B08_Attachment_2_-_Construction_Drawings.pdf
PDF 13 MB Posted
- Attached to
- GLBA REHAB WATERLINE
- Solicitation number
- 140P9726R0002
About this file
Construction Drawings for Glacier Bay National Park Water System Rehabilitation
This file contains comprehensive construction drawings for the rehabilitation of water distribution lines at Glacier Bay National Park and Preserve in Alaska. The project involves installing approximately 215,000 linear feet of new water mains ranging from 6 to 10 inches in diameter, with associated infrastructure including gate valves, fire hydrants, blowoff valves, air release valves, and water service connections to various park facilities. The work includes three primary phasing zones: Station 100+00 to 109+70 (to be completed first to ensure water service continuity), Station 10+00 to 25+00 (must be completed outside visitor season May 15–September 15), and Station 200+00 to 215+27 (also restricted to non-visitor season). The drawings specify High-Density Polyethylene (HDPE) DR 11 pipe as the primary material with detailed connection details to existing water infrastructure, including tie-ins to six-inch and eight-inch ductile iron and polyvinyl chloride mains.
The construction documents establish critical operational and environmental requirements, including maintenance of water and sanitary sewer service to all buildings during construction, mandatory archaeological monitoring during all ground disturbance activities, and a Storm Water Pollution Prevention Plan (SWPPP). Contractors must maintain pedestrian and emergency vehicle access throughout construction with maximum traffic delays of 10 minutes, implement tree protection measures within five feet of the centerline (outside disturbance limits), and restore all disturbed surfaces to pre-construction or better condition. The drawings include detailed specifications for trench excavation, pipe bedding, mechanical joint restraints, water-sewer separation distances (minimum 10 feet parallel, 18 inches at crossing points), valve installation, backfill procedures, and asphalt patching. Material staging is restricted to a designated lot outside the park boundary, and the contractor must coordinate with the Contracting Officer regarding any deviations from the approved phasing plan or environmental compliance procedures.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE OF MILES
35 0 35
2,000
SCALE OF FEET
SCALE OF METERS
2,000
50 0 50
0 6,000
100 150
4,000
GLACIER BAY NATIONAL PARK AND PRESERVE
TELEPHONE
VISITOR CENTER
RESTROOMS
PARKING
UNPAVED ROAD
INFORMATION CENTER
PICNIC AREA
V.C.
RIVER OR CREEK
STATE LINE
COUNTY LINE
PAVED ROAD
PARK BOUNDARY
LEGEND
STATE
NATIONAL PARK SERVICE
DENVER SERVICE CENTER REGION BOROUGH
DEPARTMENT OF THE INTERIOR
UNITED STATES LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING
989A
20HOONAH ALASKA OF
PKG.
NO. SHEET
DRAWING NO.
GLACIER BAY NATIONAL PARK AND PRESERVE
ALASKA
ALASKA
REHAB WATER SERVICE LINES
BARTLETT COVE
THIS PROJECT
CONSTRUCTION DRAWINGS
187563
132AT BARTLETT COVE HOUSING
AMPHITHEATER
GAS STATION / GASOLINE
AIRPORT
CAMPGROUND
RESTAURANT / FOOD SERVICE
RANGER STATION
SCHOOL
APPROX. PROJECT BOUNDARY
PARK HEADQUARTERSHQ.
100% COMPLETE
ABBREVIATIONS
APPROX. APPROXIMATE
BLDG. BUILDING
COMM. COMMUNICATIONS
CONC. CONCRETE
CP CONTROL POINT
CMP CORRUGATED METAL PIPE
CPP CORRUGATED PLASTIC PIPE
D DIAMETER
DI DUCTILE IRON
ELEV. ELEVATION
FM FORCE MAIN
UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU UGU
NG NG NG NG NG
EFM EFM
ESW ESW
X X X X X X
UGT UGT UGT UGT
UGP UGP UGP
DJ&A CONTROL POINT140
125.77 EXISTING - SPOT ELEVATION
GW
E
DY
H
T
S
W
W
MH
E
WV
WM
E
GWM
T
ETE
FM
EM
EXISTING - EDGE OF GRAVEL
EXISTING - TOE OF BANK
EXISTING - SEWER FORCE MAIN
EXISTING - ROAD CENTER
EXISTING - CULVERT
