This document contains a set of Requests for Information (RFIs) and the corresponding answers provided by the Government for solicitation 140P1324R0001 for the Rehabilitation of the Headquarters Building at Padre Island National Seashore. The key details are:

The solicitation is for the rehabilitation of the Park Headquarters Building at Padre Island National Seashore. The RFIs cover topics such as the fire sprinkler and alarm systems, electrical conduits, quality control requirements, contractor parking and laydown areas, and roof conditions. The Government provides responses to each of the RFIs, clarifying details about the project requirements. For example, the project does not require a new fire sprinkler system or fire alarm system, and the Contractor is responsible for removing furniture and debris prior to the start of construction. The Government also notes that a continuous air/vapor barrier is required for the entire building envelope and that percentages of assumed replacement for deteriorated roof deck, floor sheathing, and structural elements are provided in the drawings.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Padre Island National Seashore RFP 140P1324R0001 Rehabilitate Headquarters Building Amendment 0001 – RFIs and RFI Answers Issued:6/20/2024 All RFIs received following the instructions in the solicitation by the due date and time specified are in this document along with answers provided by the Government.

1. Fire Sprinkler - Will there be any requirement for a forward flow for the new backflow preventor?

a. There is no requirement for a fire sprinkler system in this project (see Drawings sheet G.03). The existing fire sprinkler system is to be demolished in its entirety (see Drawings sheets FPD1.0 and FPD1.1). A new clean agent fire extinguishing system serving only IT Equipment Room 113 is required (see Drawings sheets FP1.1 and FP4.0 and Project Specifications section 21 2200).

2. Fire Sprinkler – Is Corpus Christi Fire Department acting as the Authority Having Jurisdiction (AHJ) for this project? Will we submit the design through them of approval and testing?

a. Rodney Ryalls, NPS Intermountain Region Deputy Regional Fire Marshal will serve as the Fire Code Official (FCO) / Authority Having Jurisdiction (AHJ) for this project.

3. Fire sprinkler system is currently using copper piping, will this be required for the new installation, or will other options be available for use? (Black and or galvanized, CPVC)

a. See answer to RFI #1, above. Piping for the new clean agent fire extinguishing system serving IT Equipment Room 113 shall be stainless steel per the Drawings and Project Specifications.

4. Is there any available as-built drawings of the fire sprinkler system?

a. NPS does not have as-built drawings for the existing fire sprinkler system.

5. Fire Sprinkler - No underground work is required for this project. Work to start 1-0’ stub up from the water supply?

a. See answer to RFI #1.

6. Can the new electrical feeder conduits be suspended from the building structure in lieu of being installed underground? This eliminates electrical excavation underneath the building.

a. No.

7. Fire Alarm – Will the new fire alarm panel need to be monitored by a 24hr 3rd-party unit or will it be facilitated by the local onsite team?

a. There is no requirement for a fire alarm system in this project (see Drawings sheet G.03). The existing fire alarm system is to be demolished in its entirety (see Drawings sheets FPD1.0 and FPD1.1).

8. Is there an active Fire Alarm system that this building will tie into, and if so, what is the existing system and what is the existing monitoring company?

a. See answer to RFI #7.

9. Fire Alarm – Will there be any dedicated sleeping quarters inside this project?

a. No.

10. Will there be any specifications of a brand or requirement on the main fire alarm panel?

a. See answer to RFI #7.

11. Fire Alarm – Is there any available as-build drawings of the fire alarm system?

a. NPS does not have as-built drawings for the existing fire alarm system.

12. Will the Government entertain extending the questions deadline?

a. At this time the Government is not entertaining extending the deadline for questions; however, if a contractor has a technical question arise past the due date and time for RFIs, they are encouraged to submit it via email to brian_dankmeyer@nps.gov. Questions received after the due date for RFIs may or may not be answered in an amendment to the solicitation. If the Government reviews the question and feel it uncovers something critical and important to the requirement or drawings that needs to be addressed, the answer to a questions of that caliber will be posted in an amendment to the solicitation exclusively on www.sam.gov for all. Questions that the Government receives that it deems not critical to the requirement shall not be answered in any way to anybody to ensure procurement integrity is in accordance with the FAR.

