B08_Attachment_5_Final_Construction_Drawings.pdf
PDF 41 MB Posted
- Attached to
- PAIS Rehabilitate Headquarters Building
- Solicitation number
- 140P1324R0001
About this file
This document appears to be the final construction drawings for the PAIS Rehabilitate Park Headquarters Building federal contract opportunity.
The solicitation, number 140P1324R0001, is for the rehabilitation of the Park Headquarters Building for the Department of the Interior National Park Service Intermountain Region. The construction drawings provide the technical specifications and plans for the building renovation project. Key details include the required construction products and services, such as structural, electrical, plumbing, and HVAC work. The drawings likely contain dimensions, material specifications, and other technical details to guide the construction effort. This document would be a critical component for contractors to review when preparing their proposals for this solicitation.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR
OR
Design (Title I)
Prepared in Accordance with Preliminary by Preliminary Design (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Preliminary Design (Title I)
Project Manager
Drawing No.
Date
Date
QUALITY DESIGN CERTIFICATIONSheetMark REVISION Date Initial
STATEREGION COUNTY
LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING DRAWING NO.
DEPARTMENT OF THE INTERIOR
UNITED STATES
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
PMIS
PRIME/ARCH
ANDERSON HALLAS, PC
GOLDEN, CO
80401 PMIS/PKG NO.
SHEET
OF
DESIGN TEAM
STRUCTURAL
JVA, INC.
BOULDER, CO
80302
ELECTRICAL
AE DESIGN
DENVER, CO
80202
MECH / PLUMB
360 ENGINEERING
GOLDEN, CO
80403
FIRE SAFETY
INTERFACE
PORTLAND, OR
97204
5/
/2
1:
:5
P
M B
IM
-5
N P
S P
A
IS
R eh ab H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r vt
306809
306809
180451
1 83
TEXAS
INTERMOUNTAIN KLEBERG TEXAS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ
PARK HEADQUARTERS
FINAL CD
PADRE ISLAND NATIONAL SEASHORE
PROJECT LOCATION
PROJECT LOCATION
1 G0.1 G0.3 M3.1 CX MOD REVIEW 5/25/2023 LHMG0.
GENERAL NOTES
1. DO NOT SCALE DRAWINGS.
2. ALL WORK TO BE PERFORMED TO APPLICABLE BUILDING CODES (SEE
LIST OF APPLICABLE CODES).
3. VERIFY DIMESIONS OF ELEMENTS TO REMAIN IN FIELD. DRAWINGS
ARE BASED ON LIMITED FIELD MEASUREMENT.
4. ALL DIMENSIONS ARE TO FACE OF STRUCTURE UNLESS OTHERWISE
NOTED. ALL DIMENSIONS INDICATING REQUIRED CLEARANCES ARE
TO FACE OF FINISH UNLESS OTHERWISE NOTED.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIM
OR HERSELF WITH THE CONTRACT DOCUMENTS, VERIFYING FIELD
CONDITIONS AND DIMENSIONS, AND CONFIRMING THAT THE WORK
MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH
CONSTRUCTION. CONTRACTOR SHALL NOTIFY CONTRACTING
OFFICER IN WRITING OF ANY DISCREPANCY WITHIN THE CONTRACT
DOCUMENTS AND REQUEST CLARIFICATION PRIOR TO PROCEEDING
WITH CONSTRUCTION.
6. SHOULD THERE BE ANY QUESTIONS CONCERNING THE CONTRACT
DOCUMENTS, EXISTING CONDITIONS, AND/OR DESIGN INTENT, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A
CLARIFICATION FROM THE CONTRACTING OFFICER PRIOR TO
PROCEEDING WITH THE WORK, OR RELATED WORK IN QUESTION.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING
HIMSELF WITH THE PROJECT SCOPE OF WORK, SCHEDULE, AND
DEADLINES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ADVISING THE CONTRACTING OFFICER OF ALL ITEMS REQUIRING A
LONG LEAD TIME UPON NOTICE TO PROCEED THAT WILL AFFECT THE
SCHEDULE, AND SHALL SUBMIT ORDER CONFIRMATIONS AND
DELIVERY DATES FOR THE ITEMS IN QUESTION TO THE CONTACTING
OFFICER.
8. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN
STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDED
SPECIFICATIONS, EXCEPT WHERE THE CONTRACT DOCUMENTS ARE
MORE STRINGENT. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT
SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER INSTALLATION
SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. THE
CONTRACTOR SHALL FURNISH TO THE CONTRACTING OFFICER. ALL
WARRANTIES AND GUARANTEES REQUIRED AT THE CONCLUSION OF
THE PROJECT.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HOOK UPS / UTILITY
CONNECTIONS, ETC. TO TEMPORARY TRAILERS. DURING
CONSTRUCTION.
WALL TYPES X
PLUMBING
WALL
TYPE #
GRAPHIC
REPRESENTATION
MR GWB, PT. ABOVE TILE AND ON
NON-TILED WALLS
2X6 WOOD STUDS AT 16" OC
MINERAL WOOL ACOUSTIC BATT
MR GWB, PT
INTERIOR
TYPICAL
/4
MR GWB, PT
2X4 WOOD STUDS AT 16" OC
MR GWB, PT
MINERAL WOOL ACOUSTIC
BATT INSULATION
WET
AT RESTROOMS PROVIDE
CERAMIC TILE ON CTBB TO
5 FT WHERE DESIGNATED
INTERIOR
SHEAR
WALL
/4
MR GWB, PT
2X4 WOOD STUDS AT 16"
MR GWB, PT
MINERAL WOOL ACOUSTIC
BATT INSULATION
PLYWOOD SHEATHING,
REF: STRUCTURAL
FIBER CEMENT LAP SIDING
1"X3" P.T. FURRING STRIPS 16" OC
2 LAYERS 1.5" POLYISO INSULATION
WITH AIR/VAPOR BARRIER BETWEEN
EXISTING 1X DIAGONAL
SHEATHING TO REMAIN
EXISTING WOOD STUD
FRAMING TO REMAIN
UNFACED MINERAL WOOL
BATT INSULATION
MR GWB, PT
EXTERIOR
TYPICAL
MATERIALS - NEW EXCEPT
WHERE NOTED AS EXISTING
A4.0
A8.0
ROOM
250 SF
A9.0
A5.0
FIRST FLOOR
100'-0"
5 1 6 75
KEY
NOTE
WALL
TYPE
WINDOW
TYPE/NUMBER
DOOR
NUMBER
ELEVATION
MARK
NORTH
ARROW
DETAIL
REFERENCE
BUILDING
SECTION
EXTERIOR
ELEVATION
INTERIOR
ELEVATION
ROOM
TAG
SYMBOLS
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
P.T. PRESSURE TREATED
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PT PAINT
PTD PAINTED
PWD PLYWOOD
QT QUARRY TILE
R RISER
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFER TO or REFERENCE
REINF REINFORCED
RELOC RELOCATE(D)
REQ REQUIRED
REV REVISE, REVISED or
REVISION
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
(S) SEALANT
S SOUTH
SCHED SCHEDULE
SF SQUARE FEET
SHTG SHEATHING
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STN STAIN
STRUC STRUCTURE or
STRUCTURAL
(T) TEMPERED
T TREAD
T&G TONGUE AND GROOVE
T.O. TOP OF
TD THRESHOLD
TYP TYPICAL
UON UNLESS OTHERWISE
NOTED
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VIN VINYL
VTR VENT THROUGH ROOF
W WEST
W/ WITH
W/O WITHOUT
WD WOOD
WIN WINDOW
FACP FIRE ALARM CONTROL
PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FIN FINISH(ED)
FIXT FIXTURE
FLR FLOOR(ING)
FO FACE OF
FP FIRE PROTECTION
FRP FIBERGLASS REINFORCED
PANEL(ING)
FT FEET
FTG FOOTING
FURR FURRING
GA GAUGE OR GYPSUM
ASSOCIATION
GALV GLAVANIZED
GC GENERAL CONTRACTOR
GD GRADE
GL GLASS or GLAZING
GND GROUND
GWB GYPSUM WALLBOARD
HM HOLLOW METAL
HAZMAT HAZARDOUS MATERIAL
HDR HEADER
HDW HARDWARE
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATION and
AIR CONDITIONING
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIAMETER
INFO INFORMATION
INS INSULATION or INSULATED
INT INTERIOR
JT JOINT
LAV LAVATORY
LIN LINOLEUM
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL
and PLUMBING
MFG MANUFACTURING
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTL METAL
<N> NEW
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
# POUND(S) or NUMBER
& AND
< ANGLE
@ AT
A/V AUDIO VISUAL
ABA AMERICAN BARRIERS ACT
ABV ABOVE
ACM ASBESTOS CONTAINING
MATERIAL
ACT ACCOUSTICAL CEILING TILE
ADD ADDENDUM
ADJ ADJACENT or ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
APPROX APPROXIMATE(LY)
ARCH ARCHITECTURAL
AVB AIR /VAPOR BARRIER
B.O. BOTTOM OF
BLDG BUILDING
BLKG BLOCKING
BR BACKER ROD
BTWN BETWEEN
C.O. CONTRACTING OFFICER
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTBB CEMENTITIOUS TILE
BACKER BOARD
CTR CENTER
DBL DOUBLE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DIAM DIAMETER
DIM DIMENSION
DN DOWN
DS DOWNSPOUT
<E> EXISTING
E EAST
EA EACH
EG FOR EXAMPLE
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQP EQUIPMENT
ETR EXISTING TO REMAIN
EXT EXTERIOR
ABBREVIATIONS INDEX
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:5
P
M
G0.1
LM/JM
LM/JM
WS/LM
5/3/2023
GENERAL
INFORMATION & INDEX
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
2 83
SHEET #
OF
SUB.
SHEET SHEET NAME
MECHANICAL
45 83 M0.1 HVAC COVER SHEET
46 83 M0.2 MECHANICAL COMCHECK
47 83 MD1.1 HVAC DEMO
48 83 M1.1 HVAC NEW FLOOR PLAN
49 83 M1.2 REFRIGERANT PIPING FLOOR PLAN
50 83 M3.0 MECHANICAL SECTION VIEWS
51 83 M4.0 MECHANICAL DETAILS
52 83 M6.0 MECHANICAL SCHEDULES
PLUMBING
53 83 P0.1 PLUMBING COVER SHEET
54 83 PD1.1 PLUMBING DEMO
55 83 P1.1 PLUMBING NEW FLOOR PLAN
56 83 P2.0 PLUMBING ENLARGED PLANS
57 83 P3.0 PLUMBING WASTE/VENT ISOMETRICS
58 83 P4.0 PLUMBING DETAILS
59 83 P6.0 PLUMBING SCHEDULES
ELECTRICAL
60 83 E0.0 ELECTRICAL COVER SHEET
61 83 E0.1 ELECTRICAL GENERAL NOTES
62 83 E1.0 ELECTRICAL CRAWLSPACE POWER PLAN
63 83 E1.1 ELECTRICAL MAIN FLOOR POWER PLAN
64 83 E2.1 ELECTRICAL MAIN FLOOR LIGHTING PLAN
65 83 E3.0 ELECTRICAL ONE-LINE DIAGRAM
66 83 E4.0 ELECTRICAL SCHEDULES
67 83 E4.1 ELECTRICAL SCHEDULES
68 83 E4.2 ELECTRICAL SCHEDULES
69 83 E5.0 ELECTRICAL DETAILS
TECHNOLOGY
70 83 T0.0 TECHNOLOGY COVER SHEET
71 83 T0.1 TECHNOLOGY RESPONSIBILITY MATRIX
72 83 T2.1 TECHNOLOGY MAIN PLAN
73 83 T3.1 TECHNOLOGY MAIN FLOOR CEILING
PLAN
74 83 T4.0 ENLARGED TECHNOLOGY PLAN
75 83 T5.0 TECHNOLOGY DIAGRAMS
76 83 T6.0 TECHNOLOGY DETAILS
77 83 T6.1 TECHNOLOGY DETAILS
78 83 T7.0 TECHNOLOGY SCHEDULES
FIRE LIFE SAFETY
79 83 FP0.1 SYMBOL LIST AND GENERAL NOTES -
FIRE LIFE SAFETY
80 83 FPD1.0 CRAWLSPACE DEMOLITION PLAN - FIRE
LIFE SAFETY
81 83 FPD1.1 MAIN FLOOR DEMOLITION PLAN - FIRE
LIFE SAFETY
82 83 FP1.1 MAIN FLOOR PLAN - FIRE LIFE SAFETY
83 83 FP4.0 DETAILS - FIRE LIFE SAFETY
SHEET #
OF
SUB.
SHEET SHEET NAME
GENERAL
1 83 G0.0 COVER SHEET
2 83 G0.1 GENERAL INFORMATION & INDEX
3 83 G0.2 CONSTRUCTION STAGING PLAN
4 83 G0.3 MAIN FLOOR CODE PLAN & ANALYSIS
ARCHITECTURAL
5 83 AD1.0 CRAWLSPACE DEMOLITION PLAN & RCP
6 83 AD1.1 MAIN FLOOR DEMOLITION PLAN
7 83 AD1.2 MAIN FLOOR DEMOLITION RCP & ROOF
PLAN
8 83 A1.0 CRAWLSPACE PLAN
9 83 A1.1 MAIN FLOOR PLAN
10 83 A1.2 ROOF PLAN
11 83 A2.0 CRAWLSPACE REFLECTED CEILING PLAN
12 83 A2.1 MAIN FLOOR REFLECTED CEILING PLAN
13 83 A3.1 EXTERIOR ELEVATIONS
14 83 A3.2 EXTERIOR ELEVATIONS
15 83 A4.1 BUILDING SECTIONS
16 83 A4.2 BUILDING SECTIONS
17 83 A5.1 WALL SECTIONS
18 83 A5.2 WALL SECTIONS
19 83 A6.1 ENLARGED PLANS & INTERIOR
ELEVATIONS
20 83 A6.2 FINISH SCHEDULE & INTERIOR
ELEVATIONS
21 83 A6.3 INTERIOR CASEWORK
22 83 A7.1 VERTICAL CIRCULATION
23 83 A7.2 VERTICAL CIRCULATION
24 83 A8.1 DOOR & WINDOW SCHEDULES
25 83 A8.2 STOREFRONT
26 83 A9.1 DETAILS - WALL ENVELOPE
27 83 A9.2 DETAILS - OPENINGS
28 83 A9.3 DETAILS - OPENINGS
29 83 A9.4 DETAILS - ROOF
STRUCTURAL
30 83 S0.1 GENERAL NOTES
31 83 S0.2 GENERAL NOTES
32 83 S0.3 GENERAL NOTES
33 83 S0.4 ABBREVIATIONS & SYMBOLS
34 83 S0.5 3D VIEW
35 83 S1.1 FOUNDATION PLAN
36 83 S1.2 FLOOR FRAMING PLAN
37 83 S1.3 ROOF FRAMING PLAN
38 83 S4.1 FRAME ELEVATIONS
39 83 S5.01 TYPICAL CONCRETE DETAILS
40 83 S5.02 TYPICAL WOOD DETAILS
41 83 S5.03 TYPICAL WOOD DETAILS
42 83 S5.11 FOUNDATION SECTIONS
43 83 S5.21 FLOOR FRAMING SECTIONS
44 83 S5.31 ROOF FRAMING SECTIONS
HQ BLDG
STAGING AND ACCESS NOTES
1. SINGLE ROAD ACCESS ROUTE FOR CONSTRUCTION AND
NPS. MAINTAIN NPS ACCESS AND EMERGENCY EGRESS
ROUTES. COORDINATE ANY TEMPORARY ROAD
CLOSURES WITH CONTRACTING OFFICER.
2. POTENTIAL STAGING AREA SHOWN.
3. EXISTING TRAILER SOUTH OF HQ TO BE REMOVED BY
PARK PRIOR TO CONSTRUCTION.
4. CONTRACTOR PARKING TO BE COORDINATED WITH
CONTRACTING OFFICER AND MAY CHANGE SEASONALLY.
5. PROVIDE FENCING AT CONSTRUCTION AND STAGING
AREAS AS DESCRIBED IN DIV 01 SPECIFICATIONS.
6. GATES PROVIDED AS ACCESS TO FENCED
CONSTRUCTION SHALL NOT SWING INTO EXISTING
TRAFFIC AREAS.
7. STAGING AREA SHALL BE RESTORED TO PRE-
CONSTRUCTION CONDITION WHEN WORK IS COMPLETE.
8. CONTRACTOR SHALL MAINTAIN EMERGENCY EGRESS
ROUTES DURING CONSTRUCTION.
9. SEE SPECIFICATIONS FOR COMPLIANCE AND MITIGATION
REQUIREMENTS.
CONSTRUCTION AREA
DESIGNATED STAGING AREA
STAGING AND ACCESS LEGEND
MAINTAIN NPS ACCESS
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:5
P
M
G0.2
LM/JM
LM/JM
WS/LM
5/3/2023
CONSTRUCTION
STAGING PLAN
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
3 83
G0.2
CONSTRUCTION STAGING AND ACCESS1
SCALE OF FEET
6030030
CODE ANALYSIS
APPLICABLE CODES
2021 INTERNATIONAL BUILDING CODE
2021 INTENATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL FIRE CODE
2020 NATIONAL ELECTRIC CODE
ASHRAE 90.1 - 2013
ASHRAE 62.1 - 2004
NFPA 72
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
2021 IEBC CLASSIFICATION
604 WORK CLASSIFIED AS A LEVEL 3 ALTERATION
604 WORK AREA IS ENTIRE BUILDING
903 FIRE SPRINKLER AND ALARM SYSTEMS ARE NOT REQUIRED
ALL NEW CONSTRUCTION TO COMPLY WITH IBC AND IECC
2021 IBC USE & OCCUPANCY CLASSIFICATION
B BUSINESS
*NOTE: ASSEMBLY AND STORAGE AREAS ARE CONSIDERED ACCESSORY PER IBC 303.1.2
GENERAL BUILDING HEIGHTS & AREAS
EXISTING BUILDING HEIGHT (18'-4"), STORIES (1), AND AREA (4,700 SQ. FT.) ALLOW THE
BUILDING TO BE CONSIDERED TYPE VB CONSTRUCTION PER IBC 504-506.
TYPE OF CONSTRUCTION
VB PER SECTION 602.5 (NON-SPRINKLERED)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS PER TABLE 601 & 705.5
PRIMARY STRUCTURAL FRAME 0HR
BEARING WALLS
EXTERIOR 0HR*
INTERIOR 0HR
NON-BEARING WALLS
EXTERIOR 0HR*
INTERIOR 0HR
FLOOR CONSTRUCTION 0HR
ROOF CONSTRUCTION 0HR
*705.3 BUILDINGS ON THE SAME LOT, EXCEPTION 1:
TWO OR MORE BUILDINGS ON THE SAME LOT SHALL BE CONSIDERED AS PORTIONS OF ONE
BUILDING IF THE AGGREGATE AREA OF SUCH BUILDINGS IS WITHIN THE LIMITS SPECIFIED IN
CHAPTER 5 FOR A SINGLE BUILDING. WHERE THE BUILDINGS CONTAIN DIFFERENT
OCCUPANCY GROUPS OR ARE OF DIFFERENT TYPES OF CONSTRUCTION, THE AREA SHALL
BE THAT ALLOWED FOR THE MOST RESTRICTIVE OCCUPANCY OR CONSTRUCTION.
EXISTING GARAGE OF CONSTRUCTION TYPE S-1 ADDS 1,117 SQ. FT.
