B08_-_Attachment_3_-_Design.pdf
PDF 34 MB Posted
- Attached to
- Bridge Construction - Nulhegan Basin NWR, Vermont Federal contract opportunity
- Solicitation number
- 140FC325R0015
About this file
This file is a detailed design document for the North Branch Bridge Replacement project located at the Nulhegan Basin National Wildlife Refuge in Vermont. The comprehensive design set includes 23 technical drawing sheets covering site location, survey information, existing conditions, proposed plans, grading, erosion control, bridge plans, abutment details, structural framing, deck specifications, and timber railing layouts. The drawings were prepared by MJ Engineering and Land Surveying, P.C. for Contract No. 140F0822D0268, with professional engineering certification by Michael D. Panichelli.
The design documents provide extensive technical specifications for a bridge construction project, including detailed civil engineering plans, structural calculations, load tables, moment and shear diagrams, camber tables, and construction sequencing notes. The drawings include precise measurements for roadway sections, abutment reinforcements, girder elevations, deck laminations, and bridge railing details. The technical drawings demonstrate a comprehensive approach to bridge design, addressing structural integrity, load capacities, environmental considerations, and compliance with engineering standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC325R0015_Amd_0002.pdf | ||
| Attachment_1-(Change)_SOW_NWR_North_Branch_Bridge_Replacement_0002.pdf | ||
| Sol_140FC325R0015_Amd_0001.pdf | ||
| Sol_140FC325R0015.pdf | ||
| B08_-_Attachment_2_-_Specification.pdf | ||
| B08_-_Attachment_1_-_SOW_-_NWR_-_North_Branch_Bridge_Replacementv2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE LOCATION MAP
NOT TO SCALE
DRAWING INDEX
DRAWING SHEET TITLE
G-001 01 COVER PAGE AND DRAWING INDEX
C-001 02 GENERAL NOTES AND LEGENDS
C-002 03 SURVEY CONTROL INFORMATION
C-010 04 STAGING AND WORK ZONE PLAN
C-100 05 EXISTING CONDITIONS PLAN
C-110 06 REMOVALS PLAN
C-120 07 PROPOSED PLAN
C-130 08 GRADING AND EROSION CONTROL PLAN
C-200 09 PROFILE AND ROADWAY TYPICAL SECTIONS
C-500 10 DETAILS
ST-01 11 BRIDGE PLAN AND ELEVATION
ST-02 12 TYPICAL SECTION
ST-03 13 BORING LOCATION PLAN AND SUBSURFACE BORING LOGS
ST-04 14 EXCAVATION AND EMBANKMENT PLAN AND SECTIONS
ST-05 15 BEGIN ABUTMENT PLAN AND ELEVATION
ST-06 16 BEGIN ABUTMENT REINFORCEMENT
ST-07 17 END ABUTMENT PLAN AND ELEVATION
ST-08 18 END ABUTMENT REINFORCEMENT
ST-09 19 INTEGRAL ABUTMENTS TYPICAL SECTIONS AND DETAILS
ST-10 20 FRAMING PLAN AND GIRDER DETAILS
ST-11 21 DESIGN TABLES AND DECK DETAILS
ST-12 22 TIMBER RAILING LAYOUT AND DETAILS (1 OF 2)
ST-13 23 TIMBER RAILING DETAILS (2 OF 2)
PREPARED FOR:
REGIONAL MAP
NOT TO SCALE
NULHEGAN BASIN NWR, VERMONT
CONTRACT NO.
140F0822D0268
PREPARED BY:
PROJECT SITE
PROJECT LOCATION
NORTH BRANCH
BRIDGE REPLACEMENT
CONSTRUCTION DOCUMENTS (BID DOCUMENTS)
COST CONSULTANTS
CIVIL ENGINEER
TROPHY POINT, LLC
347 WEST 36TH STREET, SUITE 1101
NEW YORK, NY 10018
Engineering and
Land Surveying, P.C.
MJ ENGINEERING AND LAND SURVEYING, P.C.
21 CORPORATE DRIVE
CLIFTON PARK, NY 12065
VERMONT
CANADA
NEW HAMPSHIRE
F
O
U
R
M
I
L
E
O
A
D
F
O
U
M
L
E
A
D
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
ST
ATE OF VERMONT
Engineering and
Land Surveying, P.C.
