This document contains a price schedule for barricades to be used under solicitation number 140P1423R0020 for the fabrication and installation of barricades issued by the Department of the Interior National Park Service Intermountain Region. The price schedule lists unit pricing for single and double barricades to be installed with either disturbed or undisturbed ground for the first through fifth years of the contract. Pricing is provided on a line item basis for evaluation purposes, with total pricing also included. Disturbed ground is defined as areas that have previously been dug up, while undisturbed ground may present harder installation conditions. Single barricades are suitable for roads with narrow widths, while double barricades consist of two units for traffic control.

View the file

Other files for this federal contract opportunity

Other files attached to YELL- PR FABRICATE AND INSTALL BARRICADE, newest first.
File Type Posted
Sol_140P1423R0020_Amd_0001.pdf PDF
Barricade_Questions_and_Answers_0001.pdf PDF
B08_-_Attachment_1-_Specifications.pdf PDF
B08_-_Attachment_3_-_Questionnaire.docx DOCX document
B08_-_Attachment_4_-_Limitation_on_Subcontracting_Worksheet.xlsx XLSX spreadsheet
B08_-_Attachment_5_-_WD_WY20230043_1_6_23.pdf PDF
Sol_140P1423R0020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This price list will be used for evaluation purposes and future orders, order minimums and maximums are outline in FAR 52.216-19 Ordering Limitations in 140P1423Q0015.

First Year Ordering Prices
Line ItemDescriptionQuantityPrice EachPrice
10Single Barricade - with Disturbed ground1$$
20Double Barricade - with Disturbed ground1$$
30Single Barricade - with out Disturbed ground1$$
40Double Barricade - with out Disturbed ground1$$
TOTAL PRICE (this will be used for evaluation purposes)$
Disturbed ground means the spot the Barricades will be installed has been dug up before and therefore there should be no unexpected obstacles. Undistrubed means that ground may be harder to install a barricade.

Single Barricades are for roads with a small width and one barricade will suffice. Double barricade means two barricades (one on each side) will be needed for traffic control.

Second Year Ordering Prices
Line ItemDescriptionQuantityPrice EachPrice
10Single Barricade - with Disturbed ground1$$
20Double Barricade - with Disturbed ground1$$
30Single Barricade - with out Disturbed ground1$$
40Double Barricade - with out Disturbed ground1$$
TOTAL PRICE (this will be used for evaluation purposes)$
Disturbed ground means the spot the Barricades will be installed has been dug up before and therefore there should be no unexpected obstacles. Undisturbed means that ground may be harder to install a barricade.

Single Barricades are for roads with a small width and one barricade will suffice. Double barricade means two barricades (one on each side) will be needed for traffic control.

Third Year Ordering Prices
Line ItemDescriptionQuantityPrice EachPrice
10Single Barricade - with Disturbed ground1$$
20Double Barricade - with Disturbed ground1$$
30Single Barricade - with out Disturbed ground1$$
40Double Barricade - with out Disturbed ground1$$
TOTAL PRICE (this will be used for evaluation purposes)$
Disturbed ground means the spot the Barricades will be installed has been dug up before and therefore there should be no unexpected obstacles. Undisturbed means that ground may be harder to install a barricade.

Single Barricades are for roads with a small width and one barricade will suffice. Double barricade means two barricades (one on each side) will be needed for traffic control.

Fourth Year Ordering Prices
Line ItemDescriptionQuantityPrice EachPrice
10Single Barricade - with Disturbed ground1$$
20Double Barricade - with Disturbed ground1$$
30Single Barricade - with out Disturbed ground1$$
40Double Barricade - with out Disturbed ground1$$
TOTAL PRICE (this will be used for evaluation purposes)$
Disturbed ground means the spot the Barricades will be installed has been dug up before and therefore there should be no unexpected obstacles. Undisturbed means that ground may be harder to install a barricade.

Single Barricades are for roads with a small width and one barricade will suffice. Double barricade means two barricades (one on each side) will be needed for traffic control.

Fifth Year Ordering Prices
Line ItemDescriptionQuantityPrice EachPrice
10Single Barricade - with Disturbed ground1$$
20Double Barricade - with Disturbed ground1$$
30Single Barricade - with out Disturbed ground1$$
40Double Barricade - with out Disturbed ground1$$
TOTAL PRICE (this will be used for evaluation purposes)$
Disturbed ground means the spot the Barricades will be installed has been dug up before and therefore there should be no unexpected obstacles. Undisturbed means that ground may be harder to install a barricade.

Single Barricades are for roads with a small width and one barricade will suffice. Double barricade means two barricades (one on each side) will be needed for traffic control.

File details come from the government source that posted it. Updated .