B08_Price_Schedule_(1).pdf

PDF 60 KB Posted

Attached to
PARA8230-Z-0028-RPLC CABIN VINYL FLOOR
Solicitation number
140P8122Q0021
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Parashant National Monument

Remove and Replace Vinyl Flooring

CLIN CLIN Description QTY Total ($)

1 All labor, equipment & materials for Moving Furniture and Appliances to Facilitate Removal/Installation of Vinyl

1 EA

2 All labor, equipment & materials for Removal and Disposal of

Two (2) Layers of Existing Sheet Vinyl Flooring

1 EA

3 All labor, equipment & materials for Refastening of Subfloor Joists to Remove Squeaks

1 EA

4 All labor, equipment & materials for Removal and Re-installation of Toilets

1 EA

5 All labor, equipment & materials for Repair of Subfloor Water

Damage in Toilet Areas

1 EA

6 All labor, equipment & materials for Preparation of Substrate for

Application of new Vinyl Tile LVT and Wall Base

1 EA

7 All labor, equipment & materials for Providing and Installing, LVT, Wall Base, Quarter Round, Thresholds, and Transition

Strips.

1 EA

Total CLINs 1-7 $

This is a firm fixed price requirement. All costs associated to perform the work in accordance with the Statement of Work shall be included. It is anticipated that award will be made as a lump sum. For price evaluation purposes, price reasonableness will be based on the total sum of CLIN's

1‐7.

File details come from the government source that posted it. Updated .