This is a Work Statement issued by Grand Teton National Park Service Emergency Services Division for engine replacement services on a 2011 John Deere 644K Loader (VIN: 1DW644K2CBE641000).
The contractor must purchase and install a remanufactured replacement engine that matches or exceeds Original Equipment Manufacturer (OEM) specifications for the identified vehicle. Specific contractor responsibilities include replacing all necessary parts to ensure proper and reliable performance, providing all shop supplies and disposals, and guaranteeing all work and components/parts for two years from completion and pick-up date. The contractor must ensure all vehicle systems and accessories function properly, with particular attention to the correct operation of additional accessories and the patient/medical box. The equipment installation and commissioning must be completed within 60 days after contract award. Grand Teton National Park assumes all responsibility for picking up or transporting the vehicle upon work completion, with no delivery requirements imposed on the contractor. The contracting location is Grand Teton National Park, P.O. Box 170, Moose, Wyoming 83012-0170.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grand Teton National Park Work Statement Replacement Engine for I-513781; 2011 John Deere 644K Loader; VIN: 1DW644K2CBE641000
1. Introduction & Contract Type o Grand Teton National Park Service Emergency Services Division is in need of having a key piece of equipment repaired as soon as possible.
o Purchase and installation of a replacement engine to match or exceed the Original Equipment Manufacturer (OWM) specifications for VIN: 2011 John Deere 644K Loader; VIN: 1DW644K2CBE641000 o
2. Specific Tasks or Requirements o Contractor Shall:
Replace engine (with remanufactured).
Replace all necessary parts to ensure proper and reliable performance.
Provide all necessary shop supplies and disposals.
Guarantee all work and components/parts for a period of 2 years (from completion and pick-up date).
Ensure that all vehicle systems and accessories are functioning properly.
Specific attention must be paid to the correct operation of the additional accessory and/or patient/medical box.
3. Period of Performance o The Equipment installation and commissioning period of performance will be completed 60 days after contract award.
4. Delivery Requirements o None, Grand Teton National Park assumes all responsibility to pick up or otherwise transport vehicle when work is complete.
United States Department of the Interior
NATIONAL PARK SERVICE
GRAND TETON NATIONAL PARK
P.O. BOX 170
MOOSE, WY 83012-0170