B08_Bid_Shedule.pdf
PDF 102 KB Posted
- Attached to
- Well Redevelopment & Decommissioning - VT
- Solicitation number
- 140FC225R0002
About this file
This document is a Bid Schedule for the Well Restoration and Decommissioning project at the White River National Fish Hatchery in Bethel, VT. The government is soliciting quotes for the inspection, reporting, and restoration of wells 1, 3, and 4, the decommissioning of well 2, and the evaluation of a spare pump and motor. Bidders must provide lump sum pricing for each of these base bid items. The document also includes a pricing breakout template for well components that may be required after award. Contractors are required to provide bonds if the construction cost exceeds certain thresholds, as well as proof of insurance. The related federal contract opportunity is Solicitation Number 140FC225R0002, issued by the Department of the Interior Fish and Wildlife Service, for Well Redevelopment & Decommissioning in Vermont.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Provisions___Clauses_0001.pdf | ||
| Sol_140FC225R0002_Amd_0001.pdf | ||
| Photos.pdf | ||
| Past_Performance_Survey.pdf | ||
| A04_Scope_current.pdf | ||
| Sol_140FC225R0002.pdf | ||
| B03_Wages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
WELL RESTORATION and DECOMMISSIONING
White River National Fish Hatchery
Bethel, VT
BEFORE SUBMITTING QUOTES, bidders should carefully read Government
Standard Form(s), general provisions and clauses, Wage Rates, Scope of Work, and all other Solicitation attachments. Attending a scheduled site visit is highly encouraged.
Award of the contract will be made to that responsible bidder, whose proposal, conforming to the Request for Proposal, is most advantageous to the
Government, on the basis of best value for base items described within the scope of work.
Bidders must quote on all items. Incomplete quotes will not be accepted.
ITEM ESTIMATED
NO. DESCRIPTION QUANTITY AND UNIT AMOUNT
BASE BID ITEMS
1. Inspect, report condition, Lump Sum $__________________ and provide plan for restoration of wells 1, 3, and 4
2. Well Restoration Lump Sum $__________________ wells 1, 3, and 4
3. Decommission Well 2 Lump Sum $__________________
4. Evaluate
Spare pump Lump Sum $__________________ and motor
TOTAL of Base Bid Items $___________________
Proposal Breakout of well components – used in the event that additional
Materials/Services are needed after Award. Please add breakout of all additional items/value, other than below, used to determine lump sum amount(s) as appropriate. Include business letterhead document to provide breakout if convenient.
Well column pipe – per foot $______________ Drive Controller $_________________
Casing – per foot $______________
Shaft – per foot $______________ List related electronics $_____________
Stainless Steal Screen $______________ $_____________
Well Motor – indicate model $______________ $_____________
$______________ List other materials/equipment
Pump – indicate model $______________ $_____________
Spider bearings $______________
Proposal Breakout of Treatment –
Treatment and Disinfection procedures proposed and included in item2 Lump Sum amount $_________________________
This breakout amount will be used to determine the best treatment based on evaluation and analysis.
Contractor shall provide details on what treatment is included in their bid.
If your construction costs are more than $30,000.00, you are required to furnish in duplicate, within 14 days, a Payment Bond (Standard Form 25a) of 100 percent, with surety of sureties acceptable to the
Government. If your construction costs are more than $150,000.00, you are required to furnish in duplicate, within 14 days, Performance (Standard Form 25) and Payment Bonds (Standard Form 25a) of
100 percent, with surety of sureties acceptable to the Government. These forms are available at https://www.gsa.gov/reference/forms . You are also required to furnish proof of insurance, no matter what your construction cost are, by completing/returning the “Certificate of Compliance with Insurance
Requirements” form within five (5) calendar days after receipt of this letter.
Vendor Name_____________________________________________________________
By _____________________________________________________________
Signature Email
Address____________________________________________________________
Date _____________________ SAM UEI number __________________________
File details come from the government source that posted it. Updated .