This is a price schedule template for the procurement of boardwalk materials at Bear River Migratory Bird Refuge in Brigham City, Utah. The document serves as a pricing form for contractors to submit bids for furnishing all labor, materials, and equipment needed to complete boardwalk construction work in accordance with an attached statement of work.
The requirements consist of two line items: West Boardwalk (1 each) and East Boardwalk (1 each). The template includes blank fields for contractors to fill in unit costs and total costs for each boardwalk component, with a total project cost calculation at the bottom. A delivery date field is provided but left blank for contractor completion. The document references an attached statement of work that would contain detailed specifications and requirements for the boardwalk materials and construction, though that statement of work is not included in this price schedule template.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
BEAR RIVER MIGRATORY BIRD REFUGE
BRIGHAM CITY, UTAH
Unit Total
QTY Unit Cost Cost
REQUIREMENTS
1 1 Each
2 1 Each
Total
Furnish all labor, materials, and equipment to complete the following work in accordance with the attached statement of work.
Project Description: Purchase boardwalk materials.
West Boardwalk
East Boardwalk
Delivery Date: ________________________________________________________________________________________________