This document is a Statement of Work (SOW) for a firm-fixed price contract to restore the historic wood components of the Exedra Room in Thomas Edison's home, Glenmont, located in West Orange, New Jersey. The key objectives are to safely and successfully stabilize and restore the historic wood components of the Exedra Room while adhering to National Park Service and Department of the Interior preservation standards, in order to return the room to its historic appearance.
The SOW details the required tasks, which include restoring rotted and damaged wood elements, addressing issues with the exterior windows and doors, conducting historic paint analysis, and applying temporary measures to secure the envelope of the building during the restoration work. The contract has a 10-month period of performance and requires the contractor to provide a detailed treatment proposal, protect-in-place plan, and health and safety work plan for NPS approval prior to starting on-site work. Payment will be made in two installments, with 50% upon completion of the initial work, including the installation of the protect-in-place measures, and the remaining 50% upon completion of all restoration work. This is a small business set-aside solicitation issued by the Department of the Interior National Park Service Northeast Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4524Q0070_Amd_0001.pdf | ||
| B09_Questions_and_Answers_0001.docx | DOCX document | |
| B03_2015-4211_rev_27_072224.pdf | ||
| B08_Price_schedule_RESTORE_WOOD_COMPONENTS_EXEDRA.xls | XLS spreadsheet | |
| B08_References_Worksheet_(1)_(1).pdf | ||
| Sol_140P4524Q0070.pdf | ||
| Technical_Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Restore Historic Wood Components of the Exedra Room in Thomas Edison’s Home, Glenmont
PMIS PROJECT 255927
Request for Quote
June 16, 2024
1.0 BACKGROUND
2.0 SCOPE/RFP REQUIREMENTS AND EVALUATION CRITERIA
3.0 OBJECTIVES
4.0 TASKS
5.0 DELIVERY
6.0 GOVERNMENT-FURNISHED PROPERTY
7.0 SECURITY
8.0 PLACE OF PERFORMANCE
9.0 DELIVERY/PERIOD OF PERFORMANCE
10.0 PAYMENT SCHEDULE
1.0 BACKGROUND
The purpose of this project is to restore the historic wood components of the Exedra Room in the Edison family home, Glenmont, located in West Orange, New Jersey. This unique, character defining feature is a passageway that connects the historic Dining Room and the historic Drawing Room on the first floor. It is a significant architectural component of this
1880 Queene-Anne style mansion, designed to display plants and statuary. Because the stained glass ceiling in this room is illuminated with a series of lightbulbs, the skylight above the room also represents the unique relationship that Thomas Edison’s influence had on the decorative objects that were displayed inside of his family residence.
Thomas Edison National Historical Park is a National Park Service site located in West
Orange, New Jersey. The park consists of two separate sites, approximately one mile apart.
Thomas Edison’s home, Glenmont, is located in a private residential community known as
Llewellyn Park. Built in 1880, Glenmont is a 29 room Queen-Anne style mansion which remains intact, complete with interior furnishings and finishes that reflect the rich historic decorative period during the years when Thomas Edison and his family resided in the home.
The term “Exedra”, which describes this room, originates from a Shakespearean reference and was so named by Thomas Edison’s wife, Mina Edison. Ensuring that this architectural component is properly preserved guarantees that this part of the Edison history shall be shared with park visitors for generations to come.
The majority of the work shall be performed on-site, in-situ, in the Exedra, a historic room/passageway located on the first floor of Thomas Edison’s Victorian mansion, Glenmont. The small, period room, which is pentagonal in shape, contains several historic windows, one pair of historic exterior doors, two pairs of original interior glass front French doors, two additional original leaded glass interior windows, original lighting equipment and associated wiring, as well as historic woodwork and finishes. The mosaic, marble tile on the floor dates back to 1909.
In all instances, the selected vendor shall be responsible for protecting-in-place adjacent artifacts, built-in features such as the adjacent stained glass windows, all other historic windows and doors, historic steps and patios, historic surfaces such as walls and floors, modern carpeting, etc. both in the Exedra, along the path of travel used for installation and de-installation of any equipment or supplies or artifacts, and also the skylight, as well as the areas directly above the skylight, namely the exterior roof and wall areas where additional work may take place, as required. Protect in place measures may also be required in exterior areas adjacent to the Exedra, depending upon the selected vendor’s approach for completing this work. This is required in order to prevent damage to the artifacts, historic surfaces and architectural features, built-in features, gutters, adjacent exterior paint finishes, original windows and stained glass windows and skylights, modern carpeting, original electrical lighting and heating components, etc. Please note that in accordance with the Department of the Interior Preservation Standards, all historic architectural and building system features shall be retained, undamaged and whenever possible, remaining in their original location, such as the historic woodwork that frames the windows and the skylight, the original doors, the stained glass, and any original electrical lighting features or equipment as these may be reused to complete this project. The selected vendor shall also be required to adhere to park safety and security policies which shall be further detailed in this document.
Documentation work for this project, which can be performed off-site, shall consist of producing a treatment proposal outlining the contractor’s approach and methodology for restoring these wood components in this historic room. This proposal shall include a detailed description of the types of repairs that will be undertaken, their specific locations, and the materials that will be used for the project. This document requires NPS review and approval prior to the commencement of any related project work. Documentation work for this project will also include producing a final treatment report, outlining the work performed for the project, which includes before and after photos of the work.
1.1 HISTORIC BACKGROUND
The Exedra, a patio room which connects the two wings of the first floor, was added to the house’s original design by Thomas Edison’s second wife, Mina Edison. It serves as an area to display plants and statuary and also as an exit to the back patio. This Exedra, also referred to historically as the Fern Room, measures approximately 9 feet by 12 feet, and is situated at the southwest corner of the home. This passageway was designed by architect Wilbur Knowles of New York City, circa 1909-1910. As per a bill dated January 31, 1910, the work included mason work, carpenter work, heating ante-room, copper roofing, electrical work, mosaic work, skylight work, painting work, and leaded glass for a total cost of $6,048.09. The room is pentagonal in shape with straight north, east, and west walls. It has a curved southwest wall and a diagonal southeast wall. Most of the southwest wall and ceiling were glazed. As part of the design, two new doorways with plate glass French doors were fashioned out of windows, doorways which now connected the Dining Room and Drawing Room to the space. A third doorway on the southwest wall of the Exedra provides exterior access. The original marble tiles on the floor were likely chosen due to their suitability for displaying potted plants.
A historic 1914 photograph of the room shows that it is filled with potted plants, hanging plants, and palms. A 1916 photograph of the breezeway indicates that statuary on pedestals were also displayed by the Edisons in the Exedra. Original decorative woodwork in the passageway includes board and batten paneling, high baseboards, a shallow window seat, and a pine ceiling cornice. Long, narrow window sashes from a series of curved windows on the southwest wall. Two additional interior leaded glass windows on the east wall provide ventilation for the Telephone Room and the Lavatory Room located in a corridor below.
The 4 feet by 6 feet (approximate measurements) stained glass panel used as a skylight is identified as a “leaded glass dome light in wrought iron frame” in the 1921 and 1924 appraisals for the mansion. Most of the ceiling area for this small space is comprised of the stained glass skylight with only an additional small area at the south end of the room which is paneled in wood. The stained glass panel is supported on its interior side with four iron bars which form a grid over the stained glass panel. Historically, the panel was backlit with electric lighting provided by Thomas Edison. This electrical lighting equipment and wiring still remain in the area of the ceiling above the skylight identified as the “skylight cupola”.
The lighting system, which used a series of lightbulbs to backlight the stained glass, was installed in circa 1909-1910 by electrician George R. Boyce.
Existing Conditions:
The Historic Structure Report: Part II for Glenmont (2017), outlines the current condition of various architectural elements in the mansion. It indicates that, overall, there is an issue with the extensive wood trim elements on the mansion which are indicative of its Victorian style.
They have been exposed to the weather during periods of time when the home was not painted regularly, and have exceeded their cyclical lifetime. The report states that, “deteriorated or missing wood trim, moldings, and siding in multiple locations admit water and contribute to the degradation of Glenmont’s character defining features.”
An example of one of those character defining features is the Exedra, a small patio room which connects the two wings of the first floor, which was added to the house’s original design by Mina Edison in 1909-10. The room’s dome-like shape adds a bit of whimsy to the mansion’s complex first floor design layout. The Exedra serves as an area to display plants and statuary and also as an exit to the Den’s back patio.
Past issues with malfunctioning gutters and poorly constructed roof lines permitted water to pool in this area, causing serious damage to the stained glass ceiling and its frame, as well as to other interior room components, over the course of many decades. The water penetration issues were corrected during a 2017 roofing project at Glenmont. However, due to previous moisture issues, the wood elements in this room are fragile and in need of repair. This wood is visibly rotted with peeling and blistering paint. No known previous color analysis has been completed for the interior wood walls and trim in order to determine its original painted finish. The, likely original, painted and glazed areas of the room are flaking. The stained glass ceiling and its associated iron support bars were conserved in 2023. It is important to note that this stained glass ceiling will remain in-place and intact during this current project to restore the associated wood components of the Exedra.
Contract Type
The government anticipates awarding a firm-fixed price contract.
SAM Registration
Contractor shall be registered in SAM.gov prior to contract award.
SITE VISIT
All offerors submitting a quote for this contract are strongly encouraged to visit Thomas
Edison’s home, Glenmont, for the purpose of examining the Exedra, its interior, and the exterior roof and window area above and on one side of the Exedra, as well as other related site conditions. Contractor shall bring their own ladder (maximum of twelve feet if used indoors) to inspect the Exedra as well as any exterior elements related to the project. Please ensure that the ladder shall be safely navigated through areas of the historic interior of
Glenmont in order to access the first floor Exedra. These areas contain built-in features, historic wall treatments, historic architectural features, historic artifacts, historic steps, narrow hallways, etc. These spacial constraints, which are indicative of a fully furnished
Queen-Anne style Victorian home, shall be safely navigated. Transport and use of ladder on park property during the site visit shall occur without damage to adjacent historic objects and/or surfaces/features as well as without damage to the modern carpeting that defines the path of travel throughout the home’s interior and also without damage to any elements of the mansion’s exterior or its landscape, including the adjacent stained glass window known as
“Penelope Waiting for Ulysses to Come Home from War”. If the Exedra is accessed through its exterior door, the contractor shall ensure that there is also no exterior damage to any of
Glenmont’s features or components.
Failure to visit the site in-person shall not relieve the Contractor from responsibility for having estimated properly the difficulty or cost of successfully performing the work.
Site visit can be scheduled by contacting Beth Miller (see contact information below).
Beth Miller
Museum Curator/Thomas Edison National Historical Park beth_miller@nps.gov
(973)-809-4360
2.0 SCOPE
The scope includes the restoration of the wood components in the Exedra Room in order to ensure that it is structurally stable and secures the envelope of the building. Please note that approximately forty percent of these wood components are associated with an exterior wall.
Project work also includes addressing any water penetration or glazing issues associated with the seven exterior windows. These windows are irregularly shaped (approx. 68 inches in length by 14 inches in width) and are part of the structure of the exterior wall in the Exedra.
This project also involves addressing repairs to the wood components in the ceiling of the
Exedra and issues associated with the exterior doors and the two sets of interior doors. Paint finishes will also be addressed on the perimeter of the two interior stained glass windows.
The project will involve selecting the most minimally invasive method as is possible, replacing in-kind only the wood components that are damaged beyond repair. The project will also involve conducting historic paint analysis to determine what the original painted finish for the interior areas/exterior areas of the Exedra were, in order to recreate them.
Applying these finishes to the Exedra is part of the scope of this project. This interior finish will be applied to all of the wood components inside of the Exedra as well as to any interior door frames or window frames or baseboards as well as to the wood components in the ceiling, including the frame around the perimeter of its stained glass element. All of this work shall be completed in order to return the interior of this space to its historic appearance.
The project will also involve protecting in place any adjacent historic and non-historic features or on-site areas in order to prevent damage to them during the course of the project mailto:beth_miller@nps.gov work. It will also involve temporarily securing the envelope of the building and any associated electrical systems or historic elements in this area, such as its stained glass, while the restoration work is taking place. This involves using industry-standard methods that are the least invasive to the historic structure. All design components of the project must be pre-approved by the NPS before the project can proceed. More specific tasks and requirements for this scope of work are outlined in section 4.0 of this document.
Inspection and Acceptance Processes:
During work progress, the Contractor shall furnish upon request: a daily report detailing work attempted or accomplished. Prior to the restoration work commencing, the Contractor is required to provide a detailed treatment proposal, detailing their approach and methodology for this restoration, which must be reviewed and approved by the NPS, prior to this work commencing. Contractor must also provide a 1-2 page briefing report detailing the temporary protect in place measures that they will use to secure the envelope of the building during the course of the project. This approach must be pre-approved by the NPS, prior to this work commencing. At the conclusion of the contract the Contractor shall provide a treatment report detailing the work executed which outlines its process and also the materials used to complete the work as well as before and after photographs. Vendor shall also be responsible for gaining pre-approval from the NPS for any associated plans identified in this document, such as the Protect-in-Place plan and the health and safety work plan. Please note that any plan that does not adhere to the guidelines set forth in this statement of work shall not be approved. Work will not proceed until these plans are approved. Please review these guidelines carefully.
Evaluation Methodology:
The Government anticipates awarding a firm-fixed price contract to the responsible offeror whose quote conforms to the solicitation and represents the best value to the Government based upon an integrated assessment of the evaluation factors listed below. The Government will consider: Technical Capability, Personnel, Past Performance, and Price. The factors listed below are in descending order of importance.
When combined, all other evaluation factors are significantly more important than price.
However, price will contribute substantially to the selection decision. The evaluated price will not be rated or scored but will be a consideration for reasonableness in the final source selection decision. The government reserves the right to award this action to other than the lowest priced offer.
1. Factor 1- Technical Capability (limited to 2 pages)
Offeror shall submit a written description that demonstrates they have the required technical knowledge and necessary equipment to successfully complete this project. Said description shall specify what techniques, equipment, and labor will be employed to complete this project as well as methods that protect and meet preservation concerns for this original historic room, its stained glass ceiling and the related room interior/roofing and ceiling system, the electrical lighting system, as well as any exterior elements of the mansion that require protect in place measures, due to their proximity to the work area and their historic value.
2. Factor 2- Personnel (limited to 4 pages)
Offeror shall demonstrate skills and training of personnel involved in this project, showing minimum required skills are met. The personnel team shall also include a licensed preservation architect as per the National Council of Architecture Registration Board and be a member of AIA. Please note that proof of this license may be requested.
Due to the nature of this work, with its related safety and security issues, sub-contracting is prohibited for this project.
Please include this information to identify the completed projects:
• Point of Contact (with verifiable telephone number and email address)
• Company Name and Address
• Company Telephone Number and Email Address (verifiable)
• Identification of Historic Resource Treated
• Brief Description of the Project with Illustrations which demonstrates similarity in scope and complexity to this project
• Dates Work Was Performed
The offeror’s team shall include a licensed preservation architect. Applicant shall also demonstrate familiarity with the NPS conservation and preservation standards, the Secretary of the Interior Standards for the Treatment of Historic Properties, and the Section 106
Compliance process for properties on the National Register of Historic Places as well as conform to these standards during this project (See NPS Museum Handbook at https://www.doi.gov/museum/nps-handbooks and https://www.nps.gov/tps/standards.htm and National Register of Historic Places (U.S. National Park Service) (nps.gov) for more information). The offeror’s team must also be familiar with the American Institute of
Conservation standards and code of ethics (AIC). See Code of Ethics and Guidelines for
Practice (culturalheritage.org) for more information. Any proposal containing suggestions, approaches, options, or ideas that do not conform with National Park Service, Department of
Interior, and/or AIC conservation and preservation standards will be automatically disqualified from the bidding process.
Please note that the licensed preservation architect for the project is considered to be essential personnel and must be involved in all related aspects of this work, without substitution. Sub-contracting is prohibited for this project.
3. Factor 3- Past Performance (limited to 4 pages)
a. An evaluation of offeror’s past performance information will be conducted subsequent to the technical evaluation. The offeror must have demonstrated successful completion of projects similar in quality, technique, and complexity.
Preference will be given to quotes that demonstrate past performance of similar projects of similar historic significance.
b. The evaluation will be based on information obtained from the written proposal, photographs, other relevant past performance information obtained from sources known to the Government, and any other information supplied by the offeror, to include problems encountered on the identified contracts and corrective action taken.
c. The Government will assess the relative risks associated with each offeror.
Performance risks are those associated with an offeror’s likelihood of success in performing the acquisition requirements as indicated by that offeror’s record of past performance.
d. The assessment of performance risk is not intended to be the product of a mechanical or mathematical analysis of an offeror’s performance on a list of https://www.doi.gov/museum/nps-handbooks https://www.nps.gov/tps/standards.htm https://www.nps.gov/subjects/nationalregister/index.htm https://www.culturalheritage.org/about-conservation/code-of-ethics https://www.culturalheritage.org/about-conservation/code-of-ethics contracts, but rather the product of subjective judgement by the Government after it considers all available and relevant information.
e. When assessing performance risks, the Government will focus on the past performance of the offeror as it relates to all acquisition requirements, such as: 1) the offeror’s record of performing according to specifications, including standards of good workmanship; 2) the offeror’s record of controlling and forecasting costs;
3) the offeror’s adherence to contract schedules including the administrative aspects of performance; 4) the offeror’s reputation for reasonable and cooperative behavior and commitment to customer satisfaction; and 5) the offeror’s business-like concern for the interest of the customer.
f. The Government will consider the currency and relevance of the information, sources of the information, context of the data and general trends in the offeror’s performance. The lack of a relevant performance record may result in an unknown performance risk assessment, which will neither be used to the advantage nor disadvantage of the offeror.
Note: Contractors submitting offers without past performance will receive a neutral rating.
Offerors shall provide evidence of comparable past work demonstrating a minimum of 5 year’s experience in the field of architectural historic preservation, demonstrating three examples of structural wood restoration, and its associated carpentry work, for a project of similar scope, size, material, complexity, and historic resource value to that required by this solicitation. These examples must demonstrate work in historic properties that are listed on the National Register of Historic Places, for a building which is at least 75 years old. This work must also have been executed within the past ten years. Please note that the National
Register of Historic Places identifies historic properties of significance within the United
States.
Two of these identified projects must also include elements of work related to securing the envelope of a historic building which include applying long-term temporary protective measures for securing exterior walls and/or windows for a significant amount of time (a minimum of one year). These past performance examples must also include two examples of work that was undertaken which resulted in Dutchman repairs and also resulted in re-glazing historic windows in order to ensure that they were watertight. Past performance examples must also include one example of conducting historic paint analysis in order to determine the correct painted finish for a property listed on the National Register of Historic Places.
A narrative that articulates past experience and a description of successful completion of deliveries shall be provided by the bidder to meet this requirement.
Note: Listing completed projects does not address this criterion. A narrative that articulates past experience and description of successful completion of deliveries should be discussed.
Price
a. Offeror’s price quote will not be point scored or adjectively scored but will be evaluated on price reasonableness. The price quote will also be used as an aid to determine that the Offeror understands the requirements of the solicitation, price reasonableness and to assess the validity of the offeror’s approach to managing and performing the work.
b. The offeror shall submit a price quote separate from all other volumes; any pricing information found in the technical or past performance volumes will be removed prior to evaluation.
c. The Government will evaluate the price quote for reasonableness. Reasonableness shall be determined considering other competitive prices received and comparison to the Independent Government Estimate. The Government will also evaluate price with regards to the ability of the offeror to meet requirements in terms of skills required, complexity of disciplines and job difficulty, if the Government deems such analysis necessary.
3.0 OBJECTIVES
The goal is to safely and successfully stabilize and restore the historic wood components of the Exedra Room at Glenmont, while adhering to National Park
Service and the Department of the Interior’s Restoration and Preservation standards, in order to return it to its historic appearance. This restoration work will also include repairs to the exterior windows and the exterior doors in this space which are detailed in Section 4.0 of this document. The project also entails applying temporary measures in the area in order to temporarily secure the envelope of the building while the restoration work is being performed. Historic paint analysis and repainting the interior wood components/metal window frames in the room to reflect their historic painted finish is also part of this project. Historic paint analysis and repainting the exterior of the Exedra to reflect its historic painted finish is also part of this project. See Section
4.0 for more details.
Results of the project shall improve the appearance, stability, and preservation of the
Exedra and its related components, enabling the park to accurately depict this original historic interior in Glenmont for study by scholars and for viewing by the visiting public.
4.0 TASKS
•4.1 A qualified vendor will restore rotted and damaged wood elements of the dome shaped
c. 1909-10 Exedra room of Glenmont, including the wood exterior wall, all other interior wood elements on the walls and ceiling, window sills/frames (both interior and exterior surfaces), the wood stained glass ceiling surround (interior), & all doors (exterior and interior surfaces). Additional tasks are included in this project, as identified below:
Dutchman repairs that are proud of adjacent surfaces will be planed down to avoid accelerated deterioration.
Split/open joints will be addressed.
Project will result in all doors functioning properly & the exterior doors having a weathertight seal. All finishes on the two sets of interior French doors will be repainted using the appropriate paint color and finish as identified in the historic paint analysis for this project. The two exterior doors will be re-stained and repainted, as required, based upon the historic paint analysis, to address their finish issues. Please note that the finish issues for the exterior doors must be addressed on both sides of each door. Missing or damaged trim on the exterior doors must also be addressed. The contractor must ensure that all screening on the exterior doors is intact and stable, otherwise they must replace in-kind. Contractor must ensure that all doors close properly and can be locked.
Deteriorated decorative wood trim in the interior of the room, including both on the walls and ceiling, including the window frames and ledges, including the baseboard, including the decorative molding, and including the wood surround for the stained glass ceiling, will also be restored/repaired as part of this project. The goal is to address any damaged or rotted wood in order to stabilize the structure and to return it to its historic appearance. The least invasive methods, retaining as much of the historic fabric as is possible, will be utilized in order to perform this work. Any bidding proposal that does not recommend this type of approach will not be considered.
If required, the exterior wood wall will be removed, structurally stabilized, and returned to its original location and configuration. Contractor must also repaint the exterior of the Exedra, in its historic paint color and finish. Additional historic paint and finish analysis will be required in order to perform this work, which is also the responsibility of the contractor. Work will be completed as to retain the original character of all finishes using in-kind materials, as required.
Vendor must include the cost of prepping any building components for restoration work or for repainting or refinishing in their fixed cost bid, as they are included in the scope of this project.
Vendor will repaint the interior of the room (walls and ceiling) based upon their historic paint analysis used to determine the finish used during the historic period. This also includes all doors, window sills, window frames, window ledges, decorative moldings, baseboard, the stained glass ceiling wood surround, etc. The cost, supplies, and labor for conducting all historic paint analysis is the responsibility of the contractor and included in the scope of this project. Furthermore, the contractor is responsible for conducting an additional historic paint analysis on the exterior of the Exedra, in order to repaint the exterior of the Exedra, in its entirety, in order to match the current paint color and finish on the rest of the mansion, using the historic paint analysis to select the correct color and finish.
Vendor will also repair the seven exterior windows to ensure they are watertight, including reglazing them, if deemed necessary. Vendor is also responsible for prepping and repainting the metal frames of the two interior stained glass windows with the appropriate painted finish, as per their historic paint/finish analysis. Please note that the costs associated for all prep work required for repainting or reapplying historic finishes, as per the scope of this project, is the responsibility of the contractor and should be included in their fixed cost price.
Vendor is responsible for installing temporary protect in place measures to secure the envelope of the building while this restoration work is taking place. This includes protection for the stained glass ceiling while the work is being performed. These protect in place measures must be non-invasive, reversible, and must adequately protect the building both from the elements and also from theft. The Vendor will de-install these protect in place measures when the project is complete. Please note that the contractor is responsible for ensuring that these NPS approved protect in place measures for securing the envelope of the building are in place at Glenmont when they leave the site at the end of each on-site work day.
