This is a technical drawings attachment document for a federal construction project at Cape Cod National Seashore related to replacing the Province Lands septic system. The drawings were prepared by Langan Engineering and Environmental Services, Inc., a Massachusetts-licensed engineering firm located in Boston, and are dated April 30, 2025.
The drawings include civil, utility, electrical, and landscape design plans for the project. Key technical specifications shown include a septic system designed for 250,000 daily visitors with a Title V design flow of 1,389 persons per day and a daily sewer flow of 6,945 gallons per day at 5 gallons per person. The document contains multiple plan and section views (labeled CG, CU, CE, and LP series), including site plans for a comfort station and visitor center basement, utility infrastructure details, electrical one-line diagrams for both demolition and new work phases, panelboard identification specifications, surge protective device installation details, and landscape planting details. Electrical plans show both normal and emergency power systems with specific labeling requirements (black letters on white background for normal power; white letters on red background for emergency power). Demolition and new work phases are clearly delineated throughout the drawings, with construction details including concrete truck washout areas and underground electrical conduit and cable specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
name
SSACHUSETTS Lic. No. X 271
© 2024 Microsoft Corporation © 2023 TomTom
La ng an
Langan Engineering and Environmental Services, Inc.
100 Cambridge Street, Suite 1310
Boston, MA 02114
T: 617.824.9100 F: 617.824.9101 www.langan.com
(NOT SHOWN TO SCALE)
LLC.
Fi le na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C G
1-
.d w g D at e:
/2
5/
T im e:
6:
U se r:
sw al sh L ay ou t:
C
G
4.30.2025 273 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C G
1-
.d w g D at e:
/2
5/
T im e:
6:
U se r:
sw al sh L ay ou t:
C
G
4.30.2025 274 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C U
1-
.d w g D at e:
/2
5/
T im e:
6:
U se r:
sw al sh L ay ou t:
C
U
DAILY FLOW SUMMARY
MAY - OCTOBER 250,000 PEOPLE
DAILY VISITORS 1,389 PERSONS/DAY
TITLE V DESIGN FLOW 5 GPD / PERSON
DAILY SEWER FLOW 6,945 GPD
4.30.2025 275 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C U
1-
.d w g D at e:
/2
5/
T im e:
6:
U se r:
sw al sh L ay ou t:
C
U
4.30.2025 276 na m e:
C
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C U
1-
.d w g D at e:
/3
0/
T im e:
0:
U se r:
rp hi llip s
L ay ou t:
C U
4.30.2025 277 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C U
1-
.d w g D at e:
/2
5/
T im e:
6:
U se r:
sw al sh L ay ou t:
C
U
4.30.2025 278
Fi le na m e:
C
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C U
1-
.d w g D at e:
/2
1/
T im e:
1:
U se r:
sw al sh L ay ou t:
C
U
4.30.2025 279 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C U
1-
.d w g D at e:
/2
5/
T im e:
6:
U se r:
sw al sh L ay ou t:
C
U
4.30.2025 2710 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C U
1-
.d w g D at e:
/2
5/
T im e:
6:
U se r:
sw al sh L ay ou t:
C
U
4.30.2025 2711 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C U
1-
.d w g D at e:
/2
5/
T im e:
6:
U se r:
sw al sh L ay ou t:
C
U
4.30.2025 2712 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C E1
-0
1.
dw g
D at e:
/2 5/
T im e:
6:
U se r:
sw al sh
L ay ou t:
C E1
4.30.2025 2713
ALL CONCRETE
TRUCKS SHALL
WASHOUT HERE
N.T.S.
SECTION
Fi le na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C E5
-0
1.
dw g
D at e:
/2 5/
T im e:
6:
U se r:
sw al sh
L ay ou t:
C E5
4.30.2025 2714
N.T.S.
PLAN VIEW
Fi le na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
C E5
-0
2.
dw g
D at e:
/2 5/
T im e:
6:
U se r:
sw al sh
L ay ou t:
C E5
4.30.2025 2715 na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
LP
1-
.d w g
D at e:
/2 5/
T im e:
6:
U se r:
sw al sh
L ay ou t:
LP
4.30.2025 2716
3 TIMES ROOTBALL DIA.
3 TIMES ROOTBALL DIA.
8"
6" M
IN
VARIES
8"
Fi le na m e:
c
:\b m s\ la ng an
-p w
-0 1\ d0
\1
-0
1-
LP
1-
.d w g
D at e:
/2 5/
T im e:
6:
U se r:
sw al sh
L ay ou t:
LP
4.30.2025 2717
ELECTRICAL ABBREVIATIONS
SYMBOL DESCRIPTION MOUNTING
HEIGHT
ELECTRICAL LEGEND
KW
name MASSACHUSETTS Lic. No. XXXX
GENERAL ELECTRICAL NOTES
GENERAL ELECTRICAL DEMOLITION/RENOVATION NOTES
MASSACHUSETTS Lic. No. XXXX
ELECTRICAL SITE PLAN - DEMOLITION
ELECTRICAL PLAN - COMFORT STATION - DEMOLITION
ELECTRICAL SITE PLAN - NEW WORK
ELECTRICAL PLAN - COMFORT STATION - NEW WORK
ELECTRICAL PLAN - VISITOR CENTER BASEMENT - NEW WORK
UNDERGROUND HANDHOLE INSTALLATION
UNDERGROUND DIRECT BURIAL CONDUIT AND CABLE
2-1/2"
MIN 5"
FED FROM ####
###Y/###V, 3PH, #W
PANEL ####
SYSTEM TYPE
PANEL DESIGNATION
SELF-ADHESIVE ENGRAVED PLASTIC LABEL
ELECTRICAL CHARACTERISTICS
PANEL LABEL PER THIS DETAIL
ARC-FLASH LABEL
PER CONTRACTOR'S
ELECTRICAL STUDY
RESULTS
"NORMAL POWER" OR "EMERGENCY
POWER"
POWER SOURCE; PANEL OR SWITCHBOARD NAME AND
CIRCUIT # OR TRANSFORMER NAME IF FED FROM
TRANSFORMER
GENERAL NOTES:
A. ALL NEW PANELBOARDS SHALL BE PROVIDED WITH LABELS.
B. CENTER ALL TEXT HORIZONTALLY.
C. MODIFY TEXT AS REQUIRED.
D. PANELBOARDS CONNECTED TO NORMAL POWER SYSTEMS SHALL HAVE BLACK
LETTERS ON WHITE BACKGROUND.
E. PANELBOARDS CONNECTED TO EMERGENCY POWER SYSTEMS SHALL HAVE
WHITE LETTERS ON RED BACKGROUND.
PANELBOARD IDENTIFICATION LABEL
GROUND BUS
NEUTRAL BUS
GROUND BUS
NEUTRAL BUS
REFER TO
NOTE NO. 7
REFER TO
NOTE NO. 7
REFER TO
NOTE NO. 7
REFER TO
NOTE NO. 7
BRANCH CIRCUIT PANELBOARD DISTRIBUTION PANELBOARD
REFER TO
NOTE NO. 7
REFER TO
NOTE NO. 7
1.
2.
3.
4.
5.
6.
7.
8.
NOTES: (APPLICABLE TO THIS DETAIL ONLY)
FOR SERVICE ENTRANCE APPLICATIONS, INSTALL DEVICE ON LOAD SIDE OF SERVICE ENTRANCE AND BOND GROUND LEAD CONDUCTOR TO SERVICE ENTRANCE GROUND.
CONNECT SURGE PROTECTIVE DEVICE TO GROUNDING SYSTEM.
INSTALL CONDUCTORS FOR SURGE PROTECTIVE DEVICES NEATLY. BIND PHASE, NEUTRAL, AND GROUND CONDUCTORS TIGHTLY OVER ENTIRE LENGTH FROM SURGE PROTECTIVE DEVICE TO CIRCUIT BREAKER. USE THE SHORTEST LENGTH OF CONNECTING CABLE POSSIBLE.
REFER TO ONE-LINE DIAGRAM FOR PANELBOARDS THAT REQUIRE SURGE PROTECTIVE DEVICES.
EXTERNALLY MOUNTED SPD. WIRE CONNECTIONS SHOWN TO NEAREST BREAKER FOR DISCONNECT. INSTALLATION IS POSSIBLE ON EITHER SIDE, TOP OR BOTTOM OF
PANEL.
LOCATE SURGE PROTECTIVE DEVICE TO MINIMIZE CONDUCTOR LENGTHS BETWEEN SURGE PROTECTIVE DEVICE AND CIRCUIT BREAKER TO WHICH IT IS CONNECTED. ROUTE CONDUCTORS IN METAL CONDUIT USING RIGID NIPPLE. KEEP CONDUCTORS AS SHORT AND STRAIGHT AS POSSIBLE. WIRE SIZE FOR CONDUCTORS SHALL BE AS REQUIRED BY MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS: MINIMUM SIZE #10 AWG; MAXIMUM SIZE #4 AWG.
PROVIDE MULTIPOLE, 30 AMP DEDICATED CIRCUIT BREAKER TO SERVE AS DISCONNECT FOR SURGE PROTECTIVE DEVICE. COORDINATE WITH VOLTAGE CONFIGURATION OF
PROTECTED EQUIPMENT.
INSTALL CONDUCTORS BETWEEN SURGE PROTECTIVE DEVICE AND TERMINATION POINTS AS SHORT AND STRAIGHT AS POSSIBLE. DO NOT EXCEED MANUFACTURER'S
RECOMMENDED CABLE LENGTH. DO NOT BOND NEUTRAL AND GROUND.
SYMBOL SHOWN ON RISER/ONE-LINE DIAGRAM WHICH THIS DETAIL APPLIES: SPD
SURGE PROTECTIVE DEVICE INSTALLATION
ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION
ELECTRICAL ONE-LINE DIAGRAM - NEW WORK