This document is a Quality Assurance Surveillance Plan (QASP) for custodial services at the Santa Monica Mountains National Recreation Area with a period of performance of 6/10/2024. The QASP outlines the objectives, roles and responsibilities of the Contracting Officer (CO) and Contracting Officer's Representative (COR), and the process for performance assessment and management throughout the contract. It includes performance objectives and thresholds, inspection procedures, and remedies for non-conformance. The QASP prescribes a Multi-Functional Team (MFT) to manage contractor performance, with the COR having primary responsibility for quality assurance monitoring and evaluation. Performance assessments are documented and reported through the Contract Performance Assessment Reporting System (CPARS). The QASP is a living document that can be revised as needed.

The related federal contract opportunity is a solicitation (Solicitation Number 140P8624Q0074) for custodial services at the Santa Monica Mountains National Recreation Area, issued by the Department of the Interior National Park Service Pacific West Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR CUSTODIAL SERVICES

Santa Monica Mountains National Recreation Area - SAMO

6/10/2024

1. OBJECTIVE

This Quality Assurance Surveillance Plan (QASP) is developed in accordance with FAR

46.401. The QASP will assist in evaluating the contractor’s performance as required by the Performance Work Statement (PWS). The plan prescribes the objectives of the QASP, goals and responsibilities of the Contracting Officer (CO) and Contracting Officer’s Representative (COR), and the process for performance assessment throughout the contract.

In addition to the services described in the PWS, the contractor is expected to be a partner with the NPS in continuously improving the quality and services offered. This QASP is designed to provide the COR with an effective and systematic method of monitoring contractor performance for each listed objective in the PWS. The QASP is based on the premise that the contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract.

2. MULTI-FUNCTIONAL TEAM (MFT) ROLES & RESPONSIBILITIES

The following Government personnel will participate in performance management of the contractor. Their roles and responsibilities are described as follows:

2.1. Contracting Officer (CO).

The CO is responsible for monitoring the contractor’s overall performance, including the areas of contract compliance, contract administration, cost control, reviewing the COR’s assessment of the contractor’s performance and resolving all discrepancies between the COR and the contractor. The CO is the only person with the authority to direct the contractor in the performance of duties under the contract and to make interpretations of and/or changes to the contract. The CO will facilitate MFT meetings.

2.2. Contracting Officer’s Representative (COR).

Responsible for monitoring, assessing, recording, and reporting on contractor compliance with the terms and conditions of the contract. A primary and/or alternate COR will be appointed for this contract. The Contracting Officer is the designating authority. The COR has primary responsibility for quality assurance monitoring and evaluation of the contractor’s performance

3. PERFORMANCE ASSESSMENT

The contract service requirements are summarized in the performance objectives below. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract

Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.

3.1. The following table will be utilized for performance assessments.

Performance Objective

PWS

Paragraph

Performance Threshold (per month)

Method of Surveillance

Basic Cleaning Services

1.1.1 No more than 3

validated defects per month.

Periodic Inspection

Remove Trash 1.1.3 No more than 3 validated defects per month.

Periodic Inspection

Interior Glass/Mirrors 1.1.4 No more than 3 validated defects per month.

Periodic Inspection

Drinking Fountains 1.1.5 No more than 3 validated defects per month.

Periodic Inspection

Vacuum and Clean Floor Mats

1.1.9. No more than 3

validated defects per month.

Periodic Inspection

General Spot Cleaning/Disinfecti ng

1.1.10 No more than 3

validated defects per month.

Periodic Inspection

General Dusting 1.1.11 No more than 3 validated defects per month.

Periodic Inspection

Basic Restrooms, Locker & Break Rooms Cleaning/Disinfecti ng

1.2 No more than 3

validated defects per month.

Periodic Inspection

Clean and Disinfect 1.2.1 No more than 3 validated defects per month.

Periodic Inspection

Descale Showers, Toilet Bowls, and Urinals

1.2.2 No more than 3

validated defects per month.

Periodic Inspection

Sweep, Mop and Disinfect Floors

1.2.3 No more than 3

validated defects per month.

Periodic Inspection

Stock Restroom Supplies

1.2.4 No more than 3

validated defects per month.

Periodic Inspection

Biannual Window Cleaning

1.2.5 No more than 3

validated defects per month.

Periodic Inspection

Interior Windows 1.2.5 No more than 3 validated defects per month.

Periodic Inspection

Exterior Windows

1.2.5 No more than 3

validated defects per event

Periodic Inspection

Special Event Cleaning Services

1.4 No more than 3

validated defects per cleaning

Periodic Inspection

Quality Control 4.1 No more than 3 validated defects per month.

Periodic Inspection

3.2. Inspections. The COR or Point of Contact (POC) will perform periodic inspections to ensure contractor compliance with the PWS. Inspection results will be recorded using Appendix A, and sent to the Contractor and CO on an as needed bases (adjusted based on quality levels). All negative findings will be sent to the CO for tracking purposes to ensure the performance thresholds outlined in paragraph 3.1. are met. The COR or POC will consider cleaning times and visitor use when documenting inspection results.

3.3. Remedies for Non-Conformance. If inspections indicate unacceptable performance, the COR or POC will take pictures of the area and notify the on-site contractor employee of the deficiencies for correction prior to reopening the restroom. The contractor will be given an appropriate time frame (depending on the discrepancy identified) to correct the unacceptable performance. If the contractor disagrees with the noted discrepancy and an agreement cannot be reached, the CO shall make a final decision. When re-performance is not possible, considerations may be sought.

4. PERFORMANCE MANAGEMENT

4.1. MFT Meetings. The MFT forms a partnership between the Government and the contractor to ensure the best possible service is provided for the life of the contract. This team will meet a minimum of each year as necessary to plan annual performance. All performance assessment documentation will be reviewed at these meetings. If performance improvement is necessary, a plan of action will be created. The MFT will continually review documentation and procedures to improve efficiency.

