B08_-_Price_sheet_AOF_Replace_Domestic_Water_Heater_xls.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- AOF DOMESTIC HOT WATER REPLACE NACE USPP
- Solicitation number
- 140P3026Q0011
About this file
This is a pricing template for a firm-fixed-price contract to replace a domestic water heater under the Department of the Interior National Park Service solicitation 140P3026Q0011, titled "AOF Domestic Hot Water Replace NACE USPP." The period of performance runs from June 22, 2026, through August 31, 2026.
The price sheet is structured to capture costs for replacing a natural gas boiler under Contract Line Item Number (CLIN) 10, with the contractor required to itemize materials, labor, and overhead/fee components. The template provides examples of cost categories including materials (water heater and copper piping), labor (laborer and plumber technician), and overhead/fee breakout (G&A, profit, and insurance and bonding). All pricing fields in the provided template currently show $0.00, indicating this is a blank form awaiting contractor completion. Contractors must submit their actual proposed costs for materials, labor, and overhead to establish the total proposed cost for this firm-fixed-price domestic water heater replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P3026Q0011_Amd_0001.pdf | ||
| Sol_140P3026Q0011.pdf | ||
| B08_-_Scope_of_Requirements_AOF_Replace_Water_Heater.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Domestic Water Heater
| Price Sheet | ||||
| PERIOD OF PERFORMANCE: 06-22-26 - 08-31-26 | ||||
| AOF Replace Domestic Water Heater | ||||
| Firm -Fixed Price | ||||
| Total | $0.00 | |||
| Item # | Description | # of Units | Unit Cost | Total |
| CLIN 10 | Replace Natural Gas Boiler | $0.00 | ||
| Materials | ||||
| Identify Types of Materials | Example: Water Heater | $0.00 | ||
| Eample: copper piping | $0.00 | |||
| Subtotal of Materials | $0.00 | |||
| Labor | ||||
| Identify Labor Included | Example: Laborer Regular | $0.00 | ||
| Example: Plumber Tech Regular | $0.00 | |||
| Subtotal of Labor | $0.00 | |||
| Overhead/Fee | ||||
| Breakout Overhead Fees and Calculations | Example: G&A | $0.00 | ||
| Example: Profit | $0.00 | |||
| Example: Insurance &Bonding | $0.00 | |||
| Subtotal of Overhead/Fee | $0.00 | |||
| CLIN 10 Total | $0.00 | |||
| Total Proposed Cost | $0.00 |
File details come from the government source that posted it. Updated .