B08_Attachment_2_Drawings_Maps_Figures.pdf

PDF 2 MB Posted

Attached to
Deep Clean Baker-Barry Tunnel, GOGA Federal contract opportunity
Solicitation number
140P8625Q0032
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document is a detailed set of technical drawings and traffic control plans for a deep cleaning project of the Barry Baker Tunnel in the Golden Gate National Recreation Area located in Sausalito, California. The drawings provide comprehensive information about tunnel dimensions, weep hole cleaning, mineral buildup removal, and specific traffic management strategies during the cleaning work. Key technical details include tunnel cross-section specifications showing lighting conduits, water lines, and existing infrastructure, as well as precise diagrams illustrating traffic control measures for both north and south tunnel walls.

The technical drawings outline specific requirements for the cleaning project, including traffic flow restrictions, one-way inbound traffic protocols, and designated staging areas. Specific traffic control notes indicate that vehicles leaving the Marin Headlands will be detoured to use McCullough Road, with barricades and detour signage implemented. The documentation includes aerial maps showing the tunnel entrances, staging areas, and surrounding roads, as well as detailed diagrams of tunnel cross-sections and equipment positioning. The project involves carefully managed traffic flow to accommodate deep cleaning work on the tunnel's walls, gutters, and utility lines while maintaining safety and minimal disruption.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Golden Gate National Recreation Area Deep Clean Barry Baker Tunnel Bunker Road, Marin Headlands

Sausalito, CA

Typical Dimensions Weep Hole Cleaning and Mineral Buildup Removal

Typical Conditions

East Tunnel Entrance West Tunnel Entrance

Bunker Road, Marin Headlands

Sausalito, CA

U.S. Hwy 101

Staging Area

Danes Road

East Tunnel EntranceAlexander Ave.

Bunker Road, Marin Headlands

Sausalito, CA

Traffic Control Bunker Road East Bound Leaving Marin Headlands

Notes

• Vehicles leaving the Marin Headlands shall be detoured to use McCullough Road

• Barricade closing East Bound Bunker Road and signage, “Road Closed”

• Detour signs directing vehicles to use

McCullough Rd

N

Bunker Road, Marin Headlands

Sausalito, CA

Bunker Road, Marin Headlands

Sausalito, CA

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5

File details come from the government source that posted it. Updated .