About this file

This is a FAR Clause 52.219-14 Subcontracting Percentage Worksheet template issued by the National Park Service Contracting Operations (ConOps) East for the Building 40 Stabilization solicitation (140P4525R0022).

The worksheet provides instructions for calculating the subcontracting labor cost percentage that prime contractors must report in their proposals. Contractors must add direct labor and fringe benefits for both the prime contractor and subcontractor(s), then calculate labor G&A (General and Administrative Costs) by applying the stated G&A rate to subtotals. The subcontracting labor percentage is derived using the formula (D)/(C)+(D), where (D) represents the subcontractor's total labor cost and (C) represents the prime contractor's total labor cost. The document includes a sample calculation demonstrating a 21.43% subcontracting labor percentage. A critical requirement states that labor overhead must be demonstrated as allowable under FAR 31.205-6(m), or the entire overhead will be eliminated from calculations. For general construction work under FAR Clause 52.219-14(e)(3), the prime contractor or similarly situated entities must perform a minimum of 15 percent of the work excluding material costs, with payment to non-similarly situated subcontractors capped at 85 percent of the Government's contract performance amount.

View the file

Other files for this federal contract opportunity

Other files attached to PAGR MEK SURFACE REHAB, newest first.
File Type Posted
Sol_140P4526Q0022_Amd_0002.pdf PDF
B09_MEK_Surface_Rehab_-_Questions_and_Answers_0002.docx DOCX document
Sol_140P4526Q0022_Amd_0001.pdf PDF
Sol_140P4526Q0022.pdf PDF
A04_PAGR_256131_20250328_Addistone_SOW.pdf PDF
B03_WD_NJ20260002_013026.pdf PDF
PAGR_256131_MEK_Surface_Rehab_Price_Schedule.docx DOCX document
B08_PAGR_Cyclic_Rehab_Past_Performance_Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

CONTRACTING OPERATIONS (ConOps) EAST New York Major Acquisition Buying Office

210 New York Avenue

Staten Island, NY 10305

NPS-National Capital Area Page 1 of 2

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

25 July 2025

SUBJECT: FAR CLAUSE 52.219-14, SUBCONTRACTING PERCENTAGE WORKSHEET

SOLICITATION Building 40 Stabilization

PRIME CONTRACTOR: _________________________ SOURCE: ________________________

SUBCONTRACTOR: ___________________________ SOURCE: ________________________

SAMPLE SAMPLE SAMPLE

PRIME CONTRACTOR SUBCONTRACTOR

$250.00 $50.00

$300.00 $100.00

(A)$550 (B)$150

LABOR G&A** @ 10.00% $55.00 10.00% $15.00

(C)$605 (D)$165

21.43%Subcontracting Labor Percentage

DIRECT LABOR

FRINGE BENEFITS

SUB TOTAL

TOTAL LABOR COST

To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select

‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you (as illustrated).

a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space

(A).

c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).

d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR

COSTS at (C) and (D) respectively.

e) Next, using the formula below, calculate the subcontracting labor percentage.

____(D)____

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = %

*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205-

6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

**G&A denotes General and Administrative Costs

***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the

Solicitation: 140P4525R0022 – Building 40 Stabilization Page 2 of 2

Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

contractor's costs.

In accordance with FAR Clause 52.219-14(e)(3), General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. Therefore, the prime contractor or similarly situated entities shall perform a minimum of 15 percent of the work, excluding the cost of materials.