B08_Bid_Schedule_Boat_Ramps_Kirwin.pdf
PDF 117 KB Posted
- Attached to
- Boat Ramp Replacement Project at Kirwin NWR
- Solicitation number
- 140FGA26R0023
About this file
This is a Bid Schedule for a construction project involving multiple boat ramp replacements at Kirwin National Wildlife Refuge in Kirwin, Kansas. The project scope includes demolition of three deteriorated concrete boat ramps, replacement with two double-lane boat ramps, demolition of concrete boat dock (bulkhead) structures, and extension of wave breaks at the boat ramps.
The bid schedule is organized into two sections: a cost breakdown by division and contract line items. Division 02 (Existing Conditions) covers demolition work for the South Shore North Boat Ramp, South Shore South Boat Ramp, North Shore Boat Ramp, and South Shore Concrete Dock. Division 03 (Concrete) covers new concrete work for the South Shore Boat Ramp and North Shore Boat Ramp. The schedule requires bidders to provide costs for materials, labor, and equipment, with separate line items for base costs, prime overhead and profit, and subcontractor overhead and profit. Contract Line Items 1 through 4 correspond to the four specific project components, with a total line item cost to be calculated. All pricing fields are blank templates awaiting bidder responses.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
Multiple Boat Ramp Replacement
Kirwin National Wildlife Refuge
Kirwin, KS
PROJECT DESCRIPTION:
SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT
Division 02 Existing Conditions
South Shore North Boat Ramp $
South Shore South Boat Ramp $
North Shore Boat Ramp $
South Shore Concrete Dock $
Division 03 Concrete
South Shore Boat Ramp $
North Shore Boat Ramp $
BASE TOTAL $
PRIME OVERHEAD AND PROFIT $ -
SUBCONTRACTOR OVERHEAD & PROFIT $ -
BASE TOTAL PLUS OVERHEAD AND PROFIT $
The purpose of this project is to replace three (3) deteriorated concrete boat ramps at Kirwin NWR and extend the wave breaks at both ramps. The work will include but is not limited to: demolition of three boat ramps, replacement of boat ramps with two double lane boat ramps, demolition of concrete boat dock (bulkhead) structures, and extending wave breaks at the boat ramps.
Bid Schedule
Multiple Boat Ramp Replacement
Kirwin National Wildlife Refuge
Kirwin, KS
CONTRACT LINE ITEM 1: South Shore North Boat Ramp $
CONTRACT LINE ITEM 2: South Shore South Boat Ramp $
CONTRACT LINE ITEM 3: North Shore Boat Ramp $
CONTRACT LINE ITEM 4: South Shore Concrete Boat Dock $
TOTAL LINE ITEM COST $
Bid Schedule
File details come from the government source that posted it. Updated .