EXISTING - BUILDING
EXISTING - DECK
EXISTING - BUILDING - MISCELLANEOUS
EXISTING - UNDERGROUND WATER LINE
EXISTING - TOP OF BANK
EXISTING - UTILITY - MISCELLANEOUS
EXISTING - STEPS
EXISTING - UNDERGROUND GAS
EXISTING - GENERAL CONCRETE SLAB LINE
EXISTING - BUILDING OVERHANG
EXISTING - TRAIL OR FOOT PATH
EXISTING - EDGE OF ASPHALT
EXISTING - ROAD SHOULDER
EXISTING - DITCH LINE
EXISTING - TREE LINE
EXISTING - SIGN
EXISTING - TIMBER
EXISTING - TOP OF RETAINING WALL
EXISTING - BOTTOM OF RETAINING WALL
EXISTING - WOODEN VERTICAL BOARD FENCE
EXISTING - MISCELLANEOUS
EXISTING - FENCE GATE
EXISTING - UNDERGROUND STORM WATER LINE
EXISTING - CHAIN LINK FENCE
EXISTING - MINOR CONTOUR
EXISTING - MAJOR CONTOUR
EXISTING - UNDERGROUND COMMUNICATIONS
EXISTING - UNDERGROUND POWER
EXISTING TELEPHONE/COMMUNICATIONS PEDESTAL
EXISTING LIGHT POLE
EXISTING MISCELLANEOUS MANHOLE OR GENERAL UNDERGROUND UTILITY BOX
EXISTING SANITARY SEWER MANHOLE
EXISTING WATER WELL
EXISTING WATER VALVE
EXISTING SANITARY SEWER CLEANOUT ACCESS OR TANK RISER
EXISTING WATER HYDRANT
EXISTING SIGN (SINGLE POST)
EXISTING ELECTRIC MANHOLE
EXISTING ELECTRIC TRANSFORMER
EXISTING ELECTRIC MISC - OUTLET OR OTHER MISC. ELECTRIC
EXISTING GROUNDWATER MONITORING WELL
EXISTING GAS WELL OR MANHOLE
EXISTING WATER METER
EXISTING WATER MANHOLE OR WATER TANK LID
EXISTING WATER BLOWOFF
EXISTING WATER HOSEBIB, FAUCET, OR SPIGOT OUTLET
EXISTING GUY WIRE (THE GROUND CONNECTION POINT)
EXISTING BOLLARD
EXISTING LARGE ROCK OR BARRIER BOLLARD TYPE ROCK
EXISTING DECIDUOUS TREE (AS NOTED)
EXISTING CONIFEROUS TREE (AS NOTED)
EXISTING STORM ROOF DROP INLET/OUTLET - POINT
EXISTING UTILITY MARKER
EXISTING - BUILDING FINISHED FLOOR ELEVATION SURVEY SHOT
EXISTING SANITARY SEWER FORCE MAIN VALVE
EXISTING ELECTRIC METER
POINT SYMBOLOGY
HC HANDICAPPED
HDPE HIGH-DENSITY POLYETHYLENE
HQ HEADQUARTERS
INV. INVERT
MH MANHOLE
RD. ROAD
SAN. SANITARY
ST. STREET
TYP. TYPICAL
UTIL. UTILITY
W WATER
EW EW EW
1. THE UTILITIES SHOWN IN THESE CONSTRUCTION DRAWINGS ARE INDICATED IN ACCORDANCE WITH AVAILABLE RECORDS. ALL UTILITIES MAY NOT BE SHOWN, AND THOSE THAT ARE SHOWN MAY NOT BE SHOWN ACCURATELY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING TO DETERMINE THE EXACT LOCATIONS, ELEVATIONS, AND SIZES OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL NPS AND NON-NPS-OWNED UTILITIES. REPAIR OR REPLACE ANY DAMAGED EXISTING UTILITIES, AS SPECIFIED IN SECTION 011100 "SUMMARY OF WORK". THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF 2 FEET SEPARATION BETWEEN ALL EXISTING DRY UTILITIES AND NEW WATER AND SEWER INSTALLATIONS.
2. MAINTAIN SANITARY SEWER SERVICE TO ALL BUILDINGS DURING CONSTRUCTION. INSTALL BY-PASS PIPING/PUMPING AS NEEDED TO MAINTAIN SERVICE, AS
SPECIFIED IN SECTION 333000 "SANITARY SEWER COLLECTION SYSTEMS".
3. MAINTAIN WATER SERVICE TO ALL BUILDINGS DURING CONSTRUCTION. INSTALL TEMPORARY WATER PIPING & APPURTENANCES AS NEEDED. SHORT INTERRUPTIONS FOR TIE-INS ARE ALLOWED, AS SPECIFIED IN SECTION 011100, "SUMMARY OF WORK”.
4. ALL MINOR OBSTRUCTIONS MAY NOT BE SHOWN ON CONSTRUCTION DRAWINGS. THE CONTRACTOR SHALL REVIEW THE SITE PLANS AND DETERMINE THE CONDITIONS WITH REGARD TO THE EXISTENCE OF FENCES, DRIVEWAYS, TREES, BOULDERS, SIDEWALKS, CULVERTS, UTILITIES AND OTHER SITE IMPROVEMENTS AND MISCELLANEOUS OBSTACLES THAT MAY INTERFERE WITH CONSTRUCTION PRIOR TO SUBMITTING PROPOSALS.
5. PROVIDE TEMPORARY SUPPORT FOR EXISTING WET (WATER, SANITARY SEWER, ETC.) AND DRY UTILITIES (GAS, POWER, ETC.) THAT CROSS THE TRENCH UNTIL
BACKFILLING OF THE TRENCH IS COMPLETE.
6. ASBESTOS CEMENT PIPE TO BE ABANDONED SHALL REMAIN IN PLACE. CUTTING IS NOT PERMITTED. IF AVOIDANCE IS NOT FEASIBLE, THE CONTRACTOR SHALL COORDINATE REMOVAL WITH THE CO. ALL OTHER ABANDONED PIPE MATERIALS MAY BE CUT IN PLACE AT TRENCH WALLS.