4,700 SQ. FT. + 1,117 SQ. FT. = 5,817 SQ. FT. < 9,000 SQ. FT. (COMBINED ALLOWABLE)
MEANS OF EGRESS
OCCUPANTS: 49 IN BUSINESS OCCUPANCY
BREAK 5
CONFERENCE 19
OFFICES 22
MECHANICAL / STORAGE 3
TOTAL BUILDING OCCUPANTS 49
EXIT SEPARATION
SEPARATION REQUIRED = 56'-0"
SEPARATION PROVIDED = 60'-7"
(EXIT SEPARATION IS NOT LESS THAN 1/2 OVERALL DIAGONAL IN ACCORDANCE WITH IBC
1007.1.1)
EGRESS WIDTH PER IBC 1005.3.2
OTHER EGRESS COMPONENTS: 0.2" PER OCCUPANT
49 OCCUPANTS X 0.2 = 9.8" (FOR DOORS, DEFAULTS TO 32" MIN CLEAR WIDTH)
EXIT ACCESS MAXIMUM TRAVEL DISTANCE PER IBC TABLE 1017.2
OCCUPANCY B (NON-SPRINKLERED) 200'
MINIMUM PLUMBING FACILITIES
PLUMBING FIXTURE COUNTS PER OCCUPANT LOAD, PER IBC 2902.1
49 TOTAL BUILDING OCCUPANTS
WATER CLOSETS: 1 PER 25 FOR THE FIRST 50 OCCUPANTS AND 1 PER 50 FOR THE
REMAINDER EXCEEDING 50
= 2 REQUIRED, 2 PROVIDED
LAVATORIES: 1 PER 40 FOR THE FIRST 80 OCCUPANTS
= 2 REQUIRED, 2 PROVIDED
DRINKING FOUNTAINS: 1 PER 100
= 1 REQUIRED, 1 FILTERED BOTTLE FILLING STATION INDICATED IN LIEU OF FOUNTAIN
TO COMPLY WITH CURRENT PARK PRACTICES GIVEN LIMITED DRINKING WATER
SUPPLY ON THE ISLAND
SERVICE SINKS: 1 REQUIRED, 1 PROVIDED
2021 IECC
C301 KLEBERG COUNTY, TX: CLIMATE ZONE 2A WARM-HUMID
613 MIN PRESCRIPTIVE R- AND U-VALUES PROVIDED VLAUES
ROOF ABOVE DECK R25CI R25CI
WOOD FRAMED WALLS R13 + R3.8CI R15 + R15CI
FRAMED FLOORS R30 R30
FENESTRATION OPERABLE U.60 U.60
ENTRANCE DOORS U.83 U.83
ABA EXIT
LEGEND
FEC
EGRESS DOOR
ABA ROUTE
NEW SEMI-RECESSED
FIRE EXTINGUISHER
CABINET (SHALL NOT
PROTRUDE MORE
THAN 4" FROM WALL).
SLOPE NOT TO EXCEED 2% IN ANY
DIRECTION AT LANDING OF DOOR
CHANGES IN LEVEL IN FLOOR SURFACE OF
1/4 INCH MAXIMUM.
CHANGES IN LEVEL GRATER THAN 1/4 INCH
IN HEIGHT AND NOT MORE THAN 1/2 INCH
MAXIMUM IN HEIGHT SHALL BE BEVELED
WITH A SLOPE NOT STEEPER THAN 1:2
VEST.
MECH
IT EQUIP
L STOR
C/P
S CHIEF
JAN
UNISEX
UNISEX
SHARED
IT OFFICE
M CHIEF
L CHIEF
VEST.
R SHARED 1
R SHARED 2
BREAK
CONFERENCE
SUPER
PROP & PIV
A CHIEF
VEST.
A SHARED
T CHIEF
I CHIEF
TO
PARKING
AREA
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
S CHIEF
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
SHARED
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
IT OFFICE
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
IT EQUIP
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
STORAGE
MECH
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
CONCENTRATED
BUSINESS USE
BREAK
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
ASSEMBLY
CONFERENCE
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
SUPER
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
T CHIEF
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
I CHIEF
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
A SHARED
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
A CHIEF
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
PROP & PIV
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
STORAGE
JAN
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
C/P
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
R SHARED 2
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
R SHARED 1
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
STORAGE
L STOR
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
L CHIEF
OCC TYPE:
AREA:
OCC LOAD FACTOR:
OCC LOAD:
OFFICE
M CHIEF
R STOR
FEC FEC
FEC
FEC
FEC
REQ. EXIT SEPARATION: 1/2 x 167' - 10 5/8" = 84' - 0"
EXIT EGRESS DISTANCE 167' - 10 5/8"
EXIT EGRESS SEPARATION
100' - 11 1/8" ACTUAL
ACCESSIBILITY CLEAR SPACE LEGEND
CLEAR FLOOR
SPACE (CFS)
CIRCULAR
TURNING SPACE*
ø 5' - 0
4' - 0"
T-SHAPED
TURNING SPACE
1' - 0" 3' - 0" 1' - 0"
4' - 0"
FRONT APPROACH
PULL SIDE
(FINISHED)
1' - 6" MIN.
3' - 0"
4' - 6"
LATCH APPROACH
PUSH SIDE
(FINISHED)
2' - 0" MIN.
3' - 0"
5' - 0"
FRONT APPROACH
PUSH SIDE
3' - 0"
WATER CLOSET
CLEARANCE
5' - 0"
FRONT APPROACH
PUSH SIDE W/ CLOSER
4' - 0"
1' - 0" 3' - 0"
*60-INCH MIN DIAMETER TURNING SPACE FOR EXISTING BUILDINGS PER ANSI/ICC A117.1 SECTION 304.3.1.2
CONDITIONED SPACE
THERMAL
ENVELOPE
CONDITIONED
SPACE
THERMAL
ENVELOPE
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: B
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/2
/2
:4
:4
P
M
G0.3
LM/JM
LM/JM
WS/LM
5/3/2023
MAIN FLOOR CODE
PLAN & ANALYSIS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
4 83
80 168
SCALE OF FEET
G0.3
MAIN FLOOR CODE AND ABA PLAN1
FIRE PROTECTION ANALYSIS PER AHJ (6/3/2022)
FOR THIS OCCUPANCY CLASSIFICATION, BUILDING AREA, AND
CONSTRUCTION TYPE, IBC / IFC DOES NOT REQUIRE FIRE
SPRINKLERS OR FIRE DETECTION ALARM SYSTEM:
SPRINKLERS. IBC/IFC SECTION 903 HAS NO REQUIREMENT FOR B
OCCUPANCIES, UNLESS THIS OCCUPANCY WAS IN A BUILDING
HIGHER THAT 55 FEET (903.2.11.3) OR WITHIN A STORY WITHOUT
OPENINGS (903.2.11.1).
ALARM/DETECTION. IBC/IFC SECTION 907.2.2 ONLY REQUIRES A
MANUAL FIRE ALARM SYSTEM WHEN THE TOTAL OCCUPANT LOAD OF
THE BUILDING IS 500 OR MORE OCCUPANTS, OR 100 OCCUPANTS
ABOVE/BELOW THE FIRST FLOOR.
BUILDING HEIGHT AND AREA: IBC SECTION 506 LISTS THE ALLOWABLE
AREA OF BUILDINGS BASED UPON THE OCCUPANCY CLASSIFICATION
AND CONSTRUCTION TYPE. THE PROPOSED BUILDING IS INDICATED
AS A SINGLE-STORY, BUSINESS OCCUPANCY, TYPE 5-B, WITH A TOTAL
AREA OF 4,700 SQUARE FEET, WHICH IS WELL BELOW THE
ALLOWABLE AREA FACTOR OF 9,000 SQUARE FEET LISTED IN TABLE
506.2
ADJACENT BUILDING. AS NOTED ON SHEET G0.3, THE GARAGE
LOCATED ADJACENT TO THE HQ BUILDING CAN BE CONSIDERED ONE
BUILDING FOR THE PURPOSES OF CALCULATING ALLOWABLE AREA IN
ACCORDANCE WITH IBC 705.3, EXCEPTION 1, AS LONG AS THE MOST
RESTRICTIVE AREA CALCULATION IS USED . IN REVIEWING IBC TABLE
506.2 FOR A GROUP S-1 OCCUPANCY (THE ADJACENT PARKING
GARAGE), THE ALLOWABLE AREA FACTOR IS ALSO LISTED AS 9,000
SQUARE FEET FOR TYPE V-B CONSTRUCTION.
SCALE B
SECTION - THERMAL ENVELOPE
SCALE B
SECTION - THERMAL ENVELOPE
160 3216
SCALE OF FEET
5/25/2023
B B
10' - 7" 10' - 11" 11' - 7" 11' - 11" 10' - 8" 11' - 0" 11' - 0" 11' - 2" 10' - 9" 11' - 0" 11' - 2" 10' - 7" 11' - 3" 10' - 10" 10' - 10"
165' - 3"
A A
C C
D1
D2 D2
D3 D3
D4
D28
D2
D2
D3
D27
D3
D1 D1D1D1D1
D27
D29
D30D30D30D30
B B
A A
C C
D6D6D6
D4D3
D29
GWB CEILING TO BE REMOVED
LEGEND
ACT CEILING TO BE REMOVED
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:2
P
M
AD1.0
LM/JM
LM/JM
WS/LM
5/3/2023
CRAWLSPACE
DEMOLITION PLAN &
RCP
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
5 83
80 168
SCALE OF FEET
SCALEAD1.0
1 CRAWLSPACE DEMOLITION PLAN
A
1. GENERAL INTENT IS THAT ALL NON-STRUCTURAL ITEMS
ARE TO BE DEMOLISHED. DRAWINGS SEEK TO
REPRESENT THE SCOPE AND RANGE OF DEMOLITION
REQUIRED BUT ARE NOT INTENDED TO BE INCLUSIVE OF
ALL NECESSARY WORK.
2. STRUCTURAL ITEMS TO REMAIN INCLUDE WOOD FRAMING
AND SHEATHING AT ROOF, WALL AND FLOOR. COMPLETE
DEMOLITION TO THE EXTERIOR AND INTERIOR FACE OF
RAFTER, JOIST, STUD OR SHEATHING, TYPICAL. SEE
STRUCTURAL FOR SELECTIVE PIER DEMOLITION.
3. SEE ALSO STRUCTURAL (NOTES S0.1), MECHANICAL
(MD1.1), PLUMBING (PD1.1), ELECTRICAL (NOTES E0.1)AND
FIRE PROTECTION (FPD1.0) SHEETS FOR THE FULL
EXTENT OF DEMOLITION ACTIVITIES.
DEMOLITION NOTES:
KEYNOTES
D1 REMOVE CONCRETE SLAB AND CMU/CONCRETE
CURB THROUGHOUT CRAWLSPACE
D2 REMOVE PERIMETER SKIRT WALLS AND DOORS AT
CRAWLSPACE
D3 REMOVE EXTERIOR WOOD STAIR, STRUCTURAL
POSTS AND JOIST TO REMAIN
D4 DEMOLISH RAMP RAILING BOARDS. REMOVE AND
SALVAGE ALL OTHER ELEMENTS OF NORTH RAMP
AS REQUIRED FOR CONSTRUCTION ACCESS
D6 REMOVE CEILINGS AND INSULATION WHERE
PRESENT IN CRAWLSPACE
D27 GENERATOR AND TRANSFORMER TO REMAIN.
PROTECT IN PLACE
D28 REMOVE WD SCREEN AT MECH UNIT ENCLOSURE
D29 EXISTING COMMUNICATION POLE TO REMAIN
D30 EXISTING COLUMNS TO REMAIN
SCALEAD1.0
2 CRAWLSPACE REFLECTED CEILING DEMOLITION PLAN
A
DN
D N
B B
A A
C C
DN D7
D7
D7
D7
D8
D8D3
D3
D4
D28
D9
D10
D11
D11 D11
D12
D12
D12
D12
D13D13 D14 D14
D15
D15
D15
D17
D18D18
D3
D8
D19
D17
D20
D20
D27
DNDN
DN DN
D5D3
D29
D5
D11
D11
D11D11
D11 D11
EXISTING STRUCTURE TO REMAIN
EXISTING WALL TO BE REMOVED
EXISTING DOOR TO BE REMOVED
LEGEND
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:2
P
M
AD1.1
LM/JM
LM/JM
WS/LM
5/3/2023
MAIN FLOOR
DEMOLITION PLAN
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
6 83
80 168
SCALE OF FEET
SCALEAD1.1
1 MAIN FLOOR DEMOLITION PLAN
A
KEYNOTES
D3 REMOVE EXTERIOR WOOD STAIR, STRUCTURAL
POSTS AND JOIST TO REMAIN
D4 DEMOLISH RAMP RAILING BOARDS. REMOVE AND
SALVAGE ALL OTHER ELEMENTS OF NORTH RAMP
AS REQUIRED FOR CONSTRUCTION ACCESS
D5 REMOVE LOUVERED PARTITION AT ENTRY PORCH
D7 REMOVE EXTERIOR WALL CLADDING, TRIM ETC.
BACK TO WD STRUCTURAL FRAMING, PROTECT
STRUCTURE
D8 REMOVE EXISTING EXTERIOR DOORS, FRAMES AND
TRIM
D9 REMOVE ALL EXISTING WINDOWS
D10 REMOVE EXTERIOR STOREFRONT
D11 REMOVE ALL FLOORING AND RELATED ADHESIVES
AND GROUT; REF: STRUCTURAL FOR EXTENT OF
REMOVAL OF FLOOR SUBSTRATE
D12 REMOVE ALL GWB, FURRING, INSULATION, FINISHES
AND TRIM AT INSIDE OF EXTERIOR WALLS -
PROTECT STRUCTURAL FRAMING
D13 REMOVE ALL INTERIOR WALLS, PARTITIONS, TRIM
AND FINISHES, TYP. BRACE STRUCTURE DURING
DEMO ACTIVITIES, REF TO STRUCTURAL FOR
ADDITIONAL REQUIREMENTS
D14 REMOVE ALL INTERIOR DOORS, HARDWARE AND
TRIM
D15 REMOVE PLUMBING FIXTURES REF: PLUMBING
D17 REMOVE AND DISPOSE ALL <E> CASEWORK AND
ANY REMAINING <E> APPLIANCES
D18 REF: MECH AND ELEC FOR DEMO OF SYSTEMS,
PLENUM AND OTHER RELATED ITEMS IN THIS AREA
D19 REMOVE ROOF CONNECTION TO ADJACENT
GARAGE - SEE FLOOR PLAN SHEETS FOR
TERMINATION OF FIRE SUPPRESSION ELEMENTS
D20 ASBESTOS ABATEMENT REQUIRED. REF TO HAZMAT
REPORT AND SPECIFICATIONS
D27 GENERATOR AND TRANSFORMER TO REMAIN.
PROTECT IN PLACE
D28 REMOVE WD SCREEN AT MECH UNIT ENCLOSURE
D29 EXISTING COMMUNICATION POLE TO REMAIN
DEMOLITION NOTES:
1. GENERAL INTENT IS THAT ALL NON-STRUCTURAL
ITEMS ARE TO BE DEMOLISHED. DRAWINGS SEEK TO
REPRESENT THE SCOPE AND RANGE OF DEMOLITION
REQUIRED BUT ARE NOT INTENDED TO BE INCLUSIVE
OF ALL NECESSARY WORK.
2. STRUCTURAL ITEMS TO REMAIN INCLUDE WOOD
FRAMING AND SHEATHING AT ROOF, WALL AND
FLOOR. COMPLETE DEMOLITION TO THE EXTERIOR
AND INTERIOR FACE OF RAFTER, JOIST, STUD OR
SHEATHING, TYPICAL. SEE STRUCTURAL FOR
SELECTIVE PIER DEMOLITION.
3. SEE ALSO STRUCTURAL (NOTES S0.1), MECHANICAL
(MD1.1), PLUMBING (PD1.1), ELECTRICAL (NOTES E0.1)
AND FIRE PROTECTION (FPD1.0) SHEETS FOR THE
FULL EXTENT OF DEMOLITION ACTIVITIES.
A A
C C
D21
D21
D21
D22
D24
D24
D24
D24
D25
D24
D24
D22
D22
D22 D22
D22 D22
D23
D23
D23 D23
D29
B B
A A
C C
D25
D26
D29
GWB CEILING TO BE REMOVED
LEGEND
ACT CEILING TO BE REMOVED
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:2
P
M
AD1.2
LM/JM
LM/JM
WS/LM
5/3/2023
MAIN FLOOR
DEMOLITION RCP &
ROOF PLAN
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
7 83
80 168
SCALE OF FEET
KEYNOTES
D21 REMOVE REMAINING ACT CEILING, GRID AND HOSTED
ELEMENTS THROUGHOUT; REMOVE ALSO GWB, FURRING
AND FOAM PRODUCTS TYP AT UNDERSIDE OF RAFTERS
D22 REMOVE REMAINING GWB CEILING AND HOSTED
ELEMENTS THROUGHOUT; REMOVE ALSO GWB, FURRING
AND FOAM PRODUCTS TYP AT UNDERSIDE OF RAFTERS
D23 ACT CEILING ALREADY REMOVED IN THIS ROOM - REMOVE
GWB, FURRING AND FOAM PRODUCTS TYP AT UNDERSIDE
OF RAFTERS
D24 REMOVE SOFFIT, FASCIA AND TRIM BACK TO STRUCTURAL
ROOF FRAMING
D25 REMOVE ROOF, ROOFING AND STRUCTURE OVER EAST
PLATFORM
D26 REMOVE EXISING ROOF COVERING, UNDERLAYMENTS,
SUBSTRATE AND OTHER RELATED ITEMS DOWN TO
SHEATHING, RE STRUCT
D29 EXISTING COMMUNICATION POLE TO REMAIN
SCALEAD1.2
1 MAIN FLOOR REFLECTED CEILING DEMOLITION PLAN
A
SCALEAD1.2
2 ROOF DEMOLITION PLAN
A
DEMOLITION NOTES:
1. GENERAL INTENT IS THAT ALL NON-STRUCTURAL ITEMS
ARE TO BE DEMOLISHED. DRAWINGS SEEK TO
REPRESENT THE SCOPE AND RANGE OF DEMOLITION
REQUIRED BUT ARE NOT INTENDED TO BE INCLUSIVE OF
ALL NECESSARY WORK.
2. STRUCTURAL ITEMS TO REMAIN INCLUDE WOOD FRAMING
AND SHEATHING AT ROOF, WALL AND FLOOR. COMPLETE
DEMOLITION TO THE EXTERIOR AND INTERIOR FACE OF
RAFTER, JOIST, STUD OR SHEATHING, TYPICAL. SEE
STRUCTURAL FOR SELECTIVE PIER DEMOLITION.
3. SEE ALSO STRUCTURAL (NOTES S0.1), MECHANICAL
(MD1.1), PLUMBING (PD1.1), ELECTRICAL (NOTES E0.1)AND
FIRE PROTECTION (FPD1.0) SHEETS FOR THE FULL
EXTENT OF DEMOLITION ACTIVITIES.
A3.2
A3.1
A3.1
A3.2
B 1
A4.1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
C
A4.1
A4.1
A4.2
N6
N33
N33
N33
N33
N32 N5
A4.2
N1
N1
N33
N16 N16N16N16N16
N16 N16 N16N16
N16
D29
N42
N42
N32
N5 N42 N42
N42
N42
N42
N42
N42
EXISTING CONCRETE TO REMAIN
LEGEND
EXISTING ASPHALT TO REMAIN
NEW FILL AT CRAWLSPACE - SLOPE
2% TYP TO DRAIN TO PERIMETER
GENERAL DIRECTION OF SLOPE TO
PERIMETER - CONTRACTOR TO
PROVIDE SHOP DRAWING BASED
ON SURVEY
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:4
P
M
A1.0
LM/JM
LM/JM
WS/LM
5/3/2023
CRAWLSPACE PLAN
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
8 83
80 168
SCALE OF FEET
SCALEA1.0
1 CRAWLSPACE PLAN
A
KEYNOTES
D29 EXISTING COMMUNICATION POLE TO REMAIN
N1 INSTALL FILL (TO MATCH LOCAL CONDITIONS) AT
CRAWLSPACE TO MEET <E> GRADES AT
PERIMETER - SLOPE FOR POSITIVE DRAINAGE
N5 INSTALL ELEVATED PLATFORM AT MECH UNITS,
REF: STRUCTURAL S1.1 - PLATFORM HT AT ELEV 13
FT (ABOVE SEA LEVEL) EXCEEDS BASE FLOOD
ELEVATION PLUS PROJECTED SEA LEVEL RISE
N6 RE-INSTALL RAMP ELEMENTS WHERE REMOVED
FOR CONSTRUCTION. PROVIDE NEW GUARDRAILS
AND HANDRAILS ON EXISTING POSTS, REF:
STRUCTURAL FOR CONNECTION TO BUILDING
N16 PREFINISHED METAL DOWNSPOUT AND CONCRETE
SPLASH BLOCK
N32 NEW MECH. EQUIPMENT REF: MECHANICAL
N33 NEW CONCRETE GRADE BEAM REF: STRUCTURAL
N42 NEW 2X10 CANE DETECTION GUARD, 27" MAX.
HEIGHT AT TOP OF GUARD
GENERAL NOTES:
1. REFER TO STRUCTURAL AND MEP SHEETS FOR
THE FULL SCOPE OF SYSTEMS SHOWN ON THESE
SHEETS
2. PROTECT STRUCTURAL ELEMENTS TO REMAIN
3. TERRAIN AND HARDSCAPES AS DEPICTED ARE
REPRESENTATIVE ONLY - CONTRACTOR TO
PROVIDE FIELD SURVEY OF ACTUAL CONDITIONS
4. CONTRACTOR TO PROVIDE SHOP DRAWING FOR
PROPOSED GRADING AT THE CRAWLSPACE /
UNDERSTORY FOLLOWING SLAB DEMOLITION
UP
WH
A3.2
A3.1
A3.1
A3.2
A5.1
B 1
A4.1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
C
VEST.
MECH
IT EQUIP
L STOR
S CHIEF
UNISEX
UNISEX
C/P
A4.1
A4.1
A4.2
SHARED
IT OFFICE
M CHIEF
L CHIEF
VEST.
R SHARED 1
R SHARED 2
BREAK
CONFERENCE
SUPER
PROP & PIV
A CHIEF
VEST.
A SHARED
T CHIEF
I CHIEF
116 115
106a
119118
113 112
111225 24 22
17 16 15 13
23 20
28 31 3529 30 32 33 34 01 02 03 04 06 07 09
100b
106b
117b
165' - 3" VIF
10' - 7" 10' - 11" 11' - 7" 11' - 11" 10' - 8" 11' - 0" 11' - 0" 11' - 2" 10' - 9" 11' - 0" 11' - 2" 10' - 7" 11' - 3" 10' - 10" 10' - 10"
V
IF 1
100a
N6
N10
N11 N11
N11
N11N12N12
N13
N17
N
N22N24 N25
N25
117a
N10
N25
N15
HALL
R STOR
JAN
N24
A6.1
S4
S5
S2
S3 S6
A7.1
A7.2
A7.2
S1
MOP
A6.2
A4.2
N14
N8
FEC FEC
FEC
F E
C
F E
C
/8
/4
/4
(EXISTING GARAGE)
/4
/4
A6.3
A6.3
D29
/2
6' - 5 3/8" 10' - 0 5/8"
17' - 3" 19' - 11 3/4" 12' - 3 1/2" 12' - 7 1/2" 12' - 4 7/8" 9' - 11 5/8" 9' - 9 3/4" 13' - 7 5/8" 21' - 3 3/8" 18' - 6" 6' - 9 3/4" 10' - 8 1/4"
16' - 6" 16' - 9" 8' - 0 1/4" 13' - 2 1/2" 7' - 7" 12' - 6" 5' - 4 5/8" 14' - 4 5/8" 8' - 4 1/4" 18' - 2 3/8" 16' - 9 1/8" 16' - 9 1/4" 10' - 10"
/8
NEW CERAMIC TILE
RE: FINISH SCHEDULE
FLOOR FINISH LEGEND
NEW LINOLEUM
RE: FINISH SCHEDULE
EXISTING WOOD DECKING TO BE
SALVAGED AS NEEDED AND
REINSTALLED AT RAMP
NEW WOOD DECKING
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:5
P
M
A1.1
LM/JM
LM/JM
WS/LM
5/3/2023
MAIN FLOOR PLAN
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
9 83
80 168
SCALE OF FEET
SCALEA1.1
1 MAIN FLOOR PLAN
A
KEYNOTES
D29 EXISTING COMMUNICATION POLE TO REMAIN
N6 RE-INSTALL RAMP ELEMENTS WHERE REMOVED FOR
CONSTRUCTION. PROVIDE NEW GUARDRAILS AND
HANDRAILS ON EXISTING POSTS, REF: STRUCTURAL FOR
CONNECTION TO BUILDING
N8 RECONSTRUCT NORTH STAIR AND DECK WITH NEW
MATERIALS ON <E> STRUCTURE - PROVIDE <N> GUARDRAILS
AND HANDRAILS, REF: STRUCTURAL FOR CONNECTION TO
BUILDING
N10 CONSTRUCT NEW EXTERIOR WOOD STAIR AND DECK ON <E>
STRUCTURE WITH <N> LAYOUT, GUARDRAILS AND HANDRAILS
N11 NEW EXTERIOR WALL ASSEMBLY OVER EXISTING STUDS, SEE
WALL TYPE 1
N12 NEW WINDOW OPENING IN HISTORIC LOCATION - FRAMING
CONDITION UNKNOWN, TYPICAL
N13 NEW WINDOW OPENING AT FORMER DOOR LOCATION.
MODIFY FRAMING AS REQUIRED REF: STRUCTURAL
N14 GENERATOR AND UTILITY-OWNED TRANSFORMER TO
REMAIN; PROTECT IN PLACE
N15 WORK AT ADJACENT GARAGE IS LIMITED TO REPAIR OF
EXTERIOR FINISHES RELATED TO DEMOLITION OF ROOF
CONNECTION
N17 AT&T EQUIPMENT REINSTALLED IN THIS LOCATION BY
OTHERS
N19 COUNTERTOP AND CABINETS REF: A6.2
N22 WATER BOTTLE FILLING STATION REF: PLUMBING
N24 4x6 TIMBER POST REF: STRUCTURAL; EXPOSED - STAIN
N25 POST AND TIE DOWN WITHIN WALL FRAMING, TYP AT
GRIDLINE REF: STRUCTURAL
1. PROTECT STRUCTURAL ELEMENTS TO REMAIN
2. REFER TO STRUCTURAL, MEP AND FIRE
PROTECTION SHEETS FOR THE FULL SCOPE OF
SYSTEMS SHOWN ON THESE SHEETS
3. VERIFY IN FIELD GRID DIMENSIONS AND
DIMENSIONS FOR STRUCTURAL ELEMENTS TO
REMAIN. ARCHITECTURAL DIMENSIONS ARE
FROM THE FACE OF STUDS U.O.N.
4. WINDOWS, DOORS AND STOREFRONT OCCUPY
EXISTING FRAMED OPENINGS U.O.N - VERIFY
OPENING DIMENSIONS IN FIELD
5. ALL INTERIOR WALLS ARE TYPE 2 U.O.N. REFER
TO WALL TYPE LEGEND ON G0.1
6. REFER TO FINISH SCHEDULE ON A6.2 FOR FLOOR
FINISHES
GENERAL NOTES:
A3.2
A3.1
A3.1
A3.2
A5.1
B B 1
A4.1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
C C
A4.1
A4.1
A4.2
N30
N28
N28
N31
N31
N31
N31
N31
N31
N26
N26
N26
N26
N26
A4.2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
A9.4
A9.4 O.H.
A9.4 D29
N28
N28
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:5
P
M
A1.2
LM/JM
LM/JM
WS/LM
5/3/2023
ROOF PLAN
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
10 83
80 168
SCALE OF FEET
SCALEA1.2
1 ROOF PLAN
A KEYNOTES
D29 EXISTING COMMUNICATION POLE TO REMAIN
N26 NEW PREFINISHED GUTTER AND
DOWNSPOUTS, RE: EXTERIOR ELEVATIONS
N28 INSTALL FIBER CEMENT FASCIA AT
PERIMETER OF ROOF
N30 NEW ROOFING ASSEMBLY: EPDM MEMBRANE
ROOFING OVER PROTECTION BOARD OVER
R-25 RIGID POLYISO INSULATION
N31 PROVIDE TAPERED POLYISO RIGID
INSULATION AT EAVES; ROOFING ASSEMBLY
OTHERWISE THE SAME
1. PROTECT REMAINING STRUCTURAL ELEMENTS
2. REFER TO STRUCTURAL AND MEP FOR THE FULL
SCOPE OF SYSTEMS SHOWN ON THESE SHEETS
3. ARCHITECTURAL DIMENSIONS ARE FROM THE
INSIDE FACE OF STUDS U.O.N.
ROOF GENERAL NOTES:
A5.1
B B 1
A4.1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
C C
A4.1
A4.1
A4.2
N4
A4.2
N3
N2
D29
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:5
P
M
A2.0
LM/JM
LM/JM
WS/LM
5/3/2023
CRAWLSPACE
REFLECTED CEILING
PLAN
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
11 83
80 168
SCALE OF FEET
SCALEA2.0
1 CRAWLSPACE REFLECTED CEILING PLAN
A
1. CEMENT BOARD ASSEMBLY AT UNDERSIDE OF
JOISTS THROUGHOUT - SEE KEYNOTES FOR FULL
ASSEMBLY
2. PROTECT STRUCTURAL ELEMENTS TO REMAIN
3. VERIFY IN FIELD DIMENSIONS OF STRUCTURAL
ELEMENTS
KEYNOTES
D29 EXISTING COMMUNICATION POLE TO REMAIN
N2 INSTALL AIR VAPOR BARRIER AND CEMENT BOARD
BEAM WRAP AT PERIMETER OF CRAWLSPACE
N3 INSTALL MINERAL WOOL BATT INSULATION
BETWEEN FLOOR JOISTS, TYP
N4 INSTALL CEMENTITIOUS SHEATHING, CLASS I
VAPOR RETARDER AND PROTECTION BOARD
BELOW JOISTS THROUGHOUT CRAWLSPACE
RCP GENERAL NOTES:
DC
DC
DC
DC
A5.1
B 1
A4.1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
C
A4.1
A4.1
A4.2
N29
N29
A4.2
N26
N26
N26
N26
N26
N28
N28 N28
D29
N29
N28
N29
N28
N29
N29
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:5
P
M
A2.1
LM/JM
LM/JM
WS/LM
5/3/2023
MAIN FLOOR
REFLECTED CEILING
PLAN
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
12 83
80 168
SCALE OF FEET
SCALEA2.1
1 MAIN FLOOR REFLECTED CEILING PLAN
A
1. PAINT EXPOSED RAFTERS, STRUCTURAL FASCIA
AND UNDERSIDE OF ROOF DECK AT EXTERIOR
2. REFER TO STRUCTURAL, MEP AND TECHNOLOGY /
SECURITY SHEETS FOR THE FULL SCOPE OF
SYSTEMS SHOWN ON THESE SHEETS
KEYNOTES
D29 EXISTING COMMUNICATION POLE TO REMAIN
N28 INSTALL FIBER CEMENT FASCIA AT PERIMETER
OF ROOF
RCP GENERAL NOTES:
LEGEND AND EXTERIOR FINISHES
FIBER CEMENT LAP SIDING WITH 8"
EXPOSURE AND TRIM - PAINT EXT1
EXISTING VINYL SIDING AT GARAGE
WOOD DECK, STAIR AND RAILING
ELEMENTS - STAIN EXT1
STAINLESS STEEL MESH AT
GUARDRAILS
WINDOW AND STOREFRONT FRAMES -
CLEAR ANODIZED ALUMINUM
WOOD STRUCTURAL ELEMENTS
ABOVE FLOOR LEVEL - PAINT EXT2
WOOD RAFTERS AND UNDERSIDE OF
ROOF DECK - PAINT EXT2
GUTTERS AND DOWNSPOUTS -
PREFINISHED METAL (TO MATCH SIDING)CRAWLSPACE
92' - 4"
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
B
A4.1
A C
N11
N10
117a
N15
N16
N18
1/2" 12"
1/2" 12"
N42
N43
N43
N16
CRAWLSPACE
92' - 4"
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A4.1
A4.1
A4.2
N11
N12N12
N6
A7.1
29 30
32 33 34
35 01 02 03 04 05 06 07 08 09
A4.2
N16
N16
N16
Padre Island National Seashore
Park Headquarters
20301 Park Road 22
N9
N18
N16 N16
N42 N42
N43
N43
N8N42
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:5
P
M
A3.1
LM/JM
LM/JM
WS/LM
5/3/2023
EXTERIOR ELEVATIONS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
13 83
80 168
SCALE OF FEET
KEYNOTES
N6 RE-INSTALL RAMP ELEMENTS WHERE REMOVED
FOR CONSTRUCTION. PROVIDE NEW GUARDRAILS
AND HANDRAILS ON EXISTING POSTS, REF:
STRUCTURAL FOR CONNECTION TO BUILDING
N8 RECONSTRUCT NORTH STAIR AND DECK WITH
NEW MATERIALS ON <E> STRUCTURE - PROVIDE
<N> GUARDRAILS AND HANDRAILS, REF:
STRUCTURAL FOR CONNECTION TO BUILDING
N9 EXISTING NPS BUILDING SIGNAGE TO BE
REINSTALLED IN SAME LOCATION. PROVIDE
STRUCTURAL WOOD BLOCKING AS REQUIRED TO
SUPPORT SIGNAGE
N10 CONSTRUCT NEW EXTERIOR WOOD STAIR AND
DECK ON <E> STRUCTURE WITH <N> LAYOUT,
GUARDRAILS AND HANDRAILS
N11 NEW EXTERIOR WALL ASSEMBLY OVER EXISTING
STUDS, SEE WALL TYPE 1
N12 NEW WINDOW OPENING IN HISTORIC LOCATION -
FRAMING CONDITION UNKNOWN, TYPICAL
N15 WORK AT ADJACENT GARAGE IS LIMITED TO
REPAIR OF EXTERIOR FINISHES RELATED TO
DEMOLITION OF ROOF CONNECTION
N16 PREFINISHED METAL DOWNSPOUT AND CONCRETE
SPLASH BLOCK
N18 AREA FOR WALL ENVELOPE ASSEMBLY MOCKUP
INDICATED BY DASHED LINE
N42 NEW 2X10 CANE DETECTION GUARD, 27" MAX.
HEIGHT AT TOP OF GUARD
N43 NEW FIBER CEMENT CORNER TRIM
SCALEA3.1
2 EAST ELEVATION
A
SCALEA3.1
1 NORTH ELEVATION
A
NOTE: WIRE MESH AT NEW GUARDRAILS SHOWN FOR
GRAPHIC REPRESENTATION ONLY. REF: DETAIL 4/A7.1
CRAWLSPACE
92' - 4"
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
12345678910111213141516
A4.1
A4.1
A4.2
N13
N10
N11
A7.2
11106a 12 13 14 15 16 17 18
20 21 22 23 24 25
N5
N32
A4.2
N14
N16 N16
N16
N16
N16
94' - 4"
N42 N42
N43 N43
N42 N42 N42
A9.2
N41
CRAWLSPACE
92' - 4"
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
B
A4.1
AC
N10
N11
N6
N14
N16
1/2" 12"
1/2" 12"
N42
N43
N16
N43
N42 N42
LEGEND AND EXTERIOR FINISHES
FIBER CEMENT LAP SIDING WITH 8"
EXPOSURE AND TRIM - PAINT EXT1
EXISTING VINYL SIDING AT GARAGE
WOOD DECK, STAIR AND RAILING
ELEMENTS - STAIN EXT1
STAINLESS STEEL MESH AT
GUARDRAILS
WINDOW AND STOREFRONT FRAMES -
CLEAR ANODIZED ALUMINUM
WOOD STRUCTURAL ELEMENTS
ABOVE FLOOR LEVEL - PAINT EXT2
WOOD RAFTERS AND UNDERSIDE OF
ROOF DECK - PAINT EXT2
GUTTERS AND DOWNSPOUTS -
PREFINISHED METAL (TO MATCH SIDING)
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:5
P
M
A3.2
LM/JM
LM/JM
WS/LM
5/3/2023
EXTERIOR ELEVATIONS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
14 83
80 168
SCALE OF FEET
A3.2
SOUTH ELEVATION1
A3.2
WEST ELEVATION2
KEYNOTES
N5 INSTALL ELEVATED PLATFORM AT MECH UNITS,
REF: STRUCTURAL S1.1 - PLATFORM HT AT ELEV 13
FT (ABOVE SEA LEVEL) EXCEEDS BASE FLOOD
ELEVATION PLUS PROJECTED SEA LEVEL RISE
N6 RE-INSTALL RAMP ELEMENTS WHERE REMOVED
FOR CONSTRUCTION. PROVIDE NEW GUARDRAILS
AND HANDRAILS ON EXISTING POSTS, REF:
STRUCTURAL FOR CONNECTION TO BUILDING
N10 CONSTRUCT NEW EXTERIOR WOOD STAIR AND
DECK ON <E> STRUCTURE WITH <N> LAYOUT,
GUARDRAILS AND HANDRAILS
N11 NEW EXTERIOR WALL ASSEMBLY OVER EXISTING
STUDS, SEE WALL TYPE 1
N13 NEW WINDOW OPENING AT FORMER DOOR
LOCATION. MODIFY FRAMING AS REQUIRED REF:
STRUCTURAL
N14 GENERATOR AND UTILITY-OWNED TRANSFORMER
TO REMAIN; PROTECT IN PLACE
N16 PREFINISHED METAL DOWNSPOUT AND CONCRETE
SPLASH BLOCK
N32 NEW MECH. EQUIPMENT REF: MECHANICAL
N41 NEW PANELS, REF: ELECTRICAL MOUNTED ABOVE
FLOOD ELEVATION TO GIRDER AND BRACES PER
STRUCTURAL
N42 NEW 2X10 CANE DETECTION GUARD, 27" MAX.
HEIGHT AT TOP OF GUARD
N43 NEW FIBER CEMENT CORNER TRIM
NOTE: WIRE MESH AT NEW GUARDRAILS SHOWN FOR
GRAPHIC REPRESENTATION ONLY. REF: DETAIL 4/A7.1
CRAWLSPACE
92' - 4"
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A4.1
A4.1
A4.2
VEST.
L STOR
R SHARED 1
R SHARED 2
I CHIEF
N30
N11N11
N4 N33N1
1 1
2 22
R STOR
A4.2
A5.1
HALL
N33N33N33N33
B
A4.1
A C A5.1
R SHARED 1
IT OFFICE
N33
N4
N11
N30
N11
N1
B
A
HALL
A5.2
1/2" 12"
1/2" 12"
94' - 4"
CRAWLSPACE
92' - 4"
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
B
A4.1
A C
VEST.
N4
N11
N30
N1
HALL
C/P
A5.2
6 7/8"
N9
1/2" 12"
1/2" 12"
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: B
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:0
P
M
A4.1
LM/JM
LM/JM
WS/LM
5/3/2023
BUILDING SECTIONS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
15 83
80 168
SCALE OF FEET
SCALEA4.1
1 BUILDING SECTION E-W
A
SCALEA4.1
3 SECTION N-S NEAR GRID 5
BSCALEA4.1
2 BUILDING SECTION N-S NEAR GRID 10
B
KEYNOTES
N1 INSTALL FILL (TO MATCH LOCAL CONDITIONS) AT
CRAWLSPACE TO MEET <E> GRADES AT
PERIMETER - SLOPE FOR POSITIVE DRAINAGE
N4 INSTALL CEMENTITIOUS SHEATHING, CLASS I
VAPOR RETARDER AND PROTECTION BOARD
BELOW JOISTS THROUGHOUT CRAWLSPACE
N9 EXISTING NPS BUILDING SIGNAGE TO BE
REINSTALLED IN SAME LOCATION. PROVIDE
STRUCTURAL WOOD BLOCKING AS REQUIRED TO
SUPPORT SIGNAGE
N11 NEW EXTERIOR WALL ASSEMBLY OVER EXISTING
STUDS, SEE WALL TYPE 1
N30 NEW ROOFING ASSEMBLY: EPDM MEMBRANE
ROOFING OVER PROTECTION BOARD OVER R-25
RIGID POLYISO INSULATION
N33 NEW CONCRETE GRADE BEAM REF: STRUCTURAL
40 84
SCALE OF FEET
GENERAL NOTES:
1. REFER TO STRUCTURAL AND MEP SHEETS FOR
THE FULL SCOPE OF SYSTEMS SHOWN ON THESE
SHEETS
2. PROTECT STRUCTURAL ELEMENTS TO REMAIN
3. TERRAIN AND HARDSCAPES AS DEPICTED ARE
REPRESENTATIVE ONLY - CONTRACTOR TO
PROVIDE FIELD SURVEY OF ACTUAL CONDITIONS
4. CONTRACTOR TO PROVIDE SHOP DRAWING FOR
B
A4.1
A C
A SHARED
VEST.