13. Sheet A1.0 Keynote N1 says to install fill to match local conditions at crawlspace. What type of fill will be required to match local conditions?

a. A geotechnical report is included as Appendix B to the Division 01 Project Specifications. Existing soil conditions and the requirements for select fill are outlined therein.

14. On sheet A1.O Keynote N1 it shows to install fill to match local conditions At Crawl space. What kind of fill is local conditions exactly?

a. See answer to RFI #13.

15. Sheet A5.01 Typical Concrete Details. #4 detail is a slab on grade joint detail. Is there slab on grade work?

a. The detail referenced in this question appears on Drawings sheet S5.01. The project scope includes elevated 8” reinforced concrete pads for exterior mechanical units south of the building and 6” reinforced slab-on-grade pads for exterior electrical units west of the building. Refer to Drawings sheet S1.1.

16. Sheet A9.1 detail #1. What is the type and thickness of the vapor barrier?

a. The requirements for the continuous air/vapor barrier are in the Project Specifications, section 07 2713 – Modified Bituminous Sheet Air Barriers.

17. Sheet A9.1 detail #1. What is the type and thickness of the protection board?

a. The requirements for the fiber cement siding and trim are in the Project Specifications, section 07 4646 – Fiber Cement Siding.

18. On sheet A9.1 Detail # 1 on Vapor Barrier does not show what mil. What kind of protection board is it and what is the thickness? What kind of Cement Board is it and what is the thickness?

a. See answers to RFI #16 and RFI #17.

19. Detail 2 on Sheet A9.4 includes a note to "Continue Air/Vapor Barrier Deck Aligned with Wall Turn to Overlap Protection and New Sheathing." Will this requirement in the detail only be required above the exterior wall? Please advise.

a. Due to the hot and humid climate, the design intent is to ensure a continuous air/vapor barrier for the entire building envelope. Detail 2/A9.4 shows how this is to be accomplished at the roof overhang (north and south elevations) and detail 1/A9.4 shows how this is to be accomplished at the roof rake condition (east and west elevations). These details apply to the where the top of the exterior walls intersect the roof, not where the top of interior walls intersect the roof.

20. Will the Government be responsible for removing, storing, and reinstalling furniture and the like currently in the building prior to construction and after completion of construction?

a. The park shall be responsible for removing furniture and stored items prior to construction Notice to Proceed (NTP).

21. Please confirm that all equipment and material will be removed by others from the building and the crawlspace prior to NTP. Any remaining debris should be disposed of as required by law during demolition.

a. See answer to RFI #20.

22. During the site walk the Government stated that there was a video created by the Government of the existing building that was included with the solicitation. I don't find that video. Can you direct me where to find that video?

a. The video that was created by the government of the existing building that published was not in the solicitation but in the sources sought portion of the requirement on 12/5/2023. The video can be accessed through this link it is the MP4 file https://sam.gov/opp/893aae24218b4650890d1c8e0e2bcb62/view.

23. Specification section 01 31 00 - Project Management & Coordination, specifically Section 1.6, requires the Contractor to "Use the project website for communication throughout the contract period." The contract documents do not appear to identify what electronic format the Contractor is to use. Will this website access be proprietary and require a fee or subscription for the Contractor to participate?

a. Required file formats for electronic submittals are outlined in the Project Specifications, section 01 3323 – Submittal Requirements. The Construction Management Representative (CMR) hired by NPS will select a web-based project management software that will be used during the contract period and will provide access at no additional cost to the Contractor.

24. Specification Section 01 35 23, 1.4 - Safety Requirements requires a "Site Safety Supervisor." Can this Site Safety Supervisor also be the Site Superintendent or QC Manager as a "dual hat?"

a. The designated Site Safety Supervisor may perform other duties such as Project Superintendent. The Quality Control Supervisor may not perform other duties (see answer to RFI #26).

