. One Floating On-Water Containment Boom (minimum 18” width x 100’ length) (only required for in-stream or riparian work within 50 feet or less of a waterway.)

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

5. Gloves (PVC and Latex), Goggles, and Garbage Bags sufficient to contain soiled absorbents.

D. The Contractor shall implement the Emergency Response Actions described in the SPCC plan. Those actions include, but are not limited to, immediate action to protect employee health and safety, immediate action to stop the flow of product from the equipment, removal of equipment from the waterway if required and/or possible, deployment of the absorbent booms and pads downstream from the equipment, and any other immediate action as specified by Federal and/or State On-Scene Coordinators or his/her representative. The Contractor shall be responsible for cleanup/removal and proper disposal of contaminated materials from the site.

E. If the HMMC determines that additional resources are needed, the HMMC will implement the District’s

Hazardous Materials Contingency Plan and the District Spill Containment Plan. The Contractor may be responsible for any or all costs associated with this level of effort. The amount of actual damage will be deducted by the

Government from the amount due the Contractor prior to final payment.

(End of Section C)

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

SECTION D – PACKAGING AND MARKING

Section Does Not Apply

(End of Section D)

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

SECTION E – INSPECTION AND ACCEPTANCE

The following clauses are incorporated by reference:

52.246-12 INSPECTION OF CONSTRUCTION AUG 1996

(End of Section E)

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

SECTION F – DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 180 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

(End of Section F)

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

SECTION G – CONTRACT ADMINISTRATION DATA

G.1.0 In accordance with FAR clause 52.223-2, Reporting of Biobased Products Under Service and Construction

Contracts, the Contractor is required to annually report the product types and dollar value of any USDA-designated biobased products purchased during the previous fiscal year (October 1- September 30) through the System for Award Management (SAM). The report is due no later than October 31 of each year during contract performance and at the end of contract performance. Failure to submit the report into SAM in a timely manner may result in contractual remedies.

G.2.0 In accordance with FAR clause 52.223-11, Ozone-Depleting Substances [and/or FAR clause 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners], the

Contractor is required to label products that contain ozone-depleting substances and comply with the applicable requirements of sections 608 and 609 of the Clean Air Act (42 U.S.C. 7671g and 7671h).

The following local clauses are provided in full text:

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)

(a) FAR 42.1102 directs all Federal agencies to collect past performance information on contracts. The

Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System

(CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.1102.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS

User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor

Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be https://www.cpars.gov/ https://www.cpars.gov/ https://www.cpars.gov/ https://www.cpars.gov/

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079 annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the

Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for

Government use supporting source selection actions after it has been finalized.

(End of clause)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(FEB 2021)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice

Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable

Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions –

Commercial Products or Commercial Services included in commercial products or commercial services contracts.

The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Invoice billed according to contract line items and rates.

2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.

3. If partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.

4. If final payment is billed, the last invoice shall state “FINAL”.

5. Contractor’s Release of Claims shall be submitted with the final invoice.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The

Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email

IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the

Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Section G)

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1.0 BONDS

When a financial protection is covered by an individual surety, the Contractor shall email the signed

Standard Form 28 Affidavit of Individual Surety to the contracting office using the instructions in Section

L below.

Bureau of Land Management

Oregon State Office

ATTN: Branch of Procurement Management [Contractor insert Contract no.]

P.O. Box 2965

Portland, OR 97208

Where authorized, bonds covered by United States bonds or notes, certified cashier’s checks, bank drafts or money orders must be mailed to the above address using ATTN: CBS Lead [Contractor insert Contract no.]

H.2.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

H.3.0 WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

H.4.0 ENVIRONMENTAL INTERRUPTION OF WORK

H.4.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work where the Contractor proceeds during unsafe adverse weather or site conditions, and/or fire danger. Historical average days of severe weather have been included in the performance period. The Contractor will not be entitled to additional contract time or compensation for any such suspensions except when unusually severe weather or unforeseen conditions exist.

H.4.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species

Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

H.5.0 DRAWINGS

H.5.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size.

Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the Contracting Officer.

H.6.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.6.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

H.6.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the

Contracting Officer immediately in writing giving the location and nature of the findings.

H.6.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract

Clauses Section of this contract.

H.6.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.7.0 SUBSTITUTION – PROCESSION OF WORK

Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the quotation accepted. The Contractor shall obtain the Contracting

Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.

H.8.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13

October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control

Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control

Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16

U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the

Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the

United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the

Government for all such liability.

H.9.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

H.10.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Reporting of Biobased Products under Service and Construction Contracts

• 52.223-4 Recovered Material Certification

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

H.11.0 UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.12.0 CONSTRUCTION WAGE RATES APPLICABLE TO TRUCK DRIVERS

29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon Act.

H.13.0 FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the

Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.

H.14.0 SUBMITTALS

H.14.1 LIABILITY INSURANCE

In accordance with clause 1452.228-70, upon contract award submit a copy of an acceptable insurance certificate to the Contracting Officer prior to beginning the work by sending it to blm_or_so_952_mail@blm.gov and holand_nordholm@ios.doi.gov.

H.14.2 PERFORMANCE AND PAYMENTS BONDS

Contractor shall furnish all executed Performance and Payments bonds in accordance with clause 52.228-15 to the Contracting Officer. The electronically signed Standard Forms 25 and 25-A shall be sent via email to blm_or_so_952_mail@blm.gov and holand_nordholm@ios.doi.gov.

http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories mailto:holand_nordholm@ios.doi.gov mailto:holand_nordholm@ios.doi.gov

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

H.15.0 SITE VISIT

The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions

Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

To schedule a site visit contact:

Brie Chartier

509-220-5976 bchartier@blm.gov

The following clause is provided in full text:

BLM FIRE PROTECTION REQUIREMENTS

This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In Washington State, the BLM, US Forest Service, Bureau of Indian Affairs, and Washington State Department of Natural Resources all use the same four-level industrial regulation system.

This system, which helps prevent wildfires by regulating work in the woods, is known as the Industrial Fire

Precaution Level (IFPL) system.

Information available at: http://www.blm.gov/or/districts/spokane/fire/index.php

For areas outside this link (generally the Columbia Basin) call the local BLM office. Spokane 509-536-1200

Wenatchee 509-665-2100.

1. CLOSED FIRE SEASON

The closed fire season means that fire season has been declared. The BLM works with their neighboring agencies when declaring this issuing public notices through the newspapers and radio when fire season will be closed for their individual districts. Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:

a. Fire tools must be on site;

b. Fire extinguisher must be in all vehicles;

c. Chainsaws must have a .023-inch mesh screen installed in the exhaust;

d. Only unmodified saws are to be used in the forest;

e. Approved spark arresters must be on all internal combustion engines;

f. Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;

g. No smoking is permitted while working or traveling through any operations area in the forest;

h. No use of explosives is permitted unless approved by the BLM representative;

i. Permits to burn are required unless waived by a BLM representative.

j. Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester.

2. FIRE PRECAUTION LEVELS

There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.

It is the responsibility of the individual operating on forest/range land to know the precaution level for the day and http://www.blm.gov/or/districts/spokane/fire/index.php

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079 take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.

At any time the local Fire Management Officer, reserves the right to shut down any and all operations regardless of the precaution level.

Level I: Closed Fire Season: Fire equipment and firewatch service is required.

Level II: Partial Hootowl: Limits certain activities between the hours of 8 p.m. and 1 p.m.

Level III: Partial Shutdown: Prohibits some activities altogether and limits other activities between the hours of 8 p.m. and 1 p.m.

Level IV: General Shutdown: All operations prohibited.

Example of restrictions:

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

3. FIRE TOOLS REQUIRED DURING CLOSED FIRE SEASON

The operator/contractor shall furnish fire tools to all personnel on site using the following combinations.

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

1-4 5 6 7 8

KINDS

OF

TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

Pulaskis 1 1 1 1 1

Shovels 2 2 2 3 3

Adz

Hoe

1 2 3 3 4

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

NUMBER

OF

PERSONNEL

9 10 11 12 13 14

KINDS

OF

TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

NUMBER

OF TOOLS

Pulaskis 1 2 2 2 2 2

Shovels 3 3 4 4 5 5

Adz

Hoe

5 5 5 6 6 6

In addition to the above handtools, the operator/contractor must provide a backpack pump can filled with water located with the tool box in a readily available area.