GENERAL NOTES:
REMOVAL NOTES:
DRAINAGE NOTES:
LANDSCAPE DEVELOPMENT NOTES:
CONSTRUCTION SEQUENCING NOTES:
STRUCTURAL GENERAL NOTES:
FOUNDATION NOTES:
FOUNDATION NOTES (CONTINUED):
STREAM PROTECTION NOTES:
COFFERDAM NOTES:
SUPERSTRUCTURE NOTES:
STEEL ERECTION NOTES:
EXISTING STRUCTURE REMOVAL NOTES:
PROPOSED LEGEND:
EXISTING LEGEND:
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
050' 100'100'
NOTES:
LEGEND:
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
N
R T
H
B
R A
N C
H
N
U L H
E G
A N
V
E R
Engineering and
Land Surveying, P.C.
05' 10'10'
NOTES:
LEGEND:
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
05' 10'10'
REMOVAL NOTES:
REMOVALS LEGEND:
REMOVAL KEYED NOTES:
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
Engineering and
Land Surveying, P.C.
05' 10'10'
PROPOSED LEGEND:
NOTES:
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
Engineering and
Land Surveying, P.C.
05' 10'10'
REMOVALS LEGEND:
EROSION AND SEDIMENT CONTROL NOTES:
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
Engineering and
Land Surveying, P.C.
TYPICAL SECTION NOTES:
FOUR MILE ROAD RECONSTRUCTION
FOUR MILE ROAD - PROFILE
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
GENERAL NOTES:
TRENCHING & ANCHORING PROCEDURE NOTES:
EROSION CONTROL BLANKET INSTALLATION
"BOTTOM OF SLOPE TERMINATION"
SIDE SEAM OVERLAP
TOP OF SLOPE TRENCH
END ROLL OVERLAP
GRAVEL ROADWAY SECTION
SINGLE POST SIGN MOUNTING
NOTES:
SILT FENCE INSTALLATION
SECTION
PERSPECTIVE VIEW
TOPSOIL, SEED AND MULCH
Engineering and
Land Surveying, P.C.
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
AA
PLAN
05' 10'10'
ELEVATION SECTION A-A
Engineering and
Land Surveying, P.C.
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
TYPICAL SECTION
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
A
A
BB
LEGEND:
Engineering and
Land Surveying, P.C.
05' 10'10'
SLOPE PROTECTION DETAIL (SECTION A-A)
NOTES:
SECTION B-B
PLAN
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
BEGIN ABUTMENT PLAN
BEGIN ABUTMENT ELEVATION
NOTES:
CC
DD
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
END REINFORCEMENT DETAIL
(TYPICAL BOTH ENDS)
Engineering and
Land Surveying, P.C.
REINFORCEMENT PLAN - LOWER STEM
REINFORCEMENT PLAN - UPPER STEM
FRONT FACE REINFORCEMENT ELEVATION
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
END ABUTMENT PLAN
END ABUTMENT ELEVATION
NOTES:
CC
DD
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
END REINFORCEMENT DETAIL
(TYPICAL BOTH ENDS)
Engineering and
Land Surveying, P.C.
REINFORCEMENT PLAN - LOWER STEM
REINFORCEMENT PLAN - UPPER STEM
FRONT FACE REINFORCEMENT ELEVATION
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
NOTES:
NOTE:
WATERSTOP NOTES
CROSS-SECTION AT ROCKET SOCKET
(SECTION D-D)
DRILLED PILE CROSS-SECTION
(SECTION C-C)
Engineering and
Land Surveying, P.C.
ABUTMENT SECTION
KEYWAY DETAIL
TYPE D WATERSTOP
WINGWALL SECTION
CHAMFER DETAIL
PILE DETAIL
REINFORCEMENT AT PILES
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
INTERIOR GIRDER
CONNECTION
AA
SECTION A-A
NOTES:
CC
Engineering and
Land Surveying, P.C.