7. CONSTRUCTION SHALL COMPLY WITH ENVIRONMENTAL PROTECTION AGENCY REGULATIONS, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, AND STATE
OF ALASKA REGULATIONS.
8. THE CONTRACTOR SHALL ONLY DISTURB WITHIN THE LIMITS OF DISTURBANCE SPECIFIED AND SHOWN ON THE CONSTRUCTION DRAWINGS. NO GROUND DISTURBANCE SHALL OCCUR OUTSIDE THE DISTURBANCE LIMITS UNLESS APPROVED BY THE CONTRACTING OFFICER. ALL DISTURBED AREAS MUST BE RESTORED
TO PRE-CONSTRUCTION OR BETTER CONDITIONSPRIOR TO THE COMPLETION OF WORK.
9. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND MAINTAINING A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AS SPECIFIED IN SECTION 015723.
THE CONTRACTOR SHALL NOT INTRODUCE OR TRANSPORT EXOTIC AND NON-NATIVE PLANTS INTO THE PARK. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO
MAINTAIN ROADSIDE DITCHES AND SWALES AND PREVENT EROSION THROUGHOUT THE PROJECT.
10. THE CONTRACTOR WILL COORDINATE ALL WORK WITH THE NPS-PROVIDED ARCHEOLOGICAL MONITOR WHEN TRENCHING OR EXCAVATING.
11. STRIP TOPSOIL AND STOCKPILE FOR REPLACEMENT AS SPECIFIED IN ALL AREAS OF EXCAVATION AND DISTURBANCE.
12. RESTORE ALL SURFACES DISTURBED AS SPECIFIED AND SHOWN ON THE CONSTRUCTION DRAWINGS.
13. CONTRACTOR SHALL MAINTAIN SAFE AND CONTINUOUS PEDESTRIAN ACCESS THROUGHOUT CONSTRUCTION. A PEDESTRIAN PHASING PLAN SHALL BE DEVELOPED TO ADDRESS TEMPORARY ROUTES, SIGNAGE, AND PROTECTIVE MEASURES. ANY MODIFICATIONS TO PEDESTRIAN ACCESS REQUIRE PRIOR APPROVAL FROM THE
CONTRACTING OFFICER.
14. THE CONTRACTOR SHALL LIMIT ROAD CLOSURES TO HALF-WIDTH TO ENSURE CONTINUOUS ACCESS FOR NPS EMERGENCY AND OPERATIONS VEHICLES. FLAGGERS MAY BE USED TO CONTROL GENERAL TRAFFIC, WITH WAIT TIMES NOT EXCEEDING 10 MINUTES.
15. AN NPS ARCHAEOLOGICAL MONITOR IS REQUIRED TO BE PRESENT DURING ALL CONSTRUCTION EXCAVATION ACTIVITY.
16. VERTICAL DEFLECTIONS IN HDPE PIPE SHALL BE ACHIEVED USING THE MANUFACTURER'S RECOMMENDED BENDING RADIUS WHENEVER POSSIBLE. WHERE THE REQUIRED DEFLECTION EXCEEDS THE ALLOWABLE BENDING RADIUS, VERTICAL BENDS OR FITTINGS SHALL BE USED.
17. WRAP ALL DIRECT BURY CAST IRON OR DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND
SURFACES, IN POLYETHYLENE ENCASEMENT.
CIVIL DRAWINGS LEGEND - EXISTING CIVIL DRAWINGS LEGEND - PROPOSED
W 6''
PROPOSED - 6" WATER MAIN
W 8''
PROPOSED - 8" WATER MAIN
W 10''
ARV
H Y D
GV
PROPOSED - 10" WATER MAIN
PROPOSED - GATE VALVE
PROPOSED - AIR RELEASE VALVE
PROPOSED - FIRE HYDRANT
PROPOSED - BLOWOFF VALVE
WM PROPOSED - WATER METER
GENERAL NOTES
EFM EFM
EXISTING - SEWER FORCE MAIN FROM NPS AS-BUILTS
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
-0 3-
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
LEGEND
GENERAL NOTES
AND ABBREVIATIONS
187563
EA
EA
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
C0.1
SHEET INDEX
SHEET NO. SUB-SHEET NO. SHEET TITLE
1 - COVER
2 C0.1 LEGEND, GENERAL NOTES, AND
ABBREVIATIONS
3 C0.2 EXISTING SITE PLAN AND CONTROL POINT
MAP
4 C0.3 DEMOLITION PLAN
5 C0.4 PHASING PLAN
6 C1.0 WATER SYSTEM SHEET INDEX
7 C1.1 WATER SYSTEM LAYOUT POINTS
8 C1.2 WATER P&P STA 10+00 TO 15+00
9 C1.3 WATER P&P STA 15+00 TO 20+00
10 C1.4 WATER P&P STA 20+00 TO 25+00
11 C1.5 WATER P&P STA 100+00 TO 105+00
12 C1.6 WATER P&P STA 105+00 TO 109+70
13 C1.7 WATER P&P STA 200+00 TO 205+00
14 C1.8 WATER P&P STA 205+00 TO 210+00
15 C1.9 WATER P&P STA 210+00 TO 215+27
16 C2.0 WATER SYSTEM CONNECTION DETAILS 1
17 C2.1 WATER SYSTEM CONNECTION DETAILS 2
18 C2.2 WATER SYSTEM DETAILS 1
19 C2.3 WATER SYSTEM DETAILS 2
20 C2.4 WATER SYSTEM DETAILS 3
FINISHED GROUND ELEV.