N11
N11
N30
N4
N10
N1
HALL
105 104
1/2" 12" 1/2"
12" 1/2"
12"
N16
N16
CRAWLSPACE
92' - 4"
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
B
A4.1
A C
PROP & PIV
CONFERENCE
HALL
N1
1/2" 12"
1/2" 12"
N30
N4 N8
N16 N16
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:0
P
M
A4.2
LM/JM
LM/JM
WS/LM
5/3/2023
BUILDING SECTIONS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
16 83
40 84
SCALE OF FEET
SCALEA4.2
1 SECTION N-S NEAR GRID 15
ASCALEA4.2
2 SECTION N-S NEAR GRID 12
A
KEYNOTES
N1 INSTALL FILL (TO MATCH LOCAL CONDITIONS) AT
CRAWLSPACE TO MEET <E> GRADES AT PERIMETER - SLOPE
FOR POSITIVE DRAINAGE
N4 INSTALL CEMENTITIOUS SHEATHING, CLASS I VAPOR
RETARDER AND PROTECTION BOARD BELOW JOISTS
THROUGHOUT CRAWLSPACE
N8 RECONSTRUCT NORTH STAIR AND DECK WITH NEW
MATERIALS ON <E> STRUCTURE - PROVIDE <N> GUARDRAILS
AND HANDRAILS, REF: STRUCTURAL FOR CONNECTION TO
BUILDING
N10 CONSTRUCT NEW EXTERIOR WOOD STAIR AND DECK ON <E>
STRUCTURE WITH <N> LAYOUT, GUARDRAILS AND
HANDRAILS
N11 NEW EXTERIOR WALL ASSEMBLY OVER EXISTING STUDS, SEE
WALL TYPE 1
N16 PREFINISHED METAL DOWNSPOUT AND CONCRETE SPLASH
BLOCK
N30 NEW ROOFING ASSEMBLY: EPDM MEMBRANE ROOFING OVER
PROTECTION BOARD OVER R-25 RIGID POLYISO INSULATION
GENERAL NOTES:
1. REFER TO STRUCTURAL AND MEP SHEETS FOR
THE FULL SCOPE OF SYSTEMS SHOWN ON THESE
SHEETS
2. PROTECT STRUCTURAL ELEMENTS TO REMAIN
3. TERRAIN AND HARDSCAPES AS DEPICTED ARE
REPRESENTATIVE ONLY - CONTRACTOR TO
PROVIDE FIELD SURVEY OF ACTUAL CONDITIONS
4. CONTRACTOR TO PROVIDE SHOP DRAWING FOR
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
<N> FIBER CEMENT LAP SIDING
PRE-PAINTED BOTH SIDES AND
ENDS, SECURED TO FURRING
(2) <N> LAYERS 1.5-INCH CONTINUOUS
POLYISO RIGID INSULATION WITH
CLASS 1 SELF-ADHERING AIR/VAPOR
BARRIER (AVB) BETWEEN LAYERS
<N> FINISH FLOOR PER FINISH
SCHEDULE OVER <E> WOOD
FLOOR SHEATHING
<N> FULLY ADHERED EPDM ROOFING
SYSTEM, PROTECTION BOARD, AND
CONTINUOUS R25 POLYISO ROOF
INSULATION (IN TWO LIFTS)
<N> IMPACT RESISTANT WINDOWS
IN EXISTING OPENINGS (TYP)
<N> FIBER CEMENT FASCIA ON
<N> OR <E> STRUCTURAL SUBFASCIA -
PAINT
EXPOSED <E> FRAMING AND ROOF
DECK AT BUILDING INTERIOR - PAINT
<N> MR INTERIOR GWB AT <E>
STUD WALL - PAINT
A9.4
C
<E> DIAGONAL BOARD
SHEATHING AND STUD WALL
FRAMING TO REMAIN
<N> MINERAL WOOL BATT WALL
INSULATION FULL DEPTH OF <E>
STUD FRAMING
<N> 1X3 TREATED WOOD VERTICAL
FURRING STRIPS 16-IN OC FASTENED
TO <E> STUDS PER NOTES
<N> TAPERED POLYISO ROOF
INSULATION AT EAVE, TYP
A9.2
A9.2
A9.1
EXPOSED <E> RAFTERS AND ROOF
DECK (NO SOFFIT) - PAINT
<N> WD TRIM AT INTERIOR OF
WINDOWS - STAIN
<N> CEMENT PANEL, AIR / VAPOR
BARRIER AND PROTECTION BOARD
AT UNDERSIDE OF <E> JOISTS
<N> MIN. R30 MINERAL WOOL BATT
DEPTH 9-1/4 IN, BETWEEN <E>
FLOOR JOISTS
<N> PREFINISHED MTL GUTTER
WHERE INDICATED ON ROOF PLAN
TAPE ALL JOINTS IN <N> PLYWOOD
ROOF DECK WITH SELF ADHERED 4
INCH BITUMINOUS FLASHING TO
PROVIDE AN AIR TIGHT BARRIER
<N> DRIP EDGE FLASHING AT
BASE OF WALL - LAP AIR/VAPOR
BARRIER PER DETAIL
<N> CEMENT PANEL AND AIR /
VAPOR BARRIER AT INSIDE AND
UNDERSIDE OF <E>TIMBER BEAM
<E> PIER BEYOND - RE: STRUCTURAL
PROVIDE SLEEVE AND AIR
BARRIER SEALANT AT ALL
PENTRATIONS, TYP
A9.2
A9.2
A9.4
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
A9.4
EXTERIOR WALL ENVELOPE
ASSEMBLY PER 1/A5.1
<N> FINISH FLOOR PER
FINISH SCHEDULE OVER <E>
WOOD SHEATHING
<N> FIBER CEMENT FASCIA ON
<E> OR <N> STRUCTURAL
SUBFASCIA - PAINT
EXPOSED <E> OUTRIGGERS,
FRAMING AND ROOF DECK (NO
SOFFIT) - PAINT
<N> ADDITIONAL BLOCKING
BETWEEN OUTLOOKERS
<N> FULLY ADHERED EPDM
ROOFING SYSTEM, PROTECTION
BOARD, AND CONTINUOUS R25
POLYISO ROOF INSULATION (IN
TWO LIFTS)
EXPOSED ,<E> FRAMING AND
ROOF DECK AT BUILDING
INTERIOR - PAINT
TAPE ALL JOINTS IN <N> PLYWOOD
DECK WITH SELF ADHERED 4 INCH
BITUMINOUS FLASHING TO
PROVIDE AN AIR TIGHT BARRIER
NEW MR INTERIOR
GWB - PAINT
<N> R30 MINERAL WOOL BATT
BETWEEN <E> JOISTS
MODIFY <N> INSULATION TO NOTCH
AROUND <E> 2X LEDGER
AT UNDERSIDE OF <E> DECK,
NOTCH <N> SIDING AROUND JOIST
FOR A TIGHT FIT- PROVIDE
CONTINUOUS SEALANT AT JOIST
<N> 2X DECKING ON EXISTING JOISTS
REF: A7.2
<N> CEMENT PANEL, AIR / VAPOR
BARRIER AND PROTECTION BOARD
AT UNDERSIDE OF <E> JOISTS
<N> CEMENT PANEL AND AIR /
VAPOR BARRIER AT INSIDE AND
UNDERSIDE OF <E>TIMBER BEAM
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:0
P
M
A5.1
LM/JM
LM/JM
WS/LM
5/3/2023
WALL SECTIONS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
17 83
SCALEA5.1
1 WALL SECTION AT WINDOW TYP
A
10 2 31
SCALE OF FEET
SCALEA5.1
2 WALL SECTION AT EAST DECK
T.O. PLATE
108' - 10"
B
<N> LVL RIDGE BEAM AND
CONNECTORS RE:
STRUCTURAL
RAFTERS OVERLAP
AT RIDGE
825 SF
HALL
PAINT EXPOSED RAFTERS
SPIRAL DUCTING REF:
MECHANICAL
LIGHTING FIXTURES REF:
ELECTRICAL
CONTINUE <N> GWB TO
UNDERSIDE OF ROOF DECK
BETWEEN RAFTERS -
PROVIDE ACOUSTIC
SEALANT
<N> BLOCKING FOR GWB
ATTACHMENT ON EA SIDE OF
STRUCTURAL RIDGE BLOCKING
<N> POST BASE (REF:
STRUCTURAL) CONCEALED
IN WALL AT PIER LOCATIONS
<N> LINOLEUM FLOORING PER
FINISH SCHEDULE
<E> DIAGONAL SHEATHING AT
SUBFLOOR
INTERIOR INTERIOR
CONTINUOUS ADHERED
AIR/VAPOR BARRIER SIMILAR
TO DETAILS 1/A9.1 (AT PIERS)
AND 2/A9.2 (BETWEEN PIERS)
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
C
A9.3
A9.3
107' - 2 1/2"
EXTERIOR WALL ENVELOPE
ASSEMBLY PER 1/A5.1
NEW FINISH FLOOR PER
FINISH SCHEDULE OVER <E>
WOOD SHEATHING
<N> FULLY ADHERED EPDM
ROOFING SYSTEM, PROTECTION
BOARD, AND CONTINUOUS R25
POLYISO ROOF INSULATION -
SEE 2/A9.5 FOR SIMILAR
CONDITION DETAIL
NEW INTERIOR GWB
EXPOSED <E> RAFTERS, PAINT
CONTINUE GWB TO
UNDERSIDE OF DECK
<N> TAPERED
INSULATION AT EAVE, TYP
SF01
<N> PT 2X6 DECKING ON
PT 1X SLEEPERS ON <E>
JOISTS REF: A7.1
<N> CEMENT PANEL, AIR / VAPOR
BARRIER AND PROTECTION BOARD
AT UNDERSIDE OF <E> JOISTS
<N> R30 MINERAL WOOL BATT
BETWEEN <E> JOISTS
MODIFY <N> INSULATION TO NOTCH
AROUND <E> 2X LEDGER
AT UNDERSIDE OF <E> DECK,
NOTCH <N> SIDING AROUND
JOIST FOR A TIGHT FIT- PROVIDE
CONTINUOUS SEALANT AT JOIST
INTERIOR EXTERIOR