25. Can the Project Superintendent be the Site Safety and Health Officer? Dual Hat Position?

a. See answer to RFI #24.

26. Specification Section 01 40 00, 1.5, B. - Quality Requirements appears to have a discrepancy. Line 1 says the, "Contractor's Quality Control Supervisor may also perform other duties," while Line 2 says, "Contractor's Quality Control Supervisor shall be assigned no other duties." Please clarify which is the required. Line 3 of that same section states, "Contractor's designated Quality Control Supervisor shall be on the project site whenever contract work is in progress." Will this be required?

a. There is indeed a discrepancy in the project specifications. In Section 01 4000 – Quality Requirements, omit/disregard 1.5 B line 1 and retain lines 2, 3, and 4. The Contractor’s Quality Control Supervisor may not perform other duties and will be required to be on site whenever contract work is in progress.

27. Specification Section 01 50 00, 2.2, B. - Temporary Facilities & Controls requires that the Contractor provide a "Contracting Officers Field Office" that is separate of the Contractor's office. Is this separate field office required? At the site walk I understood that the Contracting Officer for the project was working off site. Please confirm.

a. The Contracting Officer and the Contract Specialist whom shall form and administer any resulting construction contract, are remote National Park Service Employees that do not require any trailers onsite to be used as a field office for this project. Construction contractors may elect to establish and erect a Field Office for themselves on site, however, if the construction contractor had no need for a construction trailer/ field office, they are not required to provide one. For example, a contractor may elect to forgo a construction trailer/field office with electrical and hardline hookups if they have other means they prefer such as a vehicle that will create a work environment that is suitable for them to successfully execute the requirement.

28. Please confirm the entire parking lot to the “west” of the building will be made available for the contractor laydown yard.

a. Refer to Drawings sheet G.02 for designated staging areas. NPS access must be maintained where indicated in this diagram.

29. With the minimum area available will subcontractors be allowed to park in the grass around the project entrance, or will contractor be required to provide a temporary fenced area for additional parking?

a. Disturbance of vegetated areas will be limited. Some parking in the Maintenance Area lot will be made available to the Contractor and additional parking exists in the Malaquite Visitor Center lot approximately 1.5 miles to the south. As indicated in the Drawings, Contractor parking is to be coordinated with the COR and may be required to adjust seasonally based on park needs. Unlike construction staging areas, areas dedicated only to the parking of Contractor vehicles will not need to be fenced. Refer to Drawings sheet G.02 and Project Specifications section 01 1100, Item 1.3 – Contractor Use of Site.

30. As discussed during the site visit, please provide pictures of the roof.

a. Photographs of the existing roof are not available.

31. As discussed during the site visit, please provide information providing existing roof layer samples.

a. The existing roof assembly consists of 1x decking over 2x10 wood rafters. Below the decking, there is batt insulation between the rafters. Above the decking, there is a membrane roof that is at least 10 years old. There is assumed to be a layer of rigid insulation underneath the membrane roof, but this has not been confirmed by sampling.

32. As discussed during the site visit, please provide any documentation of reroofing done.

a. See answer to RFI #31.

33. Is contractor expected to provide an allowance for roof deck replacement or is the assumption entire deck surface is acceptable?

a. See Drawings sheets S1.2 and S1.3 for notes on the assumed replacement of deteriorated roof deck, floor sheathing, floor joists, rafters, etc. The extents of assumed replacement and/or sistering are expressed as percentages.

34. Please confirm what fill will be required to be used within the crawl space. Aggregate base specifications? Screened fill specifications?

a. See answer to RFI #13.

35. Please confirm that all equipment and material will be removed by others from the building and the crawlspace prior to NTP. Any remaining debris should be disposed of as required by law during demolition.

a. See answer to RFI #20.

36. Is contractor expected to provide an allowance for rafter replacement or will any damaged rafters be addressed as exposed?

a. See answer to RFI #33.

37. Project Description mentions replacement of slab with gravel. A pavement detail is shown, but there was no specific paving replacement shown on plans. Is that correct that there is no replacement plan for concrete?

a. See answer to RFI #15.