AT CENTERLINE OF PIPE
1+00
.5
2 PROFILE VIEW ELEVATION
BAND (BOTTOM OF GRAPH)
.0
TOP OF PIPE ELEV. AT
CENTERLINE OF PIPE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
UGT
UGT
UGT
UG
T
UGT
UGT
U G
T
UGT
UGT
U G
T
UGT
UGT
EFM
EFM
UG
P
UGP
UG
P
3" HDPE FM
UGP
UGP
UGP
EFM
EF
M
EFM EFM
EFM
EFM
EFM
UGP
UGP
6" SEWER
6" SEW
ER
2-
1/ 2"
FM
ES
UG
P
UG
P
UG
T
ES
ES
UGU
UGU
3" H
DP
E
FM
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
U G
T
UGT
U G
T
U G
T
UGT
U G
T
UGT
UGT UGT UGT
UGT
UGT
UGT UGT UGT
UGT
UG
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT
UG
T
UGT
UG
T
UGT
UGT
UGT
UGT
UGT
UGT UGT
UG
T
UG
T
UG
T
UGT
UGT UGT UGT
UGT
UG
T
UG
T
UG
T
UGT
UGT UGT UGT
UGT
UGT
UGT
U G
T
UGT
U G
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
U G
T
UGP
UGP
UGP
UGT
UGT
UGT UGT
UGT
UGT
UGT
UGT
UGT
ES
WV
WV
WV
EW
EW
EW EW
EW
EW EW EW
EW
EW
EW
EW
EW
EW
EFM
EFM
PARK ROAD
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
-0 3-
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
EXISTING SITE PLAN
AND CONTROL POINT MAP
187563
EA
EA
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
N
SCALE IN FEET
0 150 300
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
GLACIER BAY
HEADQUARTERS
MAIN DOCK
EMPLOYEE
HOUSING AREA
INNER DOCK
FUEL DOCK
C0.2EXISTING SITE PLAN AND CONTROL POINT MAP
EW EW EW
EW
EW
WASTEWATER
TREATMENT PLANT
GLACIER BAY VISITOR
INFORMATION STATION
HOONAH CULTURAL
BUILDING
MAINTENANCE
BUILDING
WATER TREATMENT
PLANT
GLACIER BAY LODGE
TLING
IT TRAIL
TWO EXISTING WATER
STORAGE TANKS AT
100,000 GALLONS EACH
NEW DORM
BUILDING
SURVEY NOTES:
1) HORIZONTAL AND VERTICAL UNITS SHOWN HEREON ARE LISTED AS U.S.
SURVEY FEET.
2) HORIZONTAL INFORMATION: COORDINATE VALUES AND DISTANCES SHOWN
HEREON ARE STATE PLANE VALUES AND ARE IN REFERENCE TO U.S. STATE
PLANE COORDINATE SYSTEM, ALASKA STATE PLANE ZONE 1 (5001), NORTH
AMERICAN DATUM 1983 [NAD83(2011)].
3) VERTICAL INFORMATION: GNSS DERIVED ELEVATIONS WERE UTILIZED FOR ALL
MAPPING POINTS ON THIS PROJECT AND IS IN REFERENCE TO NORTH AMERICAN
VERTICAL DATUM OF 1988 (NAVD88) UTILIZING GEOID 12B.
4) THE BASIS OF BEARING FOR THIS PROJECT IS GRID NORTH OF ALASKA STATE
PLANE ZONE 1 (5001).
5) FIELDWORK WAS PERFORMED BETWEEN: OCTOBER 18-27, 2023
CP-1
CP-2
STAGING AREA
GWMGWM
GWM
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
UGT
UGT
UGT
UG
T
UGT
UGT
U G
T
UGT
UGT
U G
T
UGT
UGT
EFM
EFM
UG
P
UGP
UG
P
3" HDPE FM
UGP
UGP
UGP
EFM
EFM
EFM
UGP
UGP
6" SEWER
6" SEW
ER
2"
FM
ES
UG
P
UG
P
UG
T
ES
ES
UGU
UGU
3" H
DP
E
FM
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
UG
T
UGT
U G
T
UG
T
UGT
U G
T
UGT
UGT UGT UGT
UGT
UGT
UGT UGT UGT
UGT
UG
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT
UG
T
UGT
UG
T
UGT
UGT
UGT
UGT
UGT
UGT UGT
UG
T
UG
T
UG
T
UGT
UGT UGT UGT
UGT
UG
T
UG
T
UG
T
UGT
UGT UGT UGT
UGT
UGT
UGT
U G
T
UGT
U G
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
U G
T
UGP
UGP
UGP
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
WV
WV
EW
EW
EW
EW
EW
EW
EW
EW
EFM
EFM
PARK ROAD
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
-0 3-
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
DEMOLITION PLAN
187563
EA
EA
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
N
SCALE IN FEET
0 150 300
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
1 FIRE HYDRANT SHED TO BE REMOVED, HYDRANT TO BE PROTECTED IN PLACE
TWO EXISTING WATER
STORAGE TANKS AT
100,000 GALLONS EACH
GLACIER BAY
HEADQUARTERS
MAIN DOCK
INNER DOCK
FUEL DOCK
C0.3
DEMOLITION PLAN
EW EW EW
EW
EW
WASTEWATER
TREATMENT PLANT
GLACIER BAY VISITOR
INFORMATION STATION
HOONAH CULTURAL
BUILDING
MAINTENANCE
BUILDING
WATER TREATMENT
PLANT
GLACIER BAY LODGE
TLING
IT TRAIL
2 BUILDING WATER SERVICE VAULT TO BE REMOVED AND FILLED PER TOPSOIL
PATCH ON DETAIL D/C2.3
3 ASPHALT REMOVAL AND PATCHING ALONG PROPOSED WATER ALIGNMENT
EMPLOYEE
HOUSING AREA
NEW EMPLOYEE
HOUSING BUILDING
DEMOLITION NOTES
1. CUT AND CAP EXISTING PIPES BEING ABANDONED AT CONNECTION POINTS TO PROPOSED SYSTEM IN TRENCH WALLS.
LOT FOR CONSTRUCTION TRAILER
AND ANY MATERIAL STAGING. ALL
OTHER MATERIAL STAGING MUST
OCCUR OUTSIDE OF PARK
BOUNDARY
ETE
ETE
UGT UGT
U G
T U
G T
UGT
UGT
UGT
U G
T U
G T
UGT
UGT
UGT
UGP
UG
P
UGP
UGP
UG
P
6" W
3" HDPE FM
EFM
6" W
UGP
UGP
UGP UGP
UGP
UGP
6" DI
6" DI
EFM EFM
EFM EFM EFM
EFM
EFM
EFM
EFM
UGP
UGP
2"
FM
8"
DI W
UGP
UG
P
ES
UGU
UGU
3" H
DP
E
FM
6" DI
6" DI
6" D
I
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
8" DI W
UG
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT UGT UGT
UGT
U G
T
UGT
UGT
U G
T
UGT
UGT
UGT
UGT
UGT
U G
T
UGT
UGT UGT
U G
T
UG
T
UG
T
UG
T
UG
T
UG
T
UGT UGT UGT UGT UGT
UGT
UGT
U G
T
UG
T
UG
T
UG
T
UG
T
UG
T
UGT UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
U G
T
U G
T U
G T
UGT
U G
T U
G T
UGT
UGT
UGT
UGT
UG
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT U
G
T U
G T
UGP
UGP
UGP
UGP
UGP
UGT
UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
WV
WV
W
E
WV
WV
W
WV
E
WV
E
WV
WV
WV
WV
WV
WV
WV
S
WV
WV
WV
WV
WV
WVW
W
WV
WVWVWV
WVWV
WV
WVWV
WV
WV
WV
WV
WV
EE
WV
WV
DY
H
WV
T
ES
WV
WV
DY
H
WV
EEEE
TT
WVWV
S
S
S
W
WV
WVWV
WV
WV
WVWV
T
E E
TT
T E
E
EM
E
E
E E
WM
E E T
T
S
S
S
S
T
DY
HT
EM
EW
E E
DY
H
T
T
EM
T
T
DY
HE
E
EM
T
EM
DY
H
EMTE ET
T
EE
S
DY
H
T
E E
DY
H
W
DY
H
6" W
6" W
6" PVC
6" P
VC
6" P
VC
6" PVC
6" W
6" DI
6" DI
6" W
6" W
2" W
2" W
2" DI
2" DI
4" D
I
4" W
" D
I
6"
6" W
FROM RESERVOIR
TO RESERVOIR
WV
WV
WV
EW
EW
EW
EW
EW
EW
EW
EW EW
EW
EW
EW
EW
EW
EW
EW
W S
H Y D
H Y D
EFM EFM
EFM
EFM
EFM
EFM
ARV
WM
WM
WM
WM
W 6''
W 6''
W 6''
W 6''
W 6''
W 8''
W 10''
W 10''
W 10''
ARV
GV
GV
GV
G V
GV
GV
G V
GV
G V
GV GV
G V
G V
G V
GV
GV
G V
W 8'' W 8''
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
-0 3-
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
PHASING PLAN
187563
EA
EA
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
N
SCALE IN FEET
0 150 300
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
C0.4
PARK ROAD
TWO EXISTING WATER
STORAGE TANKS AT
100,000 GALLONS EACH
GLACIER BAY
HEADQUARTERS
INNER DOCK
HOONAH CULTURAL
BUILDING
WATER TREATMENT
PLANT
TLING
IT TRAIL
EMPLOYEE
HOUSING AREA
STA: 100+00 - 109+70 SHALL BE
COMPLETED FIRST TO ENSURE
WATER SERVICE TO THE PARK
PHASING PLAN NOTES
1. PHASING PLAN SUBMITTAL: THE CONTRACTOR SHALL SUBMIT A PHASING PLAN TO THE
CONTRACTING OFFICER (CO) THAT ALIGNS WITH THE REQUIREMENTS OUTLINED ON THIS
SHEET AND IN DIVISION 1 SPECIFICATIONS. ANY DEVIATIONS FROM THE APPROVED PLAN
MUST BE REVIEWED AND APPROVED BY THE CO.
2. DATE LIMITATIONS: WORK SHALL COMPLY WITH THE DATE LIMITATIONS SPECIFIED IN
SPECIFICATION SECTION 01 11 00. ANY REQUIRED WORK OUTSIDE OF THESE LIMITATIONS
MUST BE COORDINATED AND APPROVED IN ADVANCE.
3. TRAFFIC CONTROL: THE CONTRACTOR SHALL IMPLEMENT AN APPROVED TRAFFIC CONTROL
PLAN IN ACCORDANCE WITH DIVISION 1 SPECIFICATIONS TO MAINTAIN SAFE ACCESS FOR
VEHICLES AND PEDESTRIANS. FLAGGERS MAY BE USED AS NECESSARY TO CONTROL
TRAFFIC FLOW.
4. EMERGENCY AND NPS OPERATIONS ACCESS: THE CONTRACTOR SHALL ENSURE IMMEDIATE
ACCESS FOR NPS EMERGENCY AND OPERATIONS VEHICLES AT ALL TIMES. GENERAL
VEHICULAR TRAFFIC MAY EXPERIENCE A MAXIMUM DELAY OF 10 MINUTES.
5. PEDESTRIAN ACCESS: THE CONTRACTOR SHALL DEVELOP AND MAINTAIN A PEDESTRIAN
ACCESS PLAN TO ENSURE SAFE AND CONTINUOUS PEDESTRIAN MOVEMENT THROUGH THE
CONSTRUCTION AREA. ANY MODIFICATIONS TO PEDESTRIAN ACCESS MUST BE APPROVED
BY THE CO.
6. ARCHAEOLOGICAL MONITORING: ARCHAEOLOGICAL MONITORING BY AN NPS-DESIGNATED
REPRESENTATIVE SHALL BE CONDUCTED DURING ALL WORK INVOLVING GROUND
DISTURBANCE. THE CONTRACTOR SHALL COORDINATE WITH THE CO TO ENSURE
COMPLIANCE.
STA: 200+00-215+27
MUST BE COMPLETED
OUTSIDE OF PARKS
VISITOR SEASON OF
MAY 15TH - SEPT 15TH.
STA: 19+16 - 24+85
MUST BE COMPLETED
OUTSIDE OF PARKS
VISITOR SEASON OF
MAY 15TH - SEPT 15TH.
LOT FOR CONSTRUCTION TRAILER
AND ANY MATERIAL STAGING. ALL
OTHER MATERIAL STAGING MUST
OCCUR OUTSIDE OF PARK
BOUNDARY
GWMGWM
GWM
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
UGT
UGT
UGT
UG
T
UGT
UGT
U G
T
UGT
UGT
U G
T
UGT
UGT
EFM
EFM
UG
P
UGP
UG
P
6" W
3" HDPE FM
6" W
UGP
UGP
UGP
6" DI
6" DI
6" DI
6" DI
6" DI
6" DI
6" DI
EFM
EFM
EFM
UGP
UGP
6" SEWER
6" SEW
ER
2"
FM
ES
8"
DI W
8" D
I W
UG
P
UG
P
UG
T
ES
ES
UGU
UGU
3" H
DP
E
FM
6" DI
6" DI
6" D
I
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
ETE
8" DI W
UG
T
UGT
U G
T
UG
T
UGT
U G
T
UGT
UGT UGT UGT
UGT
UGT
UGT UGT UGT
UGT
UG
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT
UG
T
UGT
UG
T
UGT
UGT
UGT
UGT
UGT
UGT UGT
UG
T
UG
T
UG
T
UGT
UGT UGT UGT
UGT
UG
T
UG
T
UG
T
UGT
UGT UGT UGT
UGT
UGT
UGT
U G
T
UGT
U G
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
U G
T
UGP
UGP
UGP
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
6" W
6" W
6" PVC
6" P
VC
6" P
VC
6" PVC
6" W
6" DI
6" DI
4" W
6" W
6" W
2" W
2" W
2" DI
2" DI
4" D
I
4" W
" D
I
6"
6" W
FROM RESERVOIR
TO RESERVOIR
WV
WV
EW
EW
EW
EW
EW
EW
EW
EW
H Y D
H Y D
EFM
EFM
EFM
ARV
WM
WM
WM
WM
W 6''
W 6''
W 6''
W 8''
W 10''
W 10''
ARV
GV
GV
GV
G V
GV
GV
G V
GV
G V
GV GV
G V
G V
G V
GV
GV
G V
W 8''
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
-0 3-
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
WATER SYSTEM
SHEET INDEX
187563
EA
EA
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
N
SCALE IN FEET
0 150 300
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
SEE SHEETS C1.5-C1.6
SEE SHEETS C1.2-C1.4
SEE SHEET C1.7-C1.9
GLACIER BAY
HEADQUARTERS
MAIN DOCK
INNER DOCK
FUEL DOCK
C1.0
EMPLOYEE
HOUSING AREA
TWO EXISTING WATER
STORAGE TANKS AT
100,000 GALLONS EACH
NEW DORM BUILDING
BY OTHERS
UGT UGT
U G
T U
G T
UGT
UGT
UGT
U G
T U
G T
UGT
UGT
UGT
UGP
UGP
UGP
UG
P
3" HDPE FM
6" W
UGP UGP
UGP
UGP
6" DI
6" DI
EFM EFM
EFM
2"
FM
8"
DI W
UGP
UG
P
3" H
DP
E
FM
6" DI
6" DI
6" D
I
ETE
ETE
ETE
ETE
ETE
ETE
ETE
8" DI W
UGT
UGT
UGT UGT UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT
UGT
U G
T
UGT
UGT UGT
U G
T
UG
T
UG
T
UG
T
UG
T
UG
T
UGT UGT UGT UGT UGT
UGT
UGT
U G
T
UG
T
UG
T
UG
T
UG
T
UG
T
UGT UGT UGT UGT UGT
UGT
UGT
UGT
U G
T
U G
T U
G T
UGT
U G
T U
G T
UGT
UGT
UGT
UGT
UG
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT U
G
T U
G T
UGP
UGP
UGP
UGP
UGP
UGT
UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
6" W
6" W
6" P
VC
6" PVC
6" W
6" DI
6" W
2" W
2" W
2" DI
2" DI
4" D
I
4" W
" D
I
6"
6" W
FROM RESERVOIR
TO RESERVOIR
WV
WV
WV
EW
EW
EW
EW
EW EW
EW
EW
EW
EW
H Y D
H Y D
EFM EFM
EFM
ARV
WM
WM
WM
WM
W 6''
W 6''
W 6''
W 6''
W 6''
W 8''
W 10''
W 10''
W 10''
ARV
GV
GV
GV
GV
GV
GV
G V
GV
G V
GV GV
G V
G V
G V
GV
GV
G V
W 8'' W 8''
1028 1029
1043 1044
LAYOUT POINT TABLE
POINT #
NORTHING
2425414.09
2425414.09
2425414.03
2425411.13
2425447.29
2425467.24
2425467.46
2425467.63
2425552.52
2425565.94
2425610.18
2425592.71
2425056.07
2425052.61
2425054.10
2425165.58
2425165.91
2425167.93
2425169.47
2425163.20
2424975.78
2424973.76
2424972.54
2425025.08
2425025.80
2425051.47
2425000.47
2425000.80
2425001.08
2425001.39
2424999.83
2424998.26
2424941.39
2424862.64
2424750.92
2424373.94
2424371.99
2424358.77
2424357.94
2424357.08
2424320.43
2424304.63
2424978.97
2424968.56
2425024.01
EASTING
2262254.20
2262256.71
2262259.44
2262256.42
2262425.94
2262575.47
2262577.97
2262579.56
2262806.99
2262845.19
2262961.63
2263126.18
2263218.40
2263216.86
2263213.52
2262965.87
2262962.05
2262962.41
2262962.87
2262961.43
2262857.42
2262857.19
2262290.79
2262171.63
2262170.20
2263219.43
2263382.57
2263385.59
2263386.96
2263388.53
2263385.79
2263386.11
2263364.28
2263330.10
2263415.16
2263804.62
2263804.17
2263880.05
2263884.16
2263888.10
2263980.28
2263982.78
2262188.56
2262209.13
2262173.78
DESCRIPTION
6" GATE VALVE, CONNECT TO EXISTING WATER MAIN
6" X 6" X 6" HDPE TEE
6" GATE VALVE
6" GATE VALVE
2" WATER SERVICE TO RESIDENCE
2" WATER SERVICE TO RESIDENCE
6" X 6" X 6" TEE TO FIRE HYDRANT
AIR/VAC RELEASE VALVE
2" WATER SERVICE TO RESIDENCE
6" X 6" X 6" TEE TO FIRE HYDRANT
2" WATER SERVICE TO RESIDENCE
6" HDPE 45° BEND
6" GATE VALVE
6" X 8" X 8" HDPE TEE
8" GATE VALVE
8" GATE VALVE
8" X 8" X 8" HDPE TEE
8" X 6" HDPE REDUCER
6" GATE VALVE
8" GATE VALVE
BLOWOFF VALVE
8" HDPE 90° BEND
AIR/VAC RELEASE VALVE
8" GATE VALVE
8" X 6" REDUCER CONNECT TO EXISTING 6" WATER MAIN
8" GATE VALVE
8" GATE VALVE
8" X 8" X 8" HDPE TEE
8" X 6" HDPE REDUCER
6" GATE VALVE, CONNECT TO EXISTING 6" WATER MAIN
10" X 8" HDPE REDUCER
10" GATE VALVE
BLOWOFF VALVE
10" HDPE 45° BEND
2" WATER SERICE CONNECTION TO WATER TREATMENT PLANT
8" X 10" X 10" HDPE TEE
8" GATE VALVE, CONNECT TO EXISTING 8" DI WATER MAIN
6" X 10" X 10" HDPE TEE
10" GATE VALVE
6" X 10" X 10" HDPE TEE
10" HDPE 45° BEND
10" X 10" X 10" HDPE TEE, CONNECT TO EXISTING
8" HDPE 45° BEND
8" HDPE 22.5° BEND
8" HDPE 45° BEND
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
-0 3-
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
WATER SYSTEM
LAYOUT POINTS
187563
EA
EA
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
N
SCALE IN FEET
0 100 200
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
INNER DOCK
C1.1
EMPLOYEE
HOUSING AREA
TWO EXISTING WATER
STORAGE TANKS AT
100,000 GALLONS EACH
ETE
UGP
UGP
UGP
UGP
UGP UGP
UGP UGP UGP UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT
UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT
WV
WV
W
WV
E
WV
WV
WV
S
T
EM
DY
H
EM
T E E T
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW EW EW EW EW EW EW
W S
W S
WS
W S
H
Y DW
S
W S
W S
W S
ARV
WM
WM
W 6'' W 6'' W 6''
W 6''
W 6''
W 6'' W 6''
W 6''
W 6''
W 6''
GV
GV
G V
GV
10+00
11+00 12+00
13+00 14+00
15+00
10+00
.9
.6
.1
.4
.2
.1
.3
.2
.6
11+00
.8
.3
.4
.0
.0
.7
.6
.3
.2
.9
12+00
.9
.5
.5
.1
.9
.4
.3
.7
.4
.0
13+00
.4
.1
.2
.0
.3
.9
.1
.9
.3
.8
14+00
.4
.7
.1
.6
.7
.5
.9
.5
.5
.2
15+00
.8
.6
6" G
AT
E
VA
LV
E C
O N
N
EC
T
TO
E
XI
ST
IN
G
ST
A
+0
7.
6" X
" X
" H
D
PE
T
EE
ST
A
+0 9.
6" G
AT
E
VA
LV
E
ST
A
+1
2.
EX
IS
TI
N
G
2" C
PP
C
U
LV
ER
T
C R
O
SS
IN
G
ST
A
+3 5.
IN
V.
E
LE
V
.7
2" H
D
PE
W
AT
ER
SE
R
VI
C E
C O
N N
EC
TI
O N
ST
A
+8 2.
2" H
D
PE
W
AT
ER
SE
R
VI
C E
C O
N N
EC
TI
O N
ST
A
+3 3.
6" F
IR
E
H
YD
R
AN
T C
O N
N
EC
TI
O
N
ST
A
+3
6.
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
EL
EC
TR
IC
U
TI
LI
TY
C
R O
SS
IN
G
ST
A
+2
5.
AS
SU
M
ED
E
LE
V
.1
AI
R
/V
AC
R
EL
EA
SE
V
AL
VE
ST
A
+3
7.
6" G
AT
E
VA
LV
E
ST
A
+8
1.
H Y D
H Y D
ARV
WM
WM
WM
WM
ARV
GV
GV
GV
GV
GV
GV
GV
GV
GV
GV GV
GV
GV
GV
GV
GV
GV
PROFILE
PLAN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:1
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
\0
3_
TL
IN
G
IT
T
R
AI
L.
D
W G
WATER DISTRIBUTION
PLAN AND PROFILE
STA 10+00 TO 15+00
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989AC1.2
SCALE IN FEET
0 20 40
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
KEY MAP
NTS
N
SEE SH
EET C
1.3
6" GATE VALVE, CONNECT TO
EXISTING 6" PVC MAN.
CONTRACTOR TO VERIFY DEPTH,
SIZE, MATERIAL, AND LOCATION
OF EXISTING
FINISH GRADE
6" HDPE DR 11 WATER MAIN
4' MIN. BURY
6" GATE VALVE, CONNECT TO
EXISTING 6" DUCTILE IRON MAIN.
CONTRACTOR TO VERIFY DEPTH,
SIZE, MATERIAL, AND LOCATION
OF EXISTING
STA: 10+07.45
6" GATE VALVE
STA: 10+12.30
6" X 6" X 6" HDPE TEE
STA: 10+09.95
12" CMP CULVERT
CROSSING
STA: 10+35.94
INV ELEV: 35.75
2" HDPE WATER
SERVICE CONNECTION
STA: 13+33.55
6" FIRE HYDRANT
CONNECTION
STA: 13+36.09
2" HDPE WATER
SERVICE CONNECTION
STA: 11+82.63
B C2.2
8' TRENCH DISTURBANCE LIMITS
25' CONSTRUCTION DISTURBANCE LIMITS
A C2.3
C C2.3
A C2.3
B C2.4
B C2.4
A C2.4
EXISTING UNDERGROUND
ELECTRIC UTILITY CROSSING
STA: 10+25.86
PROTECT VEGETATION IN
PLACE, TYP. ALL TREES
WITHIN CONSTRUCTION
DISTURBANCE LIMIT
C
C2.2 EXISTING UNDERGROUND
ELECTRIC UTILITY , TYP.
EXISTING UNDERGROUND
TELEPHONE UTILITY , TYP.
EDGE OF GRAVEL, TYP.
EXISTING 6" PVC WATER MAIN
EXISTING WATER SERVICE TO
BE