<N> CEMENT PANEL AND AIR /
VAPOR BARRIER AT INSIDE AND
UNDERSIDE OF <E> TIMBER BEAM
<N> GUARDRAIL AND
HANDRAILS <E> POSTS
PER A7.1
<E> POST AND BEAM TO
REMAIN - PAINT, REF:
STRUCTURAL FOR <N> CAP
AND TIEDOWNS
<N> MIN INSULATION AT PORCH
ROOF TO MAINTAIN <E> SLOPE
1/2" / 12"
1 1/2" / 12"
1/2" / 12"
<E> PARK SIGNAGE
INSTALLED ON
STRUCUTRAL BLOCKING
<E> DECK STRUCTURE TO
REMAIN
BREAK METAL AT JAMB
TO MATCH STOREFRONT
FINISH PER 5/A9.3
<N> FIBER CEMENT FASCIA ON
<E> OR<N> STRUCTURAL
SUBFASCIA - PAINT
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:0
P
M
A5.2
LM/JM
LM/JM
WS/LM
5/3/2023
WALL SECTIONS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
18 83
10 2 31
SCALE OF FEET
SCALEA5.2
2 WALL SECTION - INTERIOR AT GRID B
A SCALEA5.2
1 WALL SECTION AT NORTH ENTRY
8 9 10
A A
171819
108 SF
MECH
74 SF
UNISEX
74 SF
UNISEX
123 SF
C/P
825 SF
HALL
11' - 2" 10' - 9"
3' - 1 3/8" 6' - 10 1/4" 4' - 3 3/4" 5' - 6" 5' - 3"
A6.1
A6.1
A6.34
N35N35
N40
N37N37
N40
N39N39
N36N36
/2
/8
N22
3 3
N38 N38
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
N39
PAINT-5
STAIN-1
CT-2
STAIN-2
A
PAINT-5
CT-2
STAIN-2
N38
N40
N37
PAINT-5
STAIN-2
CT-3
CT-2
A
N39
N40
N37
N36
PAINT-5
STAIN-2
CT-2
CT-3
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
N39
PAINT-5
STAIN-2
CT-2
STAIN-1
A
N39N36
N37
N40
PAINT-5
CT-3
CT-2
N40
N37
PAINT-5
CT-3
CT-2
N27
A
N38
PAINT-5
CT-2
STAIN-2
FRONT
VIEW
SIDE
VIEW
FRONT
VIEW
SIDE
VIEW
(1
M
IN
(4
M A
X
(4
M
IN
(4
M A
X
FRONT
VIEW
SIDE
VIEW
KEEP 1 1/2" AREA
BELOW BAR CLEAR
(3
M
IN
(3
M A
X
FRONT
VIEW
(4
M
IN
(4
M A
X
SIDE
VIEW
FRONT
VIEW
WALL
MOUNTED
SINK
(3
M A
X
(4
M A
X
R
IM
O F
S
IN
K
B O
T T
M
IR
R O
R
R
IM
IN
K
B O
T T
IR
R O
R
ACCESSIBLE FLOOR
MOUNTED TOILET
SIDE
VIEW
FRONT
VIEW
TOP OF SEAT
(1
M
IN
(1
M A
X
ACCESSIBLE
WALL MOUNTED
LAVATORY
PROVIDE
UNDER
LAVATORY
PLUMBING
PROTECTION
KEEP 18"
AREA
ABOVE
BAR
CLEAR
ACCESSIBLE
WALL
MOUNTED
RECEPTACLE
SIDE
VIEW
TP DISPENSER GRAB BARS SOAP DISPENSER
PAPER HAND
TOWEL DISPENSER
ELEVATION
RM#
EDGE OF
DOOR
1' - 0" CL
TACTILE SIGNAGE WITH RAISED
CHARACTERS & BRAILLE
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: B
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:0
P
M
A6.1
LM/JM
LM/JM
WS/LM
5/3/2023
ENLARGED PLANS &
INTERIOR ELEVATIONS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
19 83SCALEA6.1
1 MAIN FLOOR ENLARGED PLAN - RESTROOMS
B
SCALEA6.1
2 UNISEX 110 - NORTH
ASCALEA6.1
3 UNISEX 110 - EAST
ASCALEA6.1
4 UNISEX 110 - SOUTH
ASCALEA6.1
5 UNISEX 110 - WEST
A
SCALEA6.1
6 UNISEX 111 - NORTH
ASCALEA6.1
7 UNISEX 111 - EAST
ASCALEA6.1
8 UNISEX 111 - SOUTH
ASCALEA6.1
9 UNISEX 111 - WEST
A
KEYNOTES
N22 WATER BOTTLE FILLING STATION REF: PLUMBING
N27 CERAMIC TILE TO 48" MIN. AFF AND CERAMIC TILE
BASE
N35 CERAMIC TILE FLOORING
N36 NEW WALL MOUNTED MIRROR, INSTALL PER ABA
STANDARDS AND MANUFACTURERS
INSTRUCTIONS
N37 NEW SURFACE MOUNTED TOILET PAPER
DISPENSER, PROVIDED BY PARK, INSTALLED BY
CONTRACTOR PER ABA STANDARDS AND
MANUFACTURERS INSTRUCTIONS
N38 NEW SURFACE MOUNTED PAPER TOWEL
DISPENSER, PROVIDED BY PARK, INSTALLED BY
CONTRACTOR PER PER ABA STANDARD AND
MANUFACTURERS INSTRUCTIONS
N39 NEW SURFACE MOUNTED MOUNTED SOAP
DISPENSER, PROVIDED BY PARK, INSTALLED BY
CONTRACTOR PER ABA STANDARDS AND
MANUFACTURERS INSTRUCTIONS
N40 NEW GRAB BARS AND IN-WALL BLOCKING, INSTALL
PER ABA STANDARDS AND MANUFACTURERS
INSTRUCTIONS
N.T.S.
TYP. TOILET ROOM ACCESSORY ELEVATIONS
20 42
SCALE OF FEET
1. TYP WALLS: MR GYPSUM BOARD,
PAINTED, WOOD OR RUBBER BASE
2. RESTROOM WALLS: CERAMIC TILE ON
BACKERBOARD TO HEIGHT OF 5 FT,
PAINT ABOVE, COVE TILE BASE
3. ALL INTERIOR PARTITIONS EXTEND TO
UNDERSIDE OF ROOF DECK
4. CEILING IS EXPOSED: PAINT RAFTERS
AND UNDERSIDE OF ROOF DECK
5. INTERIOR TRIM: STAINED WOOD U.O.N
6. DOOR FRAMES: PREFINISHED
ALUMINUM
INTERIOR FINISH NOTES:
40 84
SCALE OF FEET
SCALE
TACTILE SIGNAGE LEGEND
T.O. PLATE
108' - 10"
<N> WOOD
BASE - STAIN 1
<E> WOOD
RAFTERS - PAINT-6
<E> WOOD SHEATHING -
PAINT-6
<N> LINOLEUM
FLOORING
STAINED WOOD
DOOR IN PREFIN
ALUM DOOR
FRAME
MR GWB AT
WALLS - PT
PER SCHED
MR GWB AT
WALLS - PT
PER SCHED
<N> WOOD
BASE - STAIN-1
<E> WOOD
RAFTERS - PAINT-6
<N> LINOLEUM
FLOORING PER
SCHEDULE
<N> WOOD TRIM AT
WINDOWS - STAIN-1
<N> WOOD BASE -
STAIN-1
<E> WOOD
RAFTERS - PAINT-6
<E> WOOD
SHEATHING - PAINT-6
MR GWB AT
WALLS - PT
PER SCHED
<N> LINOLEUM
FLOORING PER
SCHEDULE
MR GWB AT
WALLS - PT
PER SCHED
<N> WOOD
BASE - STAIN-1
<E> WOOD
RAFTERS - PAINT-6
<N> LINOLEUM
FLOORING PRE
SCHEDULE
MAIN LEVEL
100' - 0"
T.O. PLATE
108' - 10"
C
FEC
MR GWB AT
WALLS - PT
PER SCHED
<N> WOOD
BASE - STAIN-1
<E> WOOD
RAFTERS - PAINT-6
<N> LINOLEUM
FLOORING PER
SCHEDULE
<E> WOOD
SHEATHING - PAINT-6
MR GWB AT
WALLS - PT PER
SCHED
<N> WOOD
BASE - STAIN-1
<E> WOOD
RAFTERS - PAINT-6
<N> LINOLEUM
FLOORING PER
SCHEDULE
<E> WOOD
SHEATHING - PAINT-6
<N> WOOD TRIM AT
WINDOWS - STAIN-1
INSTALL WALL TILE OVER 1/4" CTBB
TO UNDERSIDE OF WALL CABINET
ABOVE FINISH OF WALL TILE TO
ALIGN WITH BACKSPLASH FINISH
GFI RECEPTACLE,
RE: ELECTRICAL
BC
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SCALE: A
SHEET
OF
B
IM
/2
-5
N
P S
P A
IS
R e h a b H
Q S
D -C
D /2
N P
S P
A
IS
R E
H A
B H
Q .r v t
/1
/2
:2
:0
P
M
A6.2
LM/JM
LM/JM
WS/LM
5/3/2023
FINISH SCHEDULE &
INTERIOR ELEVATIONS
PADRE ISLAND NATIONAL SEASHORE
REHABILITATION OF PARK HQ BUILDING
306809
180451
20 83
SCALEA6.2
4 TYP. OFFICE - NORTH
ASCALEA6.2
5 TYP. OFFICE - EAST
ASCALEA6.2
6 TYP. OFFICE - SOUTH
ASCALEA6.2
7 TYP. OFFICE - WEST
A
1. TYP WALLS: MR GYPSUM BOARD,
PAINTED, WOOD OR RUBBER BASE
2. RESTROOM WALLS: CERAMIC TILE ON
BACKERBOARD TO HEIGHT OF 5 FT,
PAINT ABOVE, COVE TILE BASE
3. ALL INTERIOR PARTITIONS EXTEND TO
UNDERSIDE OF ROOF DECK
4. CEILING IS EXPOSED: PAINT RAFTERS
AND UNDERSIDE OF ROOF DECK
5. INTERIOR TRIM: STAINED WOOD U.O.N
6. DOOR FRAMES: PREFINISHED
ALUMINUM
INTERIOR FINISH NOTES:
FINISH SCHEDULE
RM NO ROOM NAME FLOOR BASEBOARD NORTH WALL EAST WALL SOUTH WALL WEST WALL CEILING
100 VEST. CT-1 WOOD BASE - STAIN -1 PAINT - 1 PAINT - 1 PAINT - 1 PAINT - 1 PAINT - 6