Protective measures must protect the ceiling and the Exedra from water leaks, entry of animals, insects, or other pests, moisture penetration, mold, dust, and otherwise protect the building and its contents during inclement weather or unforeseen weather events. Protective measures must remain structurally stable and secure during high winds, driving rain, and/or earthquakes. and be able to support the weight of at least 16 inches of fallen snow on the top of the ceiling and also be secured enough in order to prevent someone from accessing the building through this opening in this location for purposes of theft. Please note that all electrical components must also be safely secured and protected from weather elements in order to prevent fire or electrical shock.
Please note that the envelope of the building must remain safe and secure, applying the appropriate protective measures, throughout the entire duration of the project from beginning to end, protecting the structure and its contents from issues such as inclement weather, leaking, and theft, even while the selected vendor is not on-site.
Prior to the restoration work commencing, the Contractor is required to provide a detailed treatment proposal, detailing their approach and methodology for this restoration, which must be reviewed and approved by the NPS, prior to this work commencing.
Contractor must also provide a 1-2 page briefing report detailing the temporary protect in place measures that they will use to secure the envelope of the building during the course of the project. This approach must be pre-approved by the NPS, prior to this work commencing.
At the conclusion of the contract the Contractor shall provide a treatment report detailing the work executed which outlines its process and also the materials used to complete the work as well as before and after photographs.
Selected vendor is responsible for protecting in place all adjacent areas to protect them from damage during the course of the project, both on the interior and exterior of Glenmont, based upon selected vendor’s approach for this project and securing the envelope of the building. In all cases, this will entail protecting all historic features, artifacts, architectural features, and finishes inside of the interior of the Exedra (including, but not limited to, doors, windows, walls, and floors) and exterior elements adjacent to the roof where the skylight will be removed. In all cases this includes protecting in place the oversized stained glass exterior window which illuminates the main staircase in Glenmont, known as “Penelope Waiting for
Ulysses to Come home from War” which is directly adjacent to the work area. The intent is to protect these areas and features from damage during the course of the project.
Contractor is also responsible for protecting the finishes, architectural features, objects, and modern carpeting along the path of travel used for installation and de-installation of any equipment or supplies as well as to any exterior areas of the home to prevent damage during project related work. Please note that as per Section 5.0 of this document, the protect-in-place plan which outlines the methods which will be used to protect these non-historic and historic features, finishes, artifacts, etc. from damage must be NPS approved to ensure its methods and materials are in accordance with the NPS and the Secretary of Interior conservation, preservation, and storage standards. Work shall not proceed until the approved plan is executed.
Please note that the approach, methodology, and materials for this project shall be outlined in detail in the bidder’s proposal and executed with no deviation.
• 4.2 The selected vendor shall also be required to adhere to park safety and security policies which are further detailed in this document. Safety precautions taken to prevent loss or damage to Glenmont artifacts and to minimize risk of accident or injury should be included in the bidder’s proposal.
• 4.3 Selected vendor shall also be responsible for obtaining pre-approval by NPS staff for selected techniques and for anticipated results that will permanently alter any artifacts, historic finishes, the ceiling’s supportive elements, structural elements of the mansion (roofs, windows, etc.), floors, walls, ceilings, etc. or any aspect that could result in altering the appearance of the Exedra and its historic elements, the historic exterior elements of
Glenmont, etc. Applicant shall also demonstrate familiarity with the NPS conservation and preservation standards and the Secretary of the Interior Standards for the Treatment of
Historic Properties (See NPS Museum Handbook at https://www.doi.gov/museum/nps-handbooks and https://www.nps.gov/tps/standards.htm for more information).Selected vendor is responsible for performing this work using methods and materials in accordance with the NPS and the Secretary of Interior conservation, preservation, and storage standards that meet industry identified curatorial standards as well as NPS standards. It is important to note that the NPS advocates replacing historic materials in-kind and using the least invasive approach to preservation projects. This criteria should be considered when formulating a bidding proposal. Any proposal containing suggestions, approaches, options, or ideas that do not conform to the above stated requirements shall not be considered.
• 4.4 During the bidding process, no portion or part of the stained glass ceiling, the Exedra’s structural or wood elements, the electrical backlighting system, any other parts of the Exedra or its related roof or ceiling, nor any related exterior historic elements, etc. shall be moved, lifted, shifted, tipped, pulled up, unadhered, adjusted, removed from the ceiling or walls, unscrewed, disassembled, or dismantled in any way, either fully or partially, for the purposes of examination during the bidding process.
• 4.5 Hot work, which includes the performance of work with any heat generating equipment including tack irons, heat guns, blow dryers, welding equipment, etc. must be pre-approved and adhere to park hot work and fire watch procedures which are detailed in Addendum C of this solicitation.
