This document contains the technical specifications for a contract to redevelop and decommission wells at the U.S. Fish and Wildlife Service White River National Fish Hatchery in Vermont. The work consists of well rehabilitation of Wells #1, #3, and #4 and decommissioning of Well #2. The contract is anticipated to be a firm-fixed price award. Key details include:
The well system consists of four wells with varying flow rates and pump specifications. The contractor will be required to assess the existing wells, restore water flow and quality, and reconnect all electrical, control, and utility components. Well #2 will be decommissioned according to state regulations. The contractor must also evaluate the condition of spare pumps and motors stored onsite. Work must be sequenced to ensure at least one well remains operational at all times to support hatchery operations. Defined project submittals include the construction schedule, well logs, pump test data, and a written technical approach. The work is subject to inspection and acceptance by the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Provisions___Clauses_0001.pdf | ||
| Sol_140FC225R0002_Amd_0001.pdf | ||
| Photos.pdf | ||
| Past_Performance_Survey.pdf | ||
| B08_Bid_Shedule.pdf | ||
| Sol_140FC225R0002.pdf | ||
| B03_Wages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Fish and Wildlife Service – White River N.F.H.
Technical Specifications – Well Redevelopment and Well Decommissioning
TECHNICAL SPECIFICATIONS
Well Redevelopment and Decommissioning
PART 1 - PROJECT OVERVIEW
A. NOTICES
1. Project Information
Project Title: Well Redevelopment and Decommissioning
Location: U.S. Fish & Wildlife Service
White River National Fish Hatchery
2086 River Street
Bethel, VT 05032-9130
B. INTRODUCTION
1. Contract Work:
This Contract is for well redevelopment and well decommissioning services. The work consists of well rehabilitation of Wells #1, #3, and #4; and decommissioning of Well #2.
The Contractor shall comply with all industry standard best practices and materials.
2. Hatchery Operations:
Hatchery operations will continue during the performance of this contract. The Contracting Officer
Representative (COR) may require the Contractor to schedule work during a time which would least interfere with the Hatchery operations.
Due to water conditions for fish production operations, redevelopment of Well #1 and # 3 must be done in the time period of February 1 to the third week of March. During this time Well # 3 can be down without affecting fish rearing operations. The Contractor shall coordinate with the Program
Manager and mutually decide on the best days during this time frame to perform the work.
The Contractor shall exercise care and shall perform his work diligently. If it becomes necessary to interrupt any function of the Hatchery, the Contractor shall notify the Program Manager and shall not proceed in such interruptions until such time as the Program Manager makes provisions for and approves such operations. No work shall be performed which could contaminate the water supply or cause harm or death to the existing fish population.
Well #1 and #3 shall not be simultaneously placed out of operation. One of these wells must continue to supply water to the hatchery while the other well is being redeveloped. Redevelopment must be performed and completed one well at a time. Do not redevelop more than one well at the same time.
3. Anticipated Award Period / Contract Type:
The Government anticipates a firm-fixed priced award of this contract.
PART 2 – SCOPE OF SERVICES
A.
1. SCOPE
Existing Well Information:
• The geology of the White River National Fish Hatchery site is composed primarily of sand and gravel. A thin layer of topsoil is followed by sand, gravel and boulders down to about thirty feet below ground surface. The next ten feet is fine to medium water bearing sand with silt.
The principal aquifer lies in a band of coarse sand and gravel which lies between 40 and 50 feet below surface. Between the 50-foot level and bedrock at 60 feet is broken stone, silt, and sand.
• The well system consists of one well (well #1) approximately 133 yards from the White River, and three wells (wells #2, #3, and #4) located adjacent to the river. Well #4 was constructed in
2006. Wells #2, #3, and #4 are influenced by surface water as indicated by their temperature cycles, which follow seasonal temperature changes, but highs and lows are less extreme and delayed in timing from those of surface water. A site plan of the well locations is provided in
Appendix 1, and site photos in Appendix 2.
