The attached document is a construction and waste management tracking sheet template for tracking materials disposed of or diverted from a landfill during a construction project. It includes tables to track the material description, disposal date, whether it was diverted from the landfill and by what method, the hauler or destination, volume in cubic feet, and weight in tons for materials such as shingles, metal, aluminum, lumber, copper, and other. It also includes fields to calculate the total diverted, total not diverted, total of all waste, and percentage diversion rate for the project.

The related federal contract opportunity is to replace the roofs of Cabins 4, 5, and the Cooks Quarters at Prince William Forest Park for the Department of the Interior National Park Service. The solicitation number provided is 140P3022R0029.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction and Waste Tracking Sheet –

Material Description Disposal date

Diverted from Landfill or incinerator?

(Y/N)

Diversion method (Recycled, Salvaged, etc.)

Hauler or Destination (submit receipts)

Volume (in cubic feet)

Weight (in tons)

Shingles Metal Aluminum Lumber Recycle Copper

Other:

Total Diverted Total Not Diverted

Total All Waste = Total Diverted + Total Not Diverted % Diversion Rate* = Total Diverted/Total All Waste

ADP5EA1.tmp
Article I. DESCRIPTION OF CONSTRUCTION & DEMOLITION WASTE MANAGEMENT PLAN
Section 1.01 General Overview and Purpose
Section 1.02 Site Description
Article II. IDENTIFY TARGET MATERIALS
Section 2.01 Analysis of Job Site Waste Generated
Article III. MEANS AND METHODS TO ACHIEVE 50% DIVERSION
Section 3.01 Waste Reduction
Section 3.02 Separation and Delivery
Section 3.03 On-Site Waste Log
Section 3.04 Location of Recycle Area
Article IV. SUBCONTRACTORS REQUIREMENTS ORIENTATION
Section 4.01 Preconstruction Meetings
Section 4.02 Task Requirements/Documentation
Section 4.03 Clean Up
Article V. MONITORING PROGRESS
Section 5.01 Record Keeping
Section 5.02 Reports