• 4.6 The selected vendor shall present a certificate of insurance in the coverage amount of $1 million dollars for work performed during on-site tasks which include, but are not limited to, coverage for when the contractor is completing the installation and de-installation of project equipment and supplies, installing or de-installing the temporary protective measures to secure the envelope of the building, during any of the restoration tasks associated with this project, and to cover any damages accrued to the interior or exterior of the Exedra including its stained glass ceiling panels or to any other historic elements of Glenmont that occurred during the course of the project work. Selected contractor must be present on-site for these activities as well as for all on-site deliveries.
The contractor is required to present a certificate of insurance in the coverage amount of one million dollars, including coverage for when the Contractor is working at the Glenmont estate to complete the on-site work for the project. This includes during times of equipment delivery, equipment installation, and equipment de-installation. This proof of liability insurance must meet these requirements: insurance in the amount of $1 million dollars as well as standard insurance and bonding which covers the company and its employees against neglect, accident, theft and damage with proof of insurance that shall be provided to the
Contracting Officer. Contractor shall carry insurance to cover injuries to his workmen and damage caused by the workmen. The contractor must provide this certificate of insurance https://www.doi.gov/museum/nps-handbooks https://www.doi.gov/museum/nps-handbooks https://www.nps.gov/tps/standards.htm within ten days of the contract award. Contractor shall be responsible for all damages to persons or property that occurs as a result of Contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect work, workers, the public, and property of others.
• 4.7 Selected vendor is responsible for any damage that occurs during the course of their work while working on site, including but not limited to, damage to the historic stained glass ceiling panel in the Glenmont Exedra, damage to the adjacent electrical backlighting system, damage to the roof which supports the Exedra or damage to the Exedra itself, or damage to other historic artifacts, historic steps and patios, historic finishes/surfaces or architectural features such as stained glass and plain glass windows, light fixtures, historic floors ,modern carpeting, or to any building systems or estate areas. This includes during the time of transport, installation, and de-installation of the scaffolding or any other related equipment, during supply delivery, and also during pre-testing or on-site examination which will be used to prepare for the work.
• 4.8 If scaffolding or similar equipment is chosen for this project, contractor shall verify that the scaffold is the correct type for the loads, materials, and employees required for this project (ie designed to accommodate the weight of the workers, supplies, etc.) Footings shall be sound and capable of supporting loads. Equipment components shall be free of bends, cracks, rust, holes, broken welds, or any other damage that could affect the effectiveness of the equipment. These determinations shall be made by a competent person. A competent person is defined as “one who is capable of identifying existing and predictable hazards in the surroundings or working conditions, which are unsanitary, hazardous to employees, and who has authorization to take prompt corrective measures to eliminate them”. Contractor is responsible for following the OSHA scaffold regulations (such as 1926.451) for said equipment and is responsible for proper assembly of equipment used for this project.
5.0 DELIVERY
• 5.1 The work of this section consists of submittal requirements before start of work.
Within ten days of the award and prior to the commencement of on-site work, a
Certificate of Insurance shall be provided to the NPS.
• Pre-start meeting – Within 30 days of award, contractor shall contact COR to discuss project and work schedule. Conservation team shall be required to submit an NPS approved health and safety work plan within 30 days after the award. In this plan the contractor shall address how they shall adhere to any relevant CDC guidance related to COVID-19 in the work place. The manual “Guidance on Preparing Work Places for COVID-19” (OSHA 3990-03 2020) is attached to this solicitation for the bidder’s reference. On-site work shall not proceed until the health and safety work plan is approved. This includes any set up, preliminary investigation, testing, or equipment delivery. Selected contractor must review the statement of work carefully in order to ensure that their submitted plan adheres to the guidelines set forth in the statement of work.
• Within 30 days after the award, contractor shall also be required to submit an NPS approved Protect-In-Place plan detailing how walls and walkways, carpeting, built-in cabinets, floors, historic light fixtures, windows/window frames/doorways, adjacent furniture, architectural features, exterior steps and patios, etc. shall be protected in place by the contractor, identifying specific techniques and materials to be used. This plan must also include a detailed description of the temporary protect in place measures that will be used to secure the envelope of the building during the course of this project. A narrative describing the methods and materials that will be used to secure the envelope of the structure for this project must also be submitted and approved, prior to installation.
The methods and materials chosen must be in accordance with NPS and Department of
Interior Preservation Standards and must be pre-approved by the NPS prior to the commencement of on-site work.
• Additionally, the protect-in-place plan must be NPS reviewed and approved, to ensure its methods and materials are in accordance with the NPS and the Secretary of Interior conservation, preservation, and storage standards. The plan must also meet the requirements set forth in this document. Work shall not proceed until the approved plan is executed.
• 5.2 During work progress the selected vendor shall furnish upon request: Daily report detailing work attempted or accomplished.