All shovels are to be size 0 or larger, long handled. All tools shall be sharp and ready for service. Fire extinguishers as follows:

a. For chainsaws - 8 oz. capacity by weight.

b. For vehicles - UL rating of at least 4 BC.

4. FIREWATCH SERVICES

The purpose of the firewatch is to stay after the day's work is over and report any fire starts to the proper authorities.

The firewatch is required to be on duty after the last power-driven equipment used by the operator has been shut down for the day. The firewatch must be on duty a minimum of one hour. During periods of high fire danger, BLM recommends the firewatch be on the operation site more than the mandated one hour.

A firewatch must:

• Visually observe all parts of the operation area on which industrial activity has been in progress.

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

• Be physically capable of fighting a fire and experienced in operating fire-fighting equipment.

• Have on-site communication (CB radio, cellular or radio phone) to summon in the event a fire breaks out.

Transportation is also required in case radio or phone communication doesn't work.

5. ADDITIONAL WATER SUPPLY

During fire season when inside or within one-eighth of one mile of a state forest protection district and furnish additional water supply and equipment for use in fire suppression in conformity with the rules promulgated by the

State of Washington, when directed by the State in writing. When required, all water supply and equipment components shall be maintained and ready for immediate use.

During fire season when operating a stationary internal combustion engine inside or within one-eighth of one mile of a state forest protection district, Contractor shall provide a water supply, with equipment for its use in fire suppression for each engine, in conformity with the rules promulgated by the State of Washington. All water supply and equipment components shall be maintained and ready for immediate use.

(End of Section H)

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

SECTION I – CONTRACT CLAUSES

The following clauses are incorporated by reference:

Clause Title Date

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS

JAN 2017

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS

MAR 2026 –

RFO Overhaul

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE MAR 2026–

RFO Overhaul

52.209-6 PROTECTING THE GOVERNMENT’S INTERESTS WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED,

SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY

EXCLUDED

MAY 2026 –

RFO Overhaul

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS

MAY 2026 –

RFO Overhaul

52.211-13 TIME EXTENSIONS SEPT 2000

52.211-18 VARIATION IN ESTIMATED QUANTITY APR 1984

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE JAN 2026– RFO

Overhaul

52.219-28 POSTAWARD SMALL BUSINESS REREPRESENTATION JAN 2026– RFO

Overhaul

52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS MAY 2026–

RFO Overhaul

52.222-7 WITHHOLDING OF FUNDS MAY 2026-RFO

Overhaul

52.222-8 PAYROLLS AND BASIC RECORDS MAY 2026-RFO

Overhaul

52.222-9 APPRENTICES AND TRAINEES MAY 2026-RFO

Overhaul

52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988

52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014

52.222-12 CONTRACT TERMINATION – DEBARMENT MAY 2014

52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE

REQUIREMENTS AND RELATED REGULATIONS

MAY 2014

52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988

52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014

52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES JUL 2014

52.222-50 COMBATING TRAFFICKING IN PERSONS MAY 2026-RFO

Overhaul

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 JAN 2022

52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS APR 2026-RFO

Overhaul

52.223-6 DRUG-FREE WORKPLACE MAY 2001

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES FEB 2021

52.226-1 UTILIZATION OF INDIAN ORGANIZATIONS AND INDIAN-OWNED

ECONOMIC ENTERPRISES

MAR 2026–

RFO Overhaul

52.227-1 AUTHORIZATION AND CONSENT DEC 2007

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT

DEC 2007

52.227-17 RIGHTS IN DATA – SPECIAL WORKS DEC 2007

52.228-2 ADDITIONAL BOND SECURITY OCT 1997

52.228-14 IRREVOCABLE LETTER OF CREDIT MAY 2014

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014

52.232-18 AVAILABILITY OF FUNDS APR 1984

52.232-23 ASSIGNMENT OF CLAIMS MAY 2014

52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR

AWARD MANAGEMENT

OCT 2018

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS

MAR 2023

52.233-1 DISPUTES RFO Overhaul

52.233-3 PROTESTS AFTER AWARD RFO Overhaul

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM RFO Overhaul

52.236-2 DIFFERING SITE CONDITIONS JAN 2026– RFO

Overhaul

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK JAN 2026– RFO

Overhaul

52.236-5 MATERIAL AND WORKMANSHIP JAN 2026– RFO

Overhaul

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR JAN 2026– RFO

Overhaul

52.236-7 PERMITS AND RESPONSIBILITIES JAN 2026– RFO

Overhaul

52.236-8 OTHER CONTRACTS JAN 2026– RFO

Overhaul

52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS

JAN 2026– RFO

Overhaul

52.236-10 OPERATIONS AND STORAGE AREAS JAN 2026– RFO

Overhaul

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION JAN 2026– RFO

Overhaul

52.236-12 CLEANING UP JAN 2026– RFO

Overhaul

52.236-13 ACCIDENT PREVENTION JAN 2026– RFO

Overhaul

52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS JAN 2026– RFO

Overhaul

52.236-17 LAYOUT OF WORK JAN 2026– RFO

Overhaul

52.242-14 SUSPENSION OF WORK APR 1984

52.243-5 CHANGES AND CHANGED CONDITIONS OCT 2026-RFO

Overhaul

52.246-21 WARRANTY OF CONSTRUCTION MAR 1994

52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE)

APR 1984

52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) – ALTERNATE I

APR 1984

52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) – ALTERNATE I APR 1984

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

The following clauses are provided in full text:

52.240-93 – BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (MAR

2026 RFO Overhaul)

(a) Definitions. As used in this clause—

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information—

(1) Means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government; but

(2) Does not include information provided by the Government to the public (such as on public websites) or simple transactional information (such as information necessary to process payments).

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on

National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements.

(1) Basic requirements. The Contractor shall safeguard its covered contractor information systems by implementing, at minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal departments and agencies relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by

Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products, other than commercially available off-the-shelf items, or commercial services), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(End of clause)

52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026 (MAY

2026-RFO Overhaul)

(a) Definitions. As used in this clause—

United States means the 50 states, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer

Continental Shelf Lands Act (43 U.S.C. 1331, et seq.).

Worker—

(1)

(i) Means any person engaged in performing work on, or in connection with, a contract covered by

Executive Order 14026, and —

(A) Whose wages under such contract are governed by the Fair Labor Standards Act (29

U.S.C. chapter 8), the Service Contract Labor Standards statute (41 U.S.C. chapter 67), or the

Wage Rate Requirements (Construction) statute (40 U.S.C. chapter 31, subchapter IV);

(B) Other than individuals employed in a bona fide executive, administrative, or professional capacity, as those terms are defined in 29 CFR part 541; and

Turn Point Lighthouse Furnace Replacement, Stuart Island, San Juan County, WA SOLICITATION NO. 140L4326Q0079

(C) Regardless of the contractual relationship alleged to exist between the individual and the employer.

(ii) Includes workers performing on, or in connection with, the contract whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c).

(iii) Also includes any person working on, or in connection with, the contract and individually registered in a bona fide apprenticeship or training program registered with the Department of Labor's

Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship

Agency recognized by the Office of Apprenticeship.

(2)

(i) A worker performs on a contract if the worker directly performs the specific services called for by the contract; and

(ii) A worker performs in connection with a contract if the worker's work activities are necessary to the performance of a contract but are not the specific services called for by the contract.

(a) Executive Order minimum wage rate.

(1) The Contractor must pay to workers, while performing in the United States, and performing on, or in connection with, this contract, a minimum hourly wage rate of $15.00 per hour beginning January 30, 2022.

(2) The Contractor must adjust the minimum wage paid, if necessary, beginning January 1, 2023, and annually thereafter, to meet the applicable annual E.O. minimum wage. The Administrator of the Department of Labor's

Wage and Hour Division (the Administrator) will publish annual determinations in the Federal Register no later than 90 days before the effective date of the new E.O. minimum wage rate. The Administrator will also publish the applicable E.O. minimum wage on https://www.sam.gov (or any successor Web site), and a general notice on all wage determinations issued under the Service Contract Labor Standards statute or the Wage Rate

Requirements (Construction) statute, that will provide information on the E.O. minimum wage and how to obtain annual updates. The applicable published E.O. minimum wage is incorporated by reference into this contract.

(3)

(i) The Contractor may request a price adjustment only after the effective date of the new annual E.O.

minimum wage determination. Prices will be adjusted only for increased labor costs (including subcontractor labor costs) as a result of an increase in the annual E.O. minimum wage, and for associated labor costs (including those for subcontractors).