B08_Attachment_2_Schedule_of_Items.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- REPAIR OF WATER LEAK OF BURROWS POND
- Solicitation number
- 140G0125Q0029
About this file
This is a Schedule of Items pricing template spreadsheet that contractors must complete to submit their bids for the water leak repair project at USGS Conte Anadromous Fish Lab Facility. The template includes Firm-Fixed Price line items for excavation, concrete work, plumbing repairs, cleanup, and backfilling material. Additional option line items cover concrete repair/installation (priced per square foot) and asphalt surfacing. The template also includes a Time and Materials section for loaded hourly labor rates across multiple repair labor categories.
The related solicitation is for repairs to an underground water line leak at Burrows Pond in Turners Falls, MA, with work to be completed within 86 days after notice to proceed. The project involves repairing a leak at a 12"x6" reducer fitting and valve connection, requiring asphalt removal, excavation to 9-10 feet, leak testing, and repairs. This is a 100% Small Business Set-Aside under NAICS 238910 with a $19M size standard. Quotes are due February 21, 2025, at 10:00 AM PST, with an anticipated award date of March 3, 2025. A site visit is scheduled for February 12, 2025, at 9:00 AM EST.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Firm-Fixed Price line items | |||
| Item No. | Description | Unit | Price |
| 10 | Excavation | LS | |
| 10 | Concerete Work | LS | |
| 10 | Plumbing for the pipe and valve repair | LS | |
| 10 | Clean up | LS | |
| 10 | Backfilling provide material | LS | |
| Total |
| Option Line Items Firm Fixed Price Line Items | |||
| Item No. | Description | Unit | Price |
| 10 | repair/install concrete | Square Foot | |
| 10 | Asphalt (Surfacting) | LS | |
| Total |
Time and Materials Loaded Hourly Rate for Repair Labor Categories/These can be listed out for each repair labor
| Item No. | Description | Loaded Hourly Labor Rate |
| 10 | ||
| 10 | ||
| 10 | ||
| 10 | ||
| 10 | ||
| 10 | ||
| 10 | ||
| 10 | ||
| 10 | ||
| 10 | ||
| 10 |