B08_Attachment_2_Statement_of_Work.pdf
PDF 162 KB Posted
- Solicitation number
- 140P8425Q0101
About this file
This Request for Quote (RFQ) no. 140P8425Q0101 is for multiple concrete deliveries to Lava Beds National Monument in California. The National Park Service requires approximately 80 cubic yards of ready-mix concrete for sidewalks, slabs, and footings in two project locations: the Cave Loop area and the Newell Segregation Center. The concrete will be delivered incrementally from September to December 2025, with delivery dependent on weather conditions. The concrete must have a minimum compressive strength of 4,000 pounds per square inch, use a "weathered oak" color for the Cave Loop area, and include specific additives as recommended by the manufacturer.
Delivery will be coordinated through the Park's Chief of Maintenance, Don Bowen, with deliveries occurring between 7:30 am and 3:00 pm Monday through Friday. The project involves 8-10 truckloads for the Cave Loop area (80 cubic yards) and 2-4 truckloads for the Newell Segregation Center (20 cubic yards). The contracting officer is Phaedra Fuller from the Department of the Interior, National Park Service, located in Olympic National Park, Washington. Concrete must be ready/transit mixed, meet specific batching and mixing requirements, and be adaptable to both cold and hot weather conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment_1_Terms_Provisions_Clauses.pdf | ||
| Sol_140P8425Q0101.pdf | ||
| B08_Attachment_3_Price_and_Provisions_to_Return_with_Quote.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation (RFQ) no. 140P8425Q0101, Attachment 2 – Statement of Work (9/18/25) Multiple Deliveries Concrete to Lava Beds National Monument (LABE)
Concrete Specifications & Delivery Information Lava Beds National Monument
1.0 Background
The National Park Service, Lava Beds National Monument, located in Siskiyou County, California, has a requirement for the supply and delivery of approximately 80 cubic yards of ready-mix concrete for sidewalks.
The concrete will be delivered incrementally to various locations within two Parks, Lava Beds, and Tulelake National Monuments throughout the early Fall, weather permitting, per these specifications.
All deliveries shall be coordinated through the Park’s Chief of Maintenance, Don Bowen,
(530) 667-8134 or designee.
2.0 Objective
This acquisition will supply concrete for sidewalks, slabs, and footings in the following areas of the park: the Cave Loop area, and the Newell Segregation Center in Newell CA. The projects are in different locations of the park, from Newell CA to 20 miles away at the Lava Beds National Monument Cave Loop area. The 2 pour sites will be poured at different times as coordinated with Don or Garry (refer to Section 8, Key Personnel) .
The Park will coordinate with the contractor to make up to four short loads of concrete for the Newell project for concrete footings. Only the Cave Loop area will be colored concrete. The dimensions below are for the amounts of concrete that are the projected need for the project sites. The contractor will be paid for actual quantities delivered.
3.0 Period of Performance
The performance period is planned from September to December 2025. Deliveries October to December are weather-dependent, coordinate with Don Bowen and/or Garry Wedmore (point of contact info is below in Section 8).
4.0 Place of Performance
The physical address of the Lava Beds National Monument is 1 Indian Well Headquarters Rd., Tulelake, CA 96134.
5.0 Delivery
The deliveries will be needed at various locations in the Park boundaries, all within a 20-mile radius of Lava Beds National Monument. Park map may be accessed online via this NPS site link: Maps - Lava Beds National Monument (U.S. National Park Service) or https://www.nps.gov/labe/planyourvisit/maps.htm.
The UTM Coordinates for the Park Administrative area at 1 Indian Well Headquarters Rd., Tulelake, CA 96134 are:
Garden Bridges Trail Area: color 41°42.510”N, 121°30.887”W
60.00 yds. plus or minus
20.0 yds. Plus or minus no color 41°35.15.” N, 121°22.24”W Newell Segregation center
Delivery Site Locations:
Hours for delivery shall be 7:30 am to 3:00 pm Monday through Friday. No work will be accomplished on weekends or observed national holidays without prior approval from the Park.