02.5' 5'5'
FRAMING PLAN
GIRDER ELEVATION
GIRDER ELEVATION
INTERMEDIATE DIAPHRAGM - TYPE D1
TYPICAL GIRDER ELEVATION
PLAN WOOD BLOCK
SECTION C-C
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
SIDE VIEW OF DECK LAMINATIONS
LAYOUT OF DECK LAMINATIONS
DECK LAMINATION NOTES:
NAILING CLIP TYPE 1
MOMENT AND SHEAR TABLE NOTES:
CAMBER TABLE NOTES:
DESIGN LOAD TABLE
UNIT
EXT. GIRDER INT. GIRDER
(kip/ft) (kip/ft)
DL
DECK 0.098 0.116
GIRDER 0.247 0.247
DIAPHRAGMS 0.008 0.016
RAILINGS 0.110 0.000
WEARING
SURFACE 0.024 0.029
UTILITIES 0.000 0.000
TOTAL 0.487 0.408
DESIGN LOAD TABLE NOTE:
CAMBER DIAGRAM - SINGLE SPAN
MOMENT AND SHEAR
TABLE
c OF
BRGS.
BEG.
ABUT.
0.1 L1 0.2 L1 0.3 L1 0.4 L1 0.5 L1 0.6 L1 0.7 L1 0.8 L1 0.9 L1 c OF
BRGS.
END
ABUT.
GIRDER
D.L.
MOMENT 0.00 79.46 141.41 185.83 212.32 221.08 212.32 185.83 141.41 79.46 0.00
SHEAR 16.04 12.86 9.67 6.48 3.19 0.00 -3.19 -6.48 -9.67 -12.86 -16.04
HL93 (+)
MOMENT 0.00 159.96 277.64 353.04 396.26 402.25 396.26 353.04 277.64 159.96 0.00
SHEAR 32.93 28.55 24.29 20.14 16.12 12.25 9.15 6.48 3.93 1.50 0.00
HL93 (-)
MOMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SHEAR 0.00 -1.50 -3.93 -6.48 -9.15 -12.25 -16.12 -20.14 -24.29 -28.55 -32.93
GIRDER
D.L.
MOMENT 0.00 53.88 96.07 126.55 144.51 150.36 144.51 126.55 96.07 53.88 0.00
SHEAR 10.86 8.73 6.61 4.48 2.13 0.00 -2.13 -4.48 -6.61 -8.73 -10.86
HL93 (+)
MOMENT 0.00 217.88 378.16 480.86 539.73 547.88 539.73 480.86 378.16 217.88 0.00
SHEAR 44.85 38.88 33.08 27.44 21.96 16.68 12.47 8.83 5.35 2.05 0.00
HL93 (-)
MOMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SHEAR 0.00 -2.05 -5.35 -8.83 -12.47 -16.68 -21.96 -27.44 -33.08 -38.88 -44.85
GIRDER
D.L.
MOMENT 0.00 53.88 96.07 126.55 144.51 150.36 144.51 126.55 96.07 53.88 0.00
SHEAR 10.86 8.73 6.61 4.48 2.13 0.00 -2.13 -4.48 -6.61 -8.73 -10.86
HL93 (+)
MOMENT 0.00 217.88 378.16 480.86 539.73 547.88 539.73 480.86 378.16 217.88 0.00
SHEAR 44.85 38.88 33.08 27.44 21.96 16.68 12.47 8.83 5.35 2.05 0.00
HL93 (-)
MOMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SHEAR 0.00 -2.05 -5.35 -8.83 -12.47 -16.68 -21.96 -27.44 -33.08 -38.88 -44.85
GIRDER
D.L.
MOMENT 0.00 53.88 96.07 126.55 144.51 150.36 144.51 126.55 96.07 53.88 0.00
SHEAR 10.86 8.73 6.61 4.48 2.13 0.00 -2.13 -4.48 -6.61 -8.73 -10.86
HL93 (+)
MOMENT 0.00 217.88 378.16 480.86 539.73 547.88 539.73 480.86 378.16 217.88 0.00
SHEAR 44.85 38.88 33.08 27.44 21.96 16.68 12.47 8.83 5.35 2.05 0.00
HL93 (-)
MOMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SHEAR 0.00 -2.05 -5.35 -8.83 -12.47 -16.68 -21.96 -27.44 -33.08 -38.88 -44.85
GIRDER
D.L.
