B08_Attachment_7_QASP_Palisades_Sanitation_2026.pdf
PDF 395 KB Posted
- Attached to
- Solid Waste Sanitation Services DC Palisades Federal contract opportunity
- Solicitation number
- 140P1226Q0015
About this file
This is a Quality Assurance Surveillance Plan (QASP) for sanitation services at Rock Creek Park for Fiscal Year 2026. The document establishes the procedures and methodologies that the National Park Service will use to monitor the contractor's performance against the performance standards defined in the associated Performance Work Statement (PWS) for Palisades Sanitation Services.
The QASP employs a performance-based management approach that focuses on results and outcomes rather than compliance with specific processes. The Contracting Officer (CO) designates a full-time Contracting Officer's Representative (COR) responsible for technical administration and Government surveillance of contractor performance. Surveillance methods include bi-weekly file reviews of the Vendor Priority Tree List, random monitoring, periodic inspections, and customer complaint tracking. Performance standards establish Acceptable Quality Levels (AQLs) ranging from 90 to 100 percent across six primary service requirements: emptying trash containers within scheduled timeframes (90% AQL, no payment if not met), general housekeeping around trash cans (90% AQL, 80% payment penalty), disposal of non-park household trash (90% AQL, 80% payment penalty), disposal of collected trash at the maintenance facility (100% AQL), reporting damaged or vandalized cans (100% AQL), and maintaining daily work logs (100% AQL). Additional requirements include proper vehicle positioning, secured cargo transport, employee conduct standards limiting to two written incidents per employee, and immediate reporting of abnormalities or accidents. The contractor must correct any identified performance deficiencies within 48 hours of written notification. Monthly performance assessment reports are prepared by the COR for the Contracting Officer, and the COR conducts periodic reviews with the contractor to analyze performance data, discuss issues, and develop corrective action plans as needed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1226Q0015_Amd_0003.pdf | ||
| B03_140P1226Q0015_Amendment_3_Wage_Determination_No__2015-4281_0003.pdf | ||
| Sol_140P1226Q0015_Amd_0002.pdf | ||
| B09_Amend_2_WD_0002.pdf | ||
| Attach_8_Amend_2_140P1226Q0015_Palisades_Container_Type_Size_0002.pdf | ||
| B08_140P1226Q0015__Attachment_1_SOW_Palisades_0001.pdf | ||
| Sol_140P1226Q0015_Amd_0001.pdf | ||
| B08_140P1226Q0015__Attachment_2_SCA_Wage_Determination.pdf | ||
| Sol_140P1226Q0015.pdf | ||
| B08_140P1226Q0015_Attachment_3_Price_Schedule.xlsx | XLSX spreadsheet | |
| B08_Attachment_6_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_140P1226Q0015_Attachment_4_Technical_Questionnaire.docx | DOCX document | |
| B08_140P1226Q0015_Attachment_5_Past_Performance_Questionnaire.docx | DOCX document | |
| B08_140P1226Q0015__Attachment_1_SOW_Palisades.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rock Creek Park Palisades Sanitation
Quality Assurance Surveillance Plan
Palisades Sanitation FY26
QUALITY ASSURANCE SURVEILLANCE PLAN
INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled ROCR FY26 Palisades Sanitation Services. This plan sets forth the procedures and guidelines the National Park Service, Rock Creek Park (ROCR), will use in ensuring the required performance standards or services levels are achieved by the contractor.
Purpose
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s Quality Control Plan (QCP), and to ensure that the Government pays only for the level of services received.
This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
Performance Management Approach
The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by ROCR to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.
Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints.
The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
Performance Management Strategy
The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own Quality Control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated Government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the Government to take advantage of the contractor’s QC program.
The Government representative(s) will monitor performance and review performance reports furnished by the contractor in the completed “Vendor Priority Tree List” to determine how the contractor is performing against communicated performance objectives. The Government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES
The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by WOTR. The CO will designate one full-time Contractor Officer Representative or COR, as the Government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
The Contracting Officer Representative
The Contracting Officer’s Representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are outlined in the Performance Requirements Summary. If the contractor meets the required service or performance level, it will be paid as agreed upon in the contract. Failure to meet the required service or performance level will result nonpayment until the work is performed to a satisfactory level.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Monitoring Techniques
In an effort to minimize the performance management burden, simplified surveillance methods may be used by the Government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
File Reviews – The COR will review the completed work from the Vendor Priority Tree List and any other reports submitted by the contractor on a bi-weekly basis.
Random monitoring, which shall be performed by the COR designated inspector.
Periodic Inspection – COR typically performs the periodic inspections on a bi-weekly basis.
Customer Complaints - COR will keep track of customer complaints on a bi-weekly basis.
Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the CO and COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
Acceptable Quality Levels
The Acceptable Quality Levels (AQLs) are outlined throughout the PWS and in the Performance Requirements Summary, where contractor’s performance is structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 – General Industry and working closely with and alongside NPS personnel for the desired performance level is established at 90 percent. Other levels of performance are keyed to the relative importance of the task to the overall performance at ROCR.
QUALITY ASSURANCE DOCUMENTATION
The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes.
