This is a Questions and Answers document for solicitation 140P4526Q0022, a cyclic surface rehabilitation project at Mary Ellen Kramer Park within Paterson Great Falls National Historical Park in Paterson, New Jersey, issued by the Department of the Interior National Park Service Northeast Region.

The project requires MEK surface rehabilitation work with a contract duration of 120 calendar days. Key scope elements include asphalt paving with resin bonded surface treatment application, removal and replacement of damaged steel edging sections, fine grading and recompaction of existing subbase material, and installation of approximately 120 linear feet of additional Belgian block edging in Project Area 2. The contractor should assume the existing subbase is adequate and requires only fine grading and recompaction; however, if unsuitable material is encountered, removal and replacement of up to 4-6 yards at 4-inch depth using Item 4 mix specification is included in the base bid. The finished height of Belgian curb following asphalt and resin bonded surface treatment installation should be 1-1.5 inches. No archaeological monitoring or construction permits are required, though a design application to the Historic Preservation Commission must be submitted by park staff. Temporary pathway closures during asphalt curing periods are permitted, and construction truck access via Maple Street is allowed. Key personnel resumes may be submitted in either Volume I or Volume II of the proposal. The proposal due date was extended to Monday, June 8, 2026 at 2:00 PM.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P4526Q0022: MEK SURFACE REHABILITATION , PATERSON GREAT FALLS NATIONAL HISTORICIAL PARK, PATERSON, NJ – Questions and Answers

Question: Reference is made to SF1442, Block 11, which identifies a Period of Performance of 60 calendar days, while Section F of the solicitation identifies a Period of Performance of 120 calendar days. Please clarify the required contract duration.

Answer: 120 calendar days

Question: Please confirm whether archaeological monitoring will be required for this project. If required, please clarify whether it will be provided by the Government or shall be the responsibility of the Contractor.

Answer: No monitoring required

Question: Please confirm whether construction permits will be required for this project.

Answer: No construction permits, but a design application to Historic Preservation Commission must be submitted. This will be done by the park staff that partners with the city. A zoning permit may be necessary for Project Area 1, but is highly unlikely. Again, park staff will assist if required.

1.

Question: Reference is made to the SOW regarding the required asphalt curing period prior to installation of the resin bonded surface treatment. During this curing period, pedestrian access to the pathway may need to be restricted. Please confirm whether temporary closure of the pathway during this period will be permitted.

Answer: Yes, closures are expected and will be permitted.

Question: Reference is made to the SOW. Please confirm whether damaged steel edging sections are to be removed and replaced as part of the project scope.

Answer: Yes, removed.

Question: Reference is made to the SOW. Please provide the required finished elevation/height of the Belgian curb following installation of the asphalt and resin bonded surface treatment.

Answer:1-1.5 inches. The height of existing block to surface isn't uniform but is generally less than 2 inches.

Question: Please confirm whether construction truck access to the site will be permitted via Maple Street.

Answer: Yes

Question: Please clarify whether resumes for the key personnel identified in Section H shall be included in Volume I or Volume II of the proposal submission.

Answer: Either.

Question: We respectfully request that the Government consider extending the proposal due date to allow adequate time for preparation and coordination of the submission.

Answer: Due date is extended until Monday, June 8, 2026 2PM

Existing Subbase

Question: Is the Contractor to assume the existing subbase is adequate and only requires fine grading and recompaction prior to asphalt paving?

Answer: Yes

Question: If unsuitable, unstable, or deficient subbase material is encountered during construction, is removal and replacement of the subbase required under the base bid?

Answer: Yes, but per Q1 it's highly unlikely any new subbase will be needed.

Question: If subbase replacement is required, please provide:

Answer: Anticipated depth of removal and replacement. 4 inches Answer: Required subbase material specification. Item 4 mix Answer: Estimated quantity or limits of replacement expected to be included in the bid. 4-6 yards in the event existing subbase needs compaction.

Belgian Block Edging

Question: Please confirm whether the existing Belgian block edging is anticipated to remain in place with only isolated repairs as necessary.

Answer: Yes, it's all in place and in good condition, except...

Question: Is there an estimated quantity of Belgian blocks expected to be replaced under the base bid?

Answer: No replacements needed, but approx. 120 lf of additional Belgian block for part of pathway in Project Area 2.