MOMENT 0.00 79.46 141.41 185.83 212.32 221.08 212.32 185.83 141.41 79.46 0.00
SHEAR 16.04 12.86 9.67 6.48 3.19 0.00 -3.19 -6.48 -9.67 -12.86 -16.04
HL93 (+)
MOMENT 0.00 159.96 277.64 353.04 396.26 402.25 396.26 353.04 277.64 159.96 0.00
SHEAR 32.93 28.55 24.29 20.14 16.12 12.25 9.15 6.48 3.93 1.50 0.00
HL93 (-)
MOMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SHEAR 0.00 -1.50 -3.93 -6.48 -9.15 -12.25 -16.12 -20.14 -24.29 -28.55 -32.93
CAMBER TABLE
c OF
BRGS.
BEGIN
ABUT.
0.1 L1 0.2 L1 0.3 L1 0.4 L1 0.5 L1 0.6 L1 0.7 L1 0.8 L1 0.9 L1 c OF
BREGS.
END
ABUT.
GIRDER
I. STEEL D.L. (ft) 0.00 0.01 0.01 0.01 0.02 0.02 0.02 0.01 0.01 0.01 0.00 II. DECK D.L. (ft) 0.00 0.01 0.02 0.02 0.03 0.03 0.03 0.02 0.02 0.01 0.00
III. SUPERIMPOSED D.L. (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IV. VERTICAL CURVE (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL = I+II+III+IV (ft) 0.00 0.01 0.03 0.04 0.04 0.05 0.04 0.04 0.03 0.01 0.00
GIRDER
I. STEEL D.L. (ft) 0.00 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.01 0.01 0.00 II. DECK D.L. (ft) 0.00 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.00
III. SUPERIMPOSED D.L. (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IV. VERTICAL CURVE (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL = I+II+III+IV (ft) 0.00 0.01 0.02 0.03 0.03 0.03 0.03 0.03 0.02 0.01 0.00
GIRDER
I. STEEL D.L. (ft) 0.00 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.01 0.01 0.00 II. DECK D.L. (ft) 0.00 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.00
III. SUPERIMPOSED D.L. (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IV. VERTICAL CURVE (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL = I+II+III+IV (ft) 0.00 0.01 0.02 0.03 0.03 0.03 0.03 0.03 0.02 0.01 0.00
GIRDER
I. STEEL D.L. (ft) 0.00 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.01 0.01 0.00 II. DECK D.L. (ft) 0.00 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.00
III. SUPERIMPOSED D.L. (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IV. VERTICAL CURVE (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL = I+II+III+IV (ft) 0.00 0.01 0.02 0.03 0.03 0.03 0.03 0.03 0.02 0.01 0.00
GIRDER
I. STEEL D.L. (ft) 0.00 0.01 0.01 0.01 0.02 0.02 0.02 0.01 0.01 0.01 0.00 II. DECK D.L. (ft) 0.00 0.01 0.02 0.02 0.03 0.03 0.03 0.02 0.02 0.01 0.00
III. SUPERIMPOSED D.L. (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IV. VERTICAL CURVE (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL = I+II+III+IV (ft) 0.00 0.01 0.03 0.04 0.04 0.05 0.04 0.04 0.03 0.01 0.00
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
CC
Land Surveying, P.C.
BRIDGE RAILING LAYOUT
BRIDGE RAILING END VIEW (SECTION A-A)
BRIDGE RAILING FRONT VIEW
BRIDGE RAILING BACK VIEW
A
A
BRIDGE RAILING END VIEW (SECTION B-B)
B
B
BRIDGE RAILING (SECTION C-C)
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
FRONT VIEW PLAN VIEW STEEL SPLICE PLATE
PLAN VIEW FRONT VIEW STEEL CURB SPLICE CONNECTOR
CURB RAIL PREP.
Engineering and
Land Surveying, P.C.
TIMBER RAIL SPLICE DETAILS
CURB SPLICE DETAILS
CURB RAIL PREP.
SCUPPER BLOCK
DECK PREP.
ANGLE
M
IC
HA
EL D . PANICHELL
I
L
I C E N S E D
P R
O
F E S S I O NA L E NG
I N E
E RNo. 9105
CIVIL
| COVER |
| C-001 |
| C-002 |
| C-010 |
| C-100 |
| C-110 |
| C-120 |
| C-130 |
| C-200 |
| C-500 |
| ST-01 |
| ST-02 |
| ST-03 |
| ST-04 |
| ST-05 |
| ST-06 |
| ST-07 |
| ST-08 |
| ST-09 |
| ST-10 |
| ST-11 |
| ST-12 |
| ST-13 |
File details come from the government source that posted it. Updated .