• Wells #1, #2, and #3 are designed as 36-inch diameter excavation and gravel-pack incorporated with a
24-inch inner casing and stainless-steel screen. Ten feet of screen is used. A typical cross section drawing of the well design is included in Appendix 3.
• The following table summarizes the four wells at White River National Fish Hatchery under this contract:
Source Flow Delivery Pump
Well #1 1,200 gpm 40 HP Submersible*
Well #2 350 gpm 15 HP Submersible
Well #3 1,500 gpm 40 HP Submersible*
Well #4 400 gpm 40 HP Submersible*
*The flow delivery is the amount the wells are producing presently. The submersible pumps for wells #1, #3, and #4 are operated with a variable frequency drive controller.
• The submersible pumps within wells #1 and #3 are Gould model 14RJMC, 1 stage, equipped with
Hitachi 40 horsepower, 3 phase, 460-volt motors. Each pump is rated to deliver approximately 1,200 gallons per minute against a total dynamic head of 80 feet at an efficiency of approximately 70 percent.
The submersible pump within wells #4 is Christensen model 12RJHC, 2 stage, equipped with Hitachi
40 horsepower, 3 phase, 460-volt motors. The Well #4 pump is rated to deliver 1,200 gpm against a total dynamic head of 100 feet at an efficiency of 83%. Well #4 has not been operated for years, and the status of the drive controllers, and other electronics is unknown. The pumps are connected to a 10" discharge.
Well Redevelopment and Testing (Base Bid Item):
The Contractor shall provide including but not limited to:
• Supply all labor, equipment, materials, chemicals, and supplies necessary to clean, and redevelop each of the existing wells.
• Assess the existing wells: The Contractor shall inspect and document the conditions of the wells.
As a minimum, this proposal shall evaluate the casings and well screens for damage and for the presence of mechanical blockage, chemical encrustation, and bacteriological plugging. Video of the wells should be conducted before and after redevelopment along with a written description of the condition of each well including, but not limited to the condition of the column pipe, well casing, and well screen. Additionally, the Contractor shall provide the Government with written assessment data and a tailored plan for addressing findings from the assessment, and for restoring the wells to design depth and performance.
• Restore water flow volume to original gallons per minute as much as possible, and of quality and clarity. Redevelopment shall include restoring design flow volume and includes making the wells clean to their original design depth until no traces of gravel, sand, silt, clay or chemicals remain in the pump discharge water. Contractor is responsible for all costs of laboratory testing.
• Evaluate condition of well components: Remove existing well motors, pumps, shafts, and column pipes, as needed, to assess well and component condition for the wells. Above-ground components shall, at a minimum, shall have corrosion and loose paint removed, and will be repainted per industry standard. If, subsequent to Award, the Contractor determines more than the previously quoted work will be required to fully restore the well components, they shall provide a technical and price proposal for Government consideration. (Well column pipe, shafts, well motors, pumps, or spider bearings may be replaced at this time if required.) Should the Government accept the
Contractor’s proposal, a contract modification will be issued authorizing the Contractor to perform the additional work, beyond the repair work allowance. Proposal submitted for modification should reflect suggested item pricing within the Base proposal as much as possible.
• Well Commissioning: Reconnect all electrical, control, and utilities. In conjunction with hatchery personnel, perform function testing. If, subsequent to Award, the Contractor determines more than the previously quoted work will be required to fully restore the wells, they shall provide a technical and price proposal for Government consideration. Should the Government accept the Contractor’s proposal, a contract modification will be issued authorizing the Contractor to perform the additional work, beyond the repair work allowance. Proposal submitted for modification should reflect suggested item pricing within the Base proposal as much as possible.
