B08_Attachment_7_Room_Schedule_for_Thomas_House_Painting.docx
DOCX document 14 KB Posted
- Attached to
- MONO - WORTHINGTON/THOMAS PAINTING Federal contract opportunity
- Solicitation number
- 140P3023R0004
About this file
This room schedule outlines the painting scope of work for the interior of the Thomas House. It provides instructions for each room indicating whether all currently painted surfaces should be painted or if certain areas should be excluded. Specific notes are included for some rooms regarding historic elements, electrical closets, and items attached to walls. The related federal contract opportunity is for exterior paint removal on the Worthington House and interior painting of the Thomas House. The solicitation was issued by the National Park Service National Office within the Department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P3023R0004_Amd_0001.pdf | ||
| B09_Amendment_1_Q_A_MONO_FY23_Remove_Paint_Worthington_Paint_Thomas_RFI_Cutoff_2_10_23_Answers_0001.docx | DOCX document | |
| B09_Amendment_1_DOL_WD_FredCo_Bldg_MD20230042_2_3_23_0001.pdf | ||
| B08_Attachment_12_Subcontracting_Percentage_Worksheet.docx | DOCX document | |
| B08_Attachment_6_FACTS_Sheet.pdf | ||
| B08_Attachment_4_Worthington_House_Lead_Report.pdf | ||
| B08_Attachment_3_Thomas_House_Lead_Report.pdf | ||
| B08_Attachment_13_CAAC_Letter_2020-04_-_05_01_20.pdf | ||
| B08_Attachment_10_Worthington_House_Drawings.pdf | ||
| B08_Attachment_9_Site_Visit_Vendor_List.pdf | ||
| B08_Attachment_5_J_A_Brand_Name_Justification_Redacted.pdf | ||
| Sol_140P3023R0004.pdf | ||
| B08_Attachment_11_Thomas_House_Drawings.pdf | ||
| B08_Attachment_8_Site_Visit_RFIs.docx | DOCX document | |
| B08_Attachment_1_DOL_WD_FredCo_Bldg_MD20230042_1_13_23.pdf | ||
| B08_Attachment_2_Daily_Log.doc | DOC document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Room Schedule for Thomas House Painting:
*In reference to Square Foot Plan of Thomas House, in general if a surface is already painted it will be apart of this scope of work.
First Floor:
100: All surfaces that are currently painted 101: All surfaces that are currently paint (including columns) 101A: All surfaces that are currently painted 101B: All surfaces that are currently painted 102: All surfaces that are currently painted CB102A-102F: All surfaces that are currently painted 103: All surfaces currently painted CB103A-103B: Do not paint 104: Special Paint Area, mineral paint on all vertical walls, except behind items that are bolted, nailed, screwed etc. into the wall. All other areas painted per SOW.
105: All surfaces currently painted areas, including storage closet 106: Foyer/Telecom Room: All surfaces that are currently painted. This is our internet, fire system, telecoms room so extreme caution is need working in this room and moving around wires. Follow SOW guidelines on items bolted, nailed, or screwed into the wall.
ST101: All surfaces that are currently painted. DO NOT need to remove the carpet stair runner, paint around stair runner ST102: All surfaces that are currently painted CL100: All surface that are currently painted Second Floor:
200: All surface that are currently painted 201: All surfaces that are currently painted CL201: All surfaces that are currently painted 202: All surfaces that are currently painted CL202A: All surfaces that are currently painted CL202B: Do not paint 203: All surfaces that are currently painted CL203: Do not paint 204: All surfaces currently painted CB204: Do not paint 205: All surfaces that are currently painted ST201A: All surfaces that are currently painted. DO NOT need to remove the stair runner/carpet, paint around the stair runner/carpet.
ST201B: All surfaces that are currently painted W128: All surfaces that are currently painted. This is a historic window; utmost caution needs to be take removing the paint off the window to prep it for new paint. Follow SOW guidelines for removing paint off historic elements.
206: All surfaces that are currently painted 207: All surfaces that are currently painted. Follow SOW guidelines on painting around or behind bolter, nailed, screwed etc. items.
208: All surfaces that are currently painted.
CB208E: All surfaces that are currently painted CB208W: All surfaces that are currently painted Unnamed Closest in 208: All surfaces that are currently painted ST203: All surfaces that are currently painted, plus paint the unpainted drywall all the way to the door at the top of the stairs. Follow SOW guidelines for painting.
CL200: All surfaces that are currently painted Attic:
Do not paint anything in this section.
***This is a general guideline for what will/will not be painted. Their could be sections that need painted/not need painting that aren’t in this room schedule. Please work with the COR if you have additional questions or are unsure on specific that will affect painting operations.