This is a Bid Schedule for a construction project involving multiple boat ramp replacements at Kirwin National Wildlife Refuge in Kirwin, Kansas. The project scope includes demolition of three deteriorated concrete boat ramps, replacement with two double-lane boat ramps, demolition of concrete boat dock (bulkhead) structures, and extension of wave breaks at the boat ramps.

The bid schedule is organized into two sections: a cost breakdown by division and contract line items. Division 02 (Existing Conditions) covers demolition work for the South Shore North Boat Ramp, South Shore South Boat Ramp, North Shore Boat Ramp, and South Shore Concrete Dock. Division 03 (Concrete) covers new concrete work for the South Shore Boat Ramp and North Shore Boat Ramp. The schedule requires bidders to provide costs for materials, labor, and equipment, with separate line items for base costs, prime overhead and profit, and subcontractor overhead and profit. Contract Line Items 1 through 4 correspond to the four specific project components, with a total line item cost to be calculated. All pricing fields are blank templates awaiting bidder responses.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

Multiple Boat Ramp Replacement

Kirwin National Wildlife Refuge

Kirwin, KS

PROJECT DESCRIPTION:

SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT

Division 02 Existing Conditions

South Shore North Boat Ramp $

South Shore South Boat Ramp $

North Shore Boat Ramp $

South Shore Concrete Dock $

Division 03 Concrete

South Shore Boat Ramp $

North Shore Boat Ramp $

BASE TOTAL $

PRIME OVERHEAD AND PROFIT $ -

SUBCONTRACTOR OVERHEAD & PROFIT $ -

BASE TOTAL PLUS OVERHEAD AND PROFIT $

The purpose of this project is to replace three (3) deteriorated concrete boat ramps at Kirwin NWR and extend the wave breaks at both ramps. The work will include but is not limited to: demolition of three boat ramps, replacement of boat ramps with two double lane boat ramps, demolition of concrete boat dock (bulkhead) structures, and extending wave breaks at the boat ramps.

Bid Schedule

Multiple Boat Ramp Replacement

Kirwin National Wildlife Refuge

Kirwin, KS

CONTRACT LINE ITEM 1: South Shore North Boat Ramp $

CONTRACT LINE ITEM 2: South Shore South Boat Ramp $

CONTRACT LINE ITEM 3: North Shore Boat Ramp $

CONTRACT LINE ITEM 4: South Shore Concrete Boat Dock $

TOTAL LINE ITEM COST $

Bid Schedule

File details come from the government source that posted it. Updated .