B08 Brand Name justification Attachement 2 PMIS309889 SOLE SOURCE CS signed.pdf
PDF 237 KB Posted
- Solicitation number
- 140P8120Q0070
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8120Q0070_Amd_0001.pdf | ||
| A04 Specifications 3099889.pdf | ||
| sign locations and specs.docx | DOCX document | |
| Wage Determinations Clark County NV.pdf | ||
| 140P8120Q0070 Supply Clauses.docx | DOCX document | |
| Sol_140P8120Q0070.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
JUSTIFICATION & APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
for SIMPLIFIED ACQUISITIONS OVER $3,500 ($2,000/$2500 for Construction/Services) AND
UP TO $150,000
(See FAR 13.106-1)
Date: ___ 29 April 2020 __________ PR Number: __309889___________
1. Nature and/or description of the item/service being procured and its intended use (include the anticipated cost):
Solar powered flashing caution signs furnished and installed approximately $116,000.
2. Sole Source Justification rationale (Check one and explain below):
_____ Only one responsible source.
_____ Urgent and compelling circumstances exist. Include critical delivery or performance dates, and when you became aware of the requirement. Provide a specific statement of the impact on Government operations, financial or otherwise, if the required delivery or performance dates are not met.
__X__ Other
Explain:
We already have existing signs so:
Single source, for uniformity, ease of maintenance, software upgrades, warranties, spare parts and usability for both the LE Rangers and maintenance.
Existing systems need to be updated (amongst other things for uniformity). Cost savings with multiple units from the same source.
There would be a compatibility issue. Different providers have different in house software that run their signs. So we would have two that would always be out of sync with the six new ones. Maintenance would have to maintain two different sets of spare parts. LE and Maintenance would have to learn and maintain two sets of O&Ms.
3. Market Research. Please explain the results or why one was not performed. State whether any other offers were received or anyone expressed interest:
Prices are very competitive so we would not really see a big difference in price so no real cost savings with a best value determination. Going with another vendor/manufacturer, guaranteed to cause us lots of headaches if we have two systems to maintain. Not to mention user confusion as to what sign is where and how one functions differently from another....and if there was a legal case possibly questioning the calibrations, software... different systems, human factor, chances very high for confusion and possible errors.
ATTACHMENT 2
JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
for SIMPLIFIED ACQUISITIONS OVER $3,000 ($2,000/$2500 for Construction/Services AND UP
TO $150,000
(See FAR 13.106-1)
PR Number ___309880____________
4. If this is a determination for sole source, the contracting officer certifies:
a. Only one source is available, or urgent and compelling circumstances exist.
b. The anticipated price will be determined fair and reasonable using the price analysis techniques described in FAR Part 13.106-3(a).
(Signature) _______________________________________ (Date)__________________________
Type or Print Name: __________________________________________ Title:
(Signature) _______________________________________ (Date) ___________________________
Type or Print Name: __________________________________________ Contracting Officer
Over $25,000:(if applicable)
(Signature) _______________________________________ (Date) ______________________
Warranted Individual 1 Level Above Contracting Officer
Claudina Brizuela Civil Engineer
29 April 2020
07/20/2020
| 2020-07-20T10:17:08-0700 | |
| JAMES READ |