Performance standards are expressed in the performance requirements summary may be assessed using the surveillance monitoring techniques previously identified.
Monitoring Forms
The Government’s QA surveillance shall be reported using the Quality Assurance Monitoring Form or communicated in an email which shall contain the appropriate Tree ID#’s and dates when the work has been reported to be completed. The completed form and/or email will document the Government’s assessment of the contractor’s performance under the contract to ensure that the required service results are being achieved.
The COR will retain a copy of all completed QA surveillance forms.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance
Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
Reporting At the end of each month, the COR may prepare a written report for the ACO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report will become part of the QA documentation. It will enable the Government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution
The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other Government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
Recommendations for improved efficiency and/or effectiveness
Issues arising from the performance monitoring processes
The Quality Assurance Report must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the
CS.
PERFORMANCE REQUIREMENTS SUMMARY
The Government shall inspect the contractor’s performance under this contract periodically through the service and when the contractor declares the service complete. The Government must do so to ensure that the contractor has performed in accordance with the performance standards. If the Government should find any performance deficiencies, the Contractor shall correct the deficiencies within 48-hours of written notification by the COR, POC, or CO.
Required
Services/Tasks (from
PWS)
Performance Standard General Provisions
Acceptable Quality Level
(AQL)
Method Used/
Frequency
Incentive (Positive and/or Negative)
(Impact on Contractor Payments)
Empty trash containers within scheduled time frame regardless of volume of trash in can.
Part 2: A 90% Periodic COR inspection
No Payment will be made
Perform general housekeeping duties around the trash cans to ensure the area is maintained in a clean and neat manner at all times.
Part 2: A 90% Periodic COR inspection
80% of payment will be made.
Dispose of household “non-park” trash which has been left at or near a designated trash collection site.
Hazardous waste will be brought to the Rock Creek Maintenance Yard and placed in the holding area, designated by the COR, for disposal by Rock Creek Park.
Part 2: C 90% Periodic COR inspection
80% of payment will be made.
Contractor will dispose of all trash and debris collected under this contract at the Rock Creek Maintenance Facility in a Rock Creek trash container
Part 2: D 100% Periodic COR inspection
Contractor supervision will be notified via email for correction.
Contractor will report any damaged or vandalized trash cans needing repair or replacement to the COR.
Part 2: F 100% Periodic COR inspection
Contractor supervision will be notified via email for correction.
Reporting Completed Work from Vendor
Part 3 100% Received & approved 5 days prior to final payment application
Final payment will not be made until COR receives and approves Vendor Priority Tree List, Completed Work.
On-Site Supervisor and Alt. written designation Trash hauling vehicles shall not be left in the park when not in use.
Part 2: K 100% Periodic COR inspection.
Contractor supervision will be notified via email for correction.
Contractor must ensure that trash truck cargo is properly secured to prevent debris from blowing or falling on city streets or park property, this includes liquids
Part 2: H 100% Periodic COR inspection
Contractor supervision will be notified via email for correction.
Contractor Employee Conduct
Part 3: D 100% No more than 2 reported instances in writing as outlined in 4.3 may occur per employee
Offending employee will be dismissed from the premises and shall not return for
The Contractor shall note, and report to the COR immediately, any abnormality which might reflect upon his work, accident or incidents, or anything which might prevent him from performing any part of the agreed upon work.
Part 3: B 100% Must be reported immediately to the COR in writing.
80% of payment will be made.
The contractor shall maintain a daily work log using a form from the COR. At a minimum, this form will require the date, location, task performed, dump time, and tonnage (or approximate volume) dumped. It will have signature blocks for the Contractor (or his representative) and the COR. This along with a COR approved invoice will become a record of work acceptance.
The Contractor should maintain a copy signed by the COR for his records.
Part 3: A 100% Periodic COR inspection
Contractor supervision will be notified via email for correction.
SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling File Review Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
| INTRODUCTION |
| Purpose |
| The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the perf... |
| This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assuran... |
| Performance Management Approach |
| The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by ROCR ... |
| Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates... |
| Performance Management Strategy |
| The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own Quality Control (QC) program. QC is work output, not workers, and therefore includes all work performed under this c... |
| ROLES AND RESPONSIBILITIES |
| The Contracting Officer |
| The Contracting Officer Representative |
| IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS |
| METHODOLOGIES TO MONITOR PERFORMANCE |
| Surveillance Monitoring Techniques |
| Customer Feedback |
| Acceptable Quality Levels |
| QUALITY ASSURANCE DOCUMENTATION |
| The Performance Management Feedback Loop |
| Monitoring Forms |
| The COR will retain a copy of all completed QA surveillance forms. |
| ANALYSIS OF QUALITY ASSURANCE ASSESSMENT |
| Determining Performance |
| Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how... |
| Reporting |
| At the end of each month, the COR may prepare a written report for the ACO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report will become part of the QA documentation. It will e... |
| Reviews and Resolution |
| The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other Government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews w... |
| The Quality Assurance Report must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance. |
| The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be i... |
PERFORMANCE REQUIREMENTS SUMMARY
File details come from the government source that posted it. Updated .