• For the purpose of the Contractor’s proposal, assume a nominal amount of both mechanical and chemical processes will be required to remove blockage and restore the aquifer’s ability to provide design capacity and water quality. The Contractor shall provide details on what treatment is included in their bid. However, actual selection for treatment and disinfection shall be based on well evaluation and analysis of the water samples. If, subsequent to Award, the Contractor determines more than the previously quoted work will be required to fully restore the wells, they shall provide a technical and price proposal for Government consideration. Should the Government accept the Contractor’s proposal, a contract modification will be issued authorizing the Contractor to perform the additional treatment. Proposal submitted for modification should reflect suggested item pricing within the Base proposal as much as possible.
Well Decommissioning – Well #2:
The Contractor shall provide including but not limited to:
• Supply all labor, equipment, materials, chemicals, and supplies necessary to decommission
Well # 2 as per State of Vermont regulations and industry standard.
• Decommissioning can proceed any time after Award and concurrently while other wells are being redeveloped.
• The existing well pump and motor for Well #2 shall be disposed of.
Evaluate Spare Pumps and Motors:
The Contractor shall provide including but not limited to:
• Evaluate the condition and working order of the spare pumps and motors in storage at the hatchery.
Well # 1 and #3 spare parts were repaired and put on the shelf in 2016. Well # 4 spare parts were put on the shelf in 2006 or 2007.
• If any of the spare motors or pumps need repairs to become operational, please provide the government with an estimate for repairs. Proposal submitted for modification should reflect suggested item pricing within the Base proposal as much as possible.
Well Redevelopment Sequence and Schedule:
The Contractor shall provide including but not limited to:
1. Evaluate condition of the spare pumps, and motors stored at the hatchery. There are spare parts from previous well redevelopment projects, at the time of the redevelopments these motors were inspected and repaired and in good working condition. The parts were stored on station in case a well went down.
2. Redevelop Well #4. Well #4 has not been operated for years, and the status of the drive controllers, and other electronics is unknown.
3. Redevelop Well #1. Well #1 should be back online by the end of February due to the different temperature regimes of Well #1 and Well #3.
4. Redevelop Well # 3. Once Well #1 is back online the hatchery staff will need a few days to temper the water before Well # 3 is turned off. They will mix the water from Wells #1 and #3 as the temperature between the wells can be as much as a 10-degree differential.
5. Decommission Well #2. Decommission well #2 following State of Vermont regulations and industry standards.
At no time during the well redevelopment project shall there be more than one well off and being redeveloped at a time.
2. ADMINISTRATIVE REQUIREMENTS
1. Environmental Protection. All work shall be accomplished in such a manner that all waste materials, pollutants, and potential pollutants shall be completely disposed of in accordance with all applicable
Federal, State, and local regulations. At no time shall operations be attempted or permitted where or when such operations present a possibility of fouling the hatchery facility with waste materials, pollutants, or potential pollutants.
2. Work Site Safety. The Contractor shall be solely responsible for ensuring that all their on-site activities and equipment conform fully to all standards of the Department of Labor, Occupational Safety and Health
Administration (OSHA) 29 CFR 1926 and 1910. Additionally, the contractor shall adhere to all applicable
Federal standards, nationally recognized building codes, and nationally recognized safety codes such as the
National Fire Protection Association (NFPA), and other nationally recognized consensus standards. The
NFPA 101, Life Safety Code, will be used as the minimum criteria for life-safety features, and the NFPA
70, National Electrical Code (NEC), will be used as the minimum criteria for electrical installation.
The Contractor shall notify the Contracting Officer of all accidents that have occurred at the project site.
The Contractor shall submit an accident report to the Contracting Officer for any accident that involves lost time by the injured employee regardless of whether professional medical treatment was required or not.
3. Inadvertent Discovery. In the unlikely event an inadvertent discovery of cultural material is discovered during the project all work in the vicinity will cease and Shane Hanlon, Hatchery Manager, and the
Contracting Officer Christine Beauregard will be contacted immediately. Hatchery staff will take appropriate action to identify and determine significance of find before work in the area can continue.
