B08_Attch_5_Project_Experience.docx
DOCX document 44 KB Posted
- Solicitation number
- 140P2026R0003
About this file
This is a Project Experience Questionnaire template that offerors must complete as part of their submission to solicitation 140P2026R0003 for the replacement of dilapidated docks and fuel system at Seven Bays Marina in Lake Roosevelt National Recreation Area, Lincoln County, Washington. The questionnaire requires offerors to document relevant past project experience that demonstrates capability to perform the proposed work.
Respondents must provide detailed information for each referenced project, including project title, location, description, owner, and points of contact. The questionnaire requires offerors to list all contractors (prime and subcontractors) performing work on the referenced project, along with their specific roles, trade assignments, contract prices (both original and final), and performance periods in calendar days (original and final schedules). Offerors must then address seven evaluation questions: describing the work performed; identifying which Project Experience elements from solicitation section L are addressed; explaining any price and schedule changes with supporting rationale; detailing problems encountered and their resolutions; describing successful means and methods and their applicability to the proposed project; and providing any additional relevant project information. The questionnaire template can be expanded across multiple pages as needed to adequately address each question and accommodate the quantity of projects required by the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Experience Questionnaire Solicitation: 140P2026R0003
Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).
| Offeror |
| Company Name |
REFERENCED PROJECT INFORMATION
| Project Title |
| Title |
| Project Location |
| City, State |
| Brief Project Description |
| Description |
| Project Owner |
| Company Name |
| POC: |
| First & Last Name |
| Phone: |
| (XXX) XXX-XXXX |
CONTRACTOR LIST
List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.
| Contractor Name |
| Role on Referenced Project |
(Prime or Sub)
| Trade |
| Price |
(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)
| Original |
| Final |
| Original |
| Final |
| Sparky’s Electrical Company |
| Prime |
| Prime |
| $XXX,XXX |
| $X,XXX,XXX |
| XX |
| XX |
| ABC Plumbing & Heating, Co |
| Subcontractor |
| Plumbing & Mechanical |
| $X,XXX,XXX |
| $X,XXX,XXX |
| XXX |
| XXX |
Subcontractor
PROJECT EXPERIENCE QUESTIONS
1. Describe the project work performed by all contractors listed above.
Response
2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.
Response
3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.
Response
4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.
Response
5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.
Response
6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?
Response
7. Provide any other additional project information you believe should be presented.
Response