B08_Attachment_7_Daily_Report_Log.doc

DOC document 77 KB Posted

Attached to
HAFE BLDG 38 HISTORIC STUCCO CONSERVATION
Solicitation number
140P3023R0013
Issued by

About this file

This document contains a contractor's quality control daily report template and information about a related federal contract opportunity for historic stucco conservation services. The quality control daily report template includes sections for documenting weather conditions, work performed by prime and subcontractors, inspections, testing, communications with the government, and a certification. The related federal contract opportunity is solicitation number 140P3023R0013 issued by the National Park Service for historic stucco conservation services at Building 38 at the Hawaii Volcanoes National Park. The response is due on an unspecified date.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR'S QUALITY CONTROL DAILY REPORT

REPORT NO. SHEET 1 OF 3

PRIVATE

PROJECT

CONTRACT NO.

DATE

PARK

CONTRACTOR'S REPRESENTATIVE ON THE JOB

WEATHER (Rain, Snow, Cloudy, Windy, etc.)
RAINFALL

Inches

TEMPERATURE
GROUND CONDITIONS (Dry, Damp, Wet, Frozen, etc.)

MAX.

MIN.

1. PRIME CONTRACTOR

NO. EMPLOYEES BY JOB CATEGORIES

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY PRIME CONTRACTOR:

MATERIALS DELIVERED

OFFICIAL VISITORS TO SITE

2A. SUBCONTRACTOR, _____________________________________________: (If more than one subcontractor use copies of following page.)

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

3. SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions)

4. TESTING: 1 Check if any testing was performed today. (Complete and attach Test Report Information Sheets.)

Type and Location of Testing: ____________________________________________________________________________________

5. VERBAL INSTRUCTION RECEIVED FROM GOVERNMENT ON CONSTRUCTION DEFICIENCIES OR RE-TESTING REQUIRED:

6. REMARKS:

7. CERTIFICATION:

I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the prime contractor and each subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above.

Contractor's Quality Control Representative

PRIVATE

SUBCONTRACTOR WORK CONTINUED:

CONTRACT NO.
REPORT NO. _______

SHEET 2 OF 3

2 SUBCONTRACTOR,

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
COMMENTS

WORK PERFORMED BY SUBCONTRACTOR:

DAILY TEST REPORT INFORMATION SHEET

CONTRACT NO. REPORT NO. _____________

SHEET 3 OF 3

PRIVATE

1. Individual Making Inspection or Test:

2. Testing Laboratory; Name:
Phone #:

Address:

3. Description of Work and Test Method:

4. Location of Samples and Tests or Inspections:

5. Specification Section:

6. Inspection or Test Data:

7. Test Results and Interpretations of Test Results:

8. Comments or Professional Opinion About Compliance of Inspected Work or Tested Work with contract Document Requirements:

9. Recommendations:

10. Corrective Actions Taken:

CERTIFICATION:

I certify that the above testing report is complete and correct and that all testing performed this day for this contract is in strict compliance with the plans and specifications except as noted above.

Signature of Inspector

File details come from the government source that posted it. Updated .