This is a Price Schedule (cost template) for the 2026 drydocking of the NHL Alma vessel under National Park Service contract solicitation 140P8526Q0086 (PMIS# 275652). The schedule is organized into base items and optional items, with all cost fields currently showing $0.
The base items include NPS Transportation, Contractor Transportation, Temporary Services, and Haulout and Blocking services. Additional base services encompass Bottom Cleaning and Draining, Coatings for Underwater Surfaces, inspection and greasing of Max-Props equipment, replacement of sacrificial zincs, and servicing of Through Hull Valves. Optional items available for pricing include Hull and Deck Caulking, replacement of the DFO Tank, replacement of Propeller Shafts and Journals, and installation of GFM Propellers. Bidders are required to complete this template by inserting costs for each line item and task, with separate subtotals calculated for base items and optional items, leading to a total estimated cost for the entire drydocking project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8526Q0086.pdf | ||
| B08_Attachment_3-SCA_Wage_Determination.pdf | ||
| B08_Attachment_1-Statement_of_Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CPS
2026 Alma Haulout CPS - PMIS# 275652
CLIN TITLE TOTAL COST
| 1.01.A | NPS Transportation |
| 1.01.B | Contractor Transportation |
| 1.02 | Temporary services |
| 1.03 | Haulout and blocking |
| 2.01 | Bottom cleaning and draining |
| 2.02 | Coatings for underwater surfaces |
| 3.01 | Inspect and grease Max-Props |
| 3.02 | Replace sacrificial zincs |
| 3.03 | Service Through Hull Valves |
BASE ITEMS TOTAL COST $ - 0
OPTIONAL ITEMS
| 4.01 | Hull and Deck Caulking |
| 4.02 | R/R DFO Tank |
| 4.03 | R/R Prop Shafts/Journals |
| 4.04 | Install GFM Propellers |
OPTIONAL ITEMS TOTAL COST $ - 0