All deliveries shall be coordinated through the Park’s Chief of Maintenance, Don Bowen, (530) 667-8134.
6.0 Scope
The contractor will supply the concrete per specifications, adjusting for seasonal temperatures as needed.
The quantities of concrete herein are the Government’s estimated need. Given the short period of performance, if the conditions of Section C, Items 1 and 2 below cannot be met for making a delivery, then postponing the delivery to a later date may or may not be possible. The NPS will pay the contractor for actual quantities delivered regardless of the estimated quantities stated herein.
Number on Map
Location Name Dimensions in Cubic Yards
Estimated deliveries per site Additions
Anticipated Delivery
1) Cave Loop area 80 CY + or - 8 to 10 truckloads
Early Fall 2025
2) Newel Segregation
20 CY + or - 2 to 4 truckloads Color Early Fall 2025 https://www.nps.gov/labe/planyourvisit/maps.htm
7.0 Specifications
A. MATERIALS:
1. Concrete shall contain cement, coarse aggregate, and fine aggregate with a minimum of 4,000 pounds of compressive strength per square inch at 28 days.
Concrete color, “weathered oak” from the Master Builder’s Color Chart, shall be added for deliveries to all locations except the optional Admin area. Additives such as non-chloride accelerator, fibers, superplasticizer, and set retardant shall be added as recommended by the manufacturer.
2. Water shall be clean and free from salt, oil, or organic substances.
B. BATCHING AND MIXING CONCRETE MATERIALS:
1. Concrete should be Ready/Transit Mixed. Deliver completely mixed to project sites.
2. Do not add mixing water during hauling. Add water after delivery only when agreed by the Contracting Officer’s Representative (COR). Should water be added, revolve the mixing drum not less than 30 revolutions at mixing speed after adding and before commencing discharge.
3. Deliver each load at the job site accompanied by a ticket showing the mix design number, volume of concrete, the weight of cement in pounds, and the total weight of each ingredient in pounds. Must also show the time at which the materials were batched and the reading of the revolution counter at the time the truck mixer was charged.
4. Air entrainment should be included in the concrete mix. And add mixtures to delay cure time to allow for the delivery to the project site if greater than 1-hour transit from mix site to placement location.
5. No re-tempering of partially hardened material is permitted. Do not use partially hardened concrete in the work.
6. Testing and verification of material compliance will be done on-site
C. BATCHING IN ADVERSE WEATHER:
1. Cold Weather: When the atmospheric temperature is below 40°F, or is likely to fall below 40°F during the 24 hours after placing, heat the materials before mixing, so that the temperature of the mix when deposited shall be between 65° and 80°F. Do not heat the mixing water or the cement over 160°F. Remove lumps of frozen material and ice from the aggregates before they are placed in the mixer.
2. Hot Weather: When temperatures are above 90°F, reduce the temperature of the concrete mix by using iced mixing water, and protecting aggregates and cement from direct rays of the sun. Do not place concrete exceeding 80°F.
8.0 Key Personnel
The Contracting Officer responsible for the solicitation and award is:
Phaedra Fuller Dept. of the Interior, National Park Service Point Reyes Major Acquisition Buying Office (Pt Reyes MABO) Office located in Olympic National Park, Port Angeles, WA Work & Mobile Phone: (360) 161-1827 Email: Phaedra_Fuller@nps.gov
The NPS Representatives for coordinating/scheduling deliveries after award are:
Don Bowen, Chief of Maintenance
Tule Lake Unit, WWII Valor in the Pacific National Monument Office Phone: 530 667-8134 Mobile Phone: 530 598-5195 Email: Don_Bowen@nps.gov
Garry Wedmore, Maintenance Work leader
Tule Lake Unit, WWII Valor in the Pacific National Monument Office Phone: 530 667-8138 LABE Email: Garry_Wedmore@nps.gov