Work outside the immediate area can continue as planned. Cultural material includes but not limited to;
glass, ceramic, bone, brick, etc.
4. PROJECT SUBMITTALS
Well Redevelopment:
The following information is required from the Contractor, but not limited to:
• Construction Schedule: Submit the proposed work schedule for approval within 15 days after award of contract prior to any work being started. Itemize each principal component/phase of work and the calendar days of anticipated performance. Submit a revised schedule any time the actual work progress lags the scheduled time by more than 5 calendar days.
• Well logs
• Pump test data (before and after redevelopment)
• Flow rate data (before and after redevelopment)
• Daily records
• Video inspection log (before and after redevelopment)
• Written technical approach for well rehabilitation and redevelopment.
• Itemized assessment of all well pump material removed from the existing wells, and a fee proposal for performing any recommended additional work. Should the Government accept the
Contractor’s proposal, a contract modification will be issued authorizing the Contractor to perform the additional repair work.
5. INSPECTIONS AND ACCEPTANCE
The services/work performed under this contract are subject to observation and review by the USFWS.
6. SITE VISITS
It is highly recommended that prospective bidders attend the scheduled site visit before bidding.
APPENDIX 1:
White River N.F.H.
Site Plan: Well Location
\. 1
50'
I
I I
I I
WHITE RIVER
Well No. 4
WHITE
RIVER
. , I
·r1--.. ,.,,,,.-. �--
1---
_,1-
'-1, '--1---1'---i SETTLING POND c1 C6 SITE PLAN
EXIST CIRCULAR
CONC TANKS, TYP
I 1 HATCHERY SITE
l ��c-c, I
�5 SOUTHEAST
C1CJ
OVERALL HATCHERY SITE PLANI
SCALE: 1 • .. 50'
MAGNETIC
NORTH
OBSERVED
GRID
NORTH
TO BETHEl
GRAPHIC SCALE
Na. lt[VJSIONS•
1M41TI. Rtl/ER NA'TK'NAL FISH H"-TCHE:RY
WAT[R R[US'£/TR(AfMENT FAct..lTY
1 "-50' ....- -
100' 150'
OVERALL HATCHERY SITE PLAN
20003.16-10,cjwg 8-21-02 1•57•43 PM EST
CHECK GRAPHIC SCALE BEFORE USING
0\l{i NC), SHEET 2 OF 7
APPENDIX 2:
Photographs
Photo #2: View of Well #1
Photo #1: View of Well #1 vault.
Photo #4: View of Well #3.
Photo #3: View of Well #3 vault.
Photo #4: View of Well #4.
Photo #5: View of Well #4.
APPENDIX 3:
Cross Section – Well Design
7' ptNBn11w,J
/krv() IJNP
/'3tJ 1./L bl' /l/
A
I
.f//lZ)tr' tl'Z nV_y
PIAlf' -ro l /
7,t!?,, c.•/l..<iv/:'t.-
Js ,{1
!it
S7> ,1
/'-A,£¥).I I) r--1
1$ h. G VJ >-J
/J'N'O
I
I
I I
I
'I I - - -
- I j
I
I
I I
".I
C/J
Grt vliL ,/);..Jl) - - - - .2 .'')Lio' 1.,o J l Ntots..>ST 'Nt...f.v'
Jp J
- i.
$E€L.1cl't£E'>J
C,,.J i-:-)J
GI
,.1/L"T r - I -·
I I
/(_() l k- • i t,.JJ/1 -r.i /ti v$,t /,,hrrcll " 'I erTJJet, vG,t""1tJNT
?>tlPtVlP IL Pe.llGM•
0ArE1.1"1& 1s:' • . Icl:i_ffrr_
LAYNE·N::1N ::.;\GLAND O.
BRANCH OF LA-:'N • NEW YORK CO., INC.
File details come from the government source that posted it. Updated .