4.2. Contract Performance Assessment Reporting System (CPARS). The COR shall conduct, document, track, and analyze contractor performance via regularly scheduled assessments. The assessment results shall be maintained as Past Performance Information and utilized to prepare and support annual CPARS reporting. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance. The Assessing Official Representative (AOR) will be the COR who will also prepare the CPAR document for the CO’s review. The contractor will have input prior to the CPAR being finalized.

The following chart is the data input required for CPARS completion regarding the contract effort. Always consult CPARS guidance at cpars.gov for current guidance prior to preparing actual CPARS evaluation.

Element

Description

Quality Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety health standards).

Schedule Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedule, and administrative requirements (e.g., efforts that contribute to or effect the schedule variance).

Cost Control (Not required for Firm-Fixed Price or Firm-Fixed Price w/Economic Price Adjustment (EPA). Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost.

Management Assess the integration and coordination of all activities needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history or reasonable and cooperative behavior, customer satisfaction, timely award and management of subcontracts., and whether the contractor met small/small disadvantaged and woman owned business participation goals.

Management of Key Personnel (applicable when the contract / order contains a “Key Personnel” clause)

Assess the contractor’s performance in selecting, retaining, supporting, and replacing, when necessary, key personnel.

Utilization of Small Business

Assess compliance with all terms and conditions in the contract/order relating to Small Business participation (including FAR 52.219-8, Utilization of Small Businesses and FAR 52.219-9, Small Business Subcontracting Plan (when required). Assess any small business participation goals which are stated separately in the contract/order.

Assess achievement on each individual goal stated within the contract/order or subcontracting plan including good faith effort if the goal was not achieved.

Regulatory Compliance

Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes. Consider aspects of performance such as compliance with Financial, Environmental (Example: Clean Air Act, Clean Water Act), Safety, and Labor regulations as well as any other reporting requirements in the contract.

In evaluating the contractor’s performance, the following performance ratings will be utilized as described in FAR Part 42.

Ratings

Definition/Criteria Justification

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.

Satisfactory Performance meets contractual requirements.

The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).

Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a

To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

magnitude that it alone constitutes an unsatisfactory rating An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).

5. REVISIONS TO THIS QUALITY ASSURANCE SERVEILLANCE PLAN

Revisions to this QASP are the joint responsibility of the CO and COR. The COR reviews the PWS and QASP annually and will provide proposed changes, if necessary. This is a living document that can be changed at any time as needed.

Appendix A COR/POC Daily Inspection Record

PERFORMANCE

OBJECTIVE

PWS

Paragraph

ACCEPTABLE UNACCEPTABLE

Clean and disinfect IAW PWS & CDC Coronavirus requirements

1.1.1

All trash and Sanitizing containers emptied and returned

1.1.3

Soiled or torn trash/recycling liners replaced

1.1.3

Waste removed and disposed in dumpster

1.1.3

Waste receptacles clean (no foreign matter and no odors)

1.1.3

All interior glass, including mirrors, walls, and doors have no trace of film, dirt, smudges, or other foreign matter.

1.1.4

All drinking fountains cleaned and disinfected (including orifices, drain and exterior)

1.1.5

Drinking fountains free of streaks, stains, spots, smudges, film or any other obvious soil and debris

1.1.5

All floor mats free of visible, lint, litter, soil and other foreign matter

1.1.9

All areas under the mats free of soil and moisture

1.1.9

Walls, partitions, vents, grillwork, door, door guards, door handles, push bars, kick plates, light switches, temperature controls, and fixtures free of fingerprints, smudges, marks, streaks, and spills and disinfected

1.2.1

Hand dryer reservoirs and dryer units clean and disinfected free of any foreign matter

1.2.1

Horizontal and wall surfaces free of dust, dirt, smudges, and any foreign matter

1.2.1

All sinks, toilet bowls, toilet seats, urinals, lavatories, showers, shower mats, shower curtains, all toilet paper, toilet seat cover dispensers, doors, walls, clean and disinfected; free of smudges, fingerprints, marks, streaks, and all foreign matter

1.2.2

All Showers, toilet bowls and urinals clean and disinfected; free of scale, soap films, stains, marks and all foreign matter

1.2.2

All floors shall be clean and disinfected with no debris, dirt, stains mildew, and residue visible.

1.2.3

All toilet paper, paper towels, soap dispensers are stocked

1.2.4

Contractor shall notify COR as soon as possible if any observed plumbing problems, leaks or overflowing toilets occur

1.1

Describe in detail any Unacceptable ratings (include COR/POC name & date/time of inspection):

COR/POC Monthly Inspection Record

PWS

Paragraph

ACCEPTABLE UNACCEPTABLE

All Showers, toilet bowls and urinals clean and disinfected; free of scale, soap films, stains, marks and all foreign matter

Emergency Inspection Record

PWS

Paragraph

ACCEPTABLE UNACCEPTABLE

SEE PWS ADDENDUM

Special Event Inspection Record

PWS

Paragraph

ACCEPTABLE UNACCEPTABLE

SEE PWS ADDENDUM

COR/POC Deep Clean Inspection Record

PWS

Paragraph

ACCEPTABLE UNACCEPTABLE

SEE PWS ADDENDUM

Describe in detail any Unacceptable ratings:

1. OBJECTIVE
2. MULTI-FUNCTIONAL TEAM (MFT) ROLES & RESPONSIBILITIES
3. PERFORMANCE ASSESSMENT
4. PERFORMANCE MANAGEMENT
5. REVISIONS TO THIS QUALITY ASSURANCE SERVEILLANCE PLAN