B08_Price_schedule_RESTORE_WOOD_COMPONENTS_EXEDRA.xls
XLS spreadsheet 33 KB Posted
- Attached to
- EDIS RESTORE EXEDRA WOOD COMPONENTS
- Solicitation number
- 140P4524Q0070
About this file
This document appears to be a price schedule template for the "Restore Historic Wood Components of the Exedra Room in Thomas Edison's Home, Glenmont" project. The related federal contract opportunity is Solicitation Number 140P4524Q0070, titled "EDIS RESTORE EXEDRA WOOD COMPONENTS", issued as a Request for Quote (RFQ) under FAR Part 12 and 13 by the Department of the Interior National Park Service Northeast Region.
The price schedule template includes labor categories, equipment, and materials required for the restoration work, with line items for tasks such as installing/de-installing protection measures, repairing wood components and windows/doors, historic paint analysis, and preparing the building envelope. The contract is set aside for small businesses. No specific pricing or award details are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4524Q0070_Amd_0001.pdf | ||
| B09_Questions_and_Answers_0001.docx | DOCX document | |
| B03_2015-4211_rev_27_072224.pdf | ||
| A04_SOW_ExedraWOOD_COMPONENTS.pdf | ||
| B08_References_Worksheet_(1)_(1).pdf | ||
| Sol_140P4524Q0070.pdf | ||
| Technical_Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| THOMAS EDISON NATIONAL HISTORICAL PARK | ||||
| Government Estimate | ||||
| 6/2/24 | ||||
| Project: Restore Historic Wood Components of the Exedra Room in Thomas Edison's Home, Glenmont | 255927 | Work Order # | n/a | |
| Labor Skill | Hours | Rate | Amount | Totals |
| Travel | $0.00 | |||
| Install/de-install protect in place measures | $0.00 | |||
| Labor to restore wood components | $0.00 | |||
| Produce treatment proposal and final treatment report | $0.00 | |||
| Labor to repair windows/reglaze as required;repair doors | $0.00 | |||
| Historic paint analysis (both for interior and exterior finishes) | $0.00 | |||
| Produce Briefing Report for securing the envelope of the building | $0.00 | |||
| Prep and Paint interior/exterior with historic finish | $0.00 | |||
| Equipment (Type) | Hours | Rate/Cost | ||
| Scaffolding | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| - 0 | ||||
| - 0 | ||||
| Mobilization | - 0 | |||
| Total Equipment Costs | ||||
| Material (Type) | Quantity | Amount | ||
| Supplies and materials for restoration work/paint | $0.00 | |||
| Supplies and materials for protecting in place measures | $0.00 | |||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| Total Material Costs | $0.00 | |||
| - 0 | ||||
| - 0 | ||||
| - 0 | ||||
| Grand Total | $0.00 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .