This Statement of Work (SOW) details design services for a boardwalk purchase project at the Bear River Migratory Bird Refuge (Project 23-001D). The contract requires supplying an integral railing system with 316 stainless steel components, including handrails, posts, cables, support brackets, hardware, and a toe board, along with two four-foot lockable gates on the west boardwalk. Additionally, the project specifies a comprehensive lighting system using LumenPod 16 (or approved equal) LED lighting that must be night sky compliant, with lights pointed downward, operating at 24V, rated for outdoor use, and meeting specific technical requirements such as 2700K color temperature and IP54 ratings.

The document outlines specific delivery instructions, requiring materials to be delivered to the employee parking lot area east of the building, with the supplier responsible for identifying heavy equipment weights and preferred lifting solutions. Submittal requirements include detailed plans for connections, railing, brackets, anchor attachments, lighting, and gates. The project points of contact are Michael Dunphy (Refuge Deputy Manager) and Michael Wandersee (Contracting Officer Representative/Technical Representative). All submittals must be reviewed within 14 days, and contractors must provide comprehensive documentation comparing any proposed alternative materials or methods in detail.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boardwalk Purchase P a g e 1 | 2

STATEMENT OF WORK

Design Services

Bear River Migratory Bird Refuge

Boardwalk Purchase

Project 23-001D

I. PROJECT SCOPE

A. General

Contract shall provide, based on the specifications and drawings:

1. Supply integral railing

• 316 stainless steel handrail, posts, cables, support brackets, and hardware.

• Shall include a toe board.

• Provide two four-foot gates on each side of the west boardwalk that is possible to be locked by some mechanism. The gate will allow staff to access the building ground level. The gate shall closely match the railing. All components shall be 316 stainless steel.

2. Lighting system

• The number of lights depends on the illumination. The entire boardwalk sides shall be illuminated.

• Corrosion resistant materials.

• Provide a complete LumenPod 16 by Wagner, or approved equal, lighting system on the boardwalk handrail. Include all parts, labor, and materials needed to install a complete working system. The lighting system must run the full length of the boardwalk in the railing on both sides of each boardwalk. The lighting system shall meet the following requirements.

• All lighting shall be night sky compliant with lights pointed towards the ground.

• LED Light source

• Light Output: Standard Output, 2700K or amber in color.

• Beam Angle: Asymmetric

• Listings: ETL Listed for wet or dry locations to UL 1598, UL

8750, and CSA22.2

• Power Requirement: 24V

• Power Supply: 24V/100W

• Temperature Range: -40° C through +60° C

• Product Rating: Interior and Exterior Applications, ETL Class 2 circuit.

• All lighting shall be rated for outdoor use and meet IP54 ratings or better.

Boardwalk Purchase P a g e 2 | 2

The material shall be delivered to the employee parking lot area located directly east of the building.

B. Delivery

1. Station can offload materials after visual inspection of the materials. Prior to delivery, the supplier shall identify the weight of the heavy pieces of equipment and the preferred lifting solutions.

2. The supplier shall identify all materials that need to be stored indoors prior to delivery.

C. Submittal lists

1. Plan details showing all connections

2. Railing

3. Brackets

4. Anchor attachment

5. Lighting

6. Lighting attachment

7. Toe board

8. Gate

IV. SUBMITTALS

A. If alternatives to the means and materials described in these specifications are offered, the submittal must contain a written description of the proposed means and materials comparing all features, options, and codes (if any), in detail. A detailed explanation of why the proposed alternative should be accepted must also be submitted.

B. The Contractor shall submit manufacturer's warranties, guarantees, and certificates for all installed equipment listed on the Project Submittal List.

C. All submittals shall be reviewed within 14 days of submission. If extensions are needed by the Government, the Government will notify within seven days.

D. All construction items shall be submitted for approval.

E. The attached submittal form shall be used.

VI. POINTS OF CONTACT

A. Refuge Deputy Manager

1. Michael Dunphy (435-720-3766)

B. Contracting Officer Representative / Technical Representative

1. Michael Wandersee (720-813-8224)

File details come from the government source that posted it. Updated .