• 5.3 Within thirty days of the commencement of on-site work, contractor must submit a detailed treatment proposal, detailing their approach and methodology for this restoration, which must be reviewed and approved by the NPS, prior to this work commencing.
• 5.4 Within 30 days, contractor must also provide a 1-2 page briefing report detailing the temporary protect in place measures that they will use to secure the envelope of the building during the course of the project. This approach must be pre-approved by the NPS, prior to this work commencing
• 5.5 At the end of the project, the selected vendor shall produce a treatment report for this project detailing the work executed which outlines its process and also the materials (with product specs) used to complete the work. It shall include before and after color photos of the work as it progresses as well as when it is completed.
The contractor shall provide these reports to the COR in the following format:
1. two paper copies of each report on 8 1/2 x 11 paper with color photographs, and
2. one electronic copy of each report in PDF format on a flash drive.
• 5.6 Submit all delivery requirements to the Contracting Officer’s Representative
(COR).
6.0 Contractor’s Additional Responsibility
Background materials attached to the scope of work include a copy of Rules for Contractors in Historic Buildings (Attachment B) which identifies specific guidelines that shall be followed by contractors when they work on-site. In general, no food, drink, or smoking is permitted within site work areas. Contractor shall protect-in-place adjacent artifacts in immediate work areas as outlined in their NPS approved plan (including historic floors, staircase components, walls/doorways, stained glass and plain glass windows/window frames, fireplace, light fixtures, etc.), and refrain from storing project equipment on-site during the course of the project with the exception of scaffolding, and is responsible for purchasing all supplies related to the project.
Contractor shall be responsible for removal of all trash debris on a daily basis. Contractor is responsible for trash disposal. No trash can be deposited in park’s dumpster. Due to the historic nature of this work, and its associated safety and security risks, sub-contracting for this project is prohibited.
6.0 GOVERNMENT-FURNISHED PROPERTY
• 6.1 The government shall not provide any supplies, materials, equipment (including scaffolding or transport of scaffolding), or labor for this project. Please take note that the government shall not provide a ladder or a light source for this project which includes during any on-site visits for potential bidders. The government shall not provide any tools to complete the work. A power source shall be provided on-site by the NPS during scheduled work hours.
• 6.2 The contractor is responsible for the cost and acquisition of all project related materials, labor, and services necessary to complete the work of this contract. All related project expenses are the responsibility of the contractor. This includes the cost of supplies/labor to produce the historic paint/finish analyses (interior and exterior) as well as for the related painting of these finishes. The contractor is also responsible for the cost and acquisition of the supplies that will be used for securing the envelope of the building and the other protect in place measures.
• 6.3 The selected vendor is responsible for the cost and acquisition of all project related materials, labor, and services necessary to complete the work of this contract.
Project related expenses of any kind are the responsibility of the contractor.
• 6.4 The government shall provide a water source during the project.
7.0 SECURITY AND SAFETY
Contractors and their team shall be escorted at all times by a National Park Service staff member while they are working on-site. This means that contractors shall not be left unattended, even for short periods of time, and an NPS staff member shall be continually monitoring them as they work, in the immediate vicinity. Please note that there should be no expectation of a contractor working independently, without staff monitoring or staff supervision, in any NPS facility (Refer to the Contractor Monitoring SOP attached to this solicitation for more details). Backpacks, boxes, and bags are subject to inspection.
Contractor team members may be required to wear an identification badge while on-site and use a sign in sheet to log their on-site hours. Selected vendor shall be required to submit a roster supplying the names of participating team members prior to the start of any on-site work. Parking location is subject to security issues and shall be handled on a case by case basis.
Contractor shall be required to submit an NPS approved health and safety work plan. Plan shall detail steps taken by the contractor to avoid damage to Glenmont artifacts and historic features as well as steps taken to reduce the incident of accident or injury during the course of the project to protect personnel as well as well as steps taken to reduce the incident of accident or injury during the course of the project for park staff and volunteers, the contracting team, and the visiting public. Plan shall outline all equipment and materials used for the project and their related safety features or properties as well as any special safety requirements identified on their Safety Data Sheets (SDS sheets shall also be submitted by the contractor with the plan). Please note that the park strictly adheres to guidelines specified in Safety Data Sheets for on-site work as part of the park’s safety protocol. It is important to note that there is limited ventilation inside of Glenmont. Also, any required PPE shall have up-to-date certification and an up-to-date fit test if required for on-site work. Please note that any materials (including dirty rinsing water) used by the contractor cannot be disposed of in the historic sinks inside of Glenmont.
Please note that the materials used by the contractor for this project (including materials used for protecting in place, testing, and conservation work) will also be reviewed in order to ensure that they meet NPS standards for preservation and conservation projects and that the materials are considered to be professional museum grade, in-kind materials (to the greatest extent possible), and are reversible.
In the NPS approved health and safety work plan, the contractor shall also address how they shall adhere to any relevant CDC guidance related to COVID-19 in the work place.