This is a Statement of Work for Design Services at the Bear River Migratory Bird Refuge for a boardwalk purchase project (Project 23-001D). The contract requires the supply and installation of an integral railing system made of 316 stainless steel components including handrails, posts, cables, support brackets, hardware, and toe boards. The contractor must install two four-foot lockable gates on each side of the west boardwalk to provide staff access to building ground level, with all gate components matching the railing specifications and constructed of 316 stainless steel.
The project also requires a complete LumenPod 16 lighting system by Wagner (or approved equal) installed on both sides of the boardwalk handrail running the full length. The lighting specifications include night sky compliant LED lights pointed toward the ground, 2700K or amber color output with asymmetric beam angle, 24V power requirement with 100W power supply, temperature range from -40°C to +60°C, and IP54 outdoor ratings or better. Materials must be delivered to the employee parking lot east of the building, with the supplier required to identify weights of heavy equipment and preferred lifting solutions prior to delivery. Submittals require plan details for all connections, railing, brackets, anchor attachments, lighting components, toe boards, and gates, with government review completed within 14 days. Points of contact include Refuge Deputy Manager Michael Dunphy (435-720-3766) and Contracting Officer Representative Michael Wandersee (720-813-8224).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Boardwalk Purchase P a g e 1 | 2
STATEMENT OF WORK
Design Services
Bear River Migratory Bird Refuge
Boardwalk Purchase
Project 23-001D
I. PROJECT SCOPE
A. General
Contract shall provide, based on the specifications and drawings:
1. Supply integral railing
• 316 stainless steel handrail, posts, cables, support brackets, and hardware.
• Shall include a toe board.
• Install two four-foot gates on each side of the west boardwalk that is possible to be locked by some mechanism. The gate will allow staff to access the building ground level. The gate shall closely match the railing. All components shall be 316 stainless steel.
2. Lighting system
• The number of lights depends on the illumination. The entire boardwalk sides shall be illuminated.
• Corrosion resistant materials.
• Provide and install a complete LumenPod 16 by Wagner, or approved equal, lighting system on the boardwalk handrail. Include all parts, labor, and materials needed to install a complete working system. The lighting system must run the full length of the boardwalk in the railing on both sides of each boardwalk. The lighting system shall meet the following requirements.
• All lighting shall be night sky compliant with lights pointed towards the ground.
• LED Light source
• Light Output: Standard Output, 2700K or amber in color.
• Beam Angle: Asymmetric
• Listings: ETL Listed for wet or dry locations to UL 1598, UL
8750, and CSA22.2
• Power Requirement: 24V
• Power Supply: 24V/100W
• Temperature Range: -40° C through +60° C
• Product Rating: Interior and Exterior Applications, ETL Class 2 circuit.
• All lighting shall be rated for outdoor use and meet IP54 ratings or better.
Boardwalk Purchase P a g e 2 | 2
The material shall be delivered to the employee parking lot area located directly east of the building.
B. Delivery
1. Station can offload materials after visual inspection of the materials. Prior to delivery, the supplier shall identify the weight of the heavy pieces of equipment and the preferred lifting solutions.
2. The supplier shall identify all materials that need to be stored indoors prior to delivery.
C. Submittal lists
1. Plan details showing all connections
2. Railing
3. Brackets
4. Anchor attachment
5. Lighting
6. Lighting attachment
7. Toe board
8. Gate
IV. SUBMITTALS
A. If alternatives to the means and materials described in these specifications are offered, the submittal must contain a written description of the proposed means and materials comparing all features, options, and codes (if any), in detail. A detailed explanation of why the proposed alternative should be accepted must also be submitted.
B. The Contractor shall submit manufacturer's warranties, guarantees, and certificates for all installed equipment listed on the Project Submittal List.
C. All submittals shall be reviewed within 14 days of submission. If extensions are needed by the Government, the Government will notify within seven days.
D. All construction items shall be submitted for approval.
E. The attached submittal form shall be used.
VI. POINTS OF CONTACT
A. Refuge Deputy Manager
1. Michael Dunphy (435-720-3766)
B. Contracting Officer Representative / Technical Representative
1. Michael Wandersee (720-813-8224)