B08_Price_Schedule.pdf

PDF 93 KB Posted

Attached to
Replace Restroom Fixtures, Lake Mead, AZ, NV
Solicitation number
140P8122Q0045
Issued by

View the file

Other files

File Type Posted
B09_Questions_and_Answers_0001.pdf PDF
Sol_140P8122Q0045_Amd_0001.pdf PDF
B08_Release_of_Claims.pdf PDF
B08_Transmittal.pdf PDF
B03_Wage_Determination_Mohave_County.pdf PDF
B03_Wage_Determination_Clark_County.pdf PDF
Sol_140P8122Q0045.pdf PDF
A04_Project_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Price Items – From Page 18 of the Project Specifications, Definition of Contract Price Items, Section 01 27 00-1

Item No.

Schedule of Values

Quantities

Unit

Total ($)

Replace Restroom Fixtures 1 Metered Faucets 81 EA 2 Touchless Faucets 5 EA

3 Manual Flush Valves (Urinals) 28 EA

4 Touchless Flush Valves (Urinals) 2 EA 5 Manual Flush Valves (Water Closets) 133 EA

6 Touchless Flush Valves (Water Closets) 5 EA

7 Remove and Dispose Existing Fixtures 254 EA

TOTAL

Note that this is FOB Destination. This is a firm fixed price requirement. All costs associated to perform the work in accordance with the Project Specifications shall be include. It is anticipated that award will be made as a lump sum.

For price evaluation purposes, price reasonableness will be based on the total sum of item prices 1-7 and requirements in FAR 13.106-2.

File details come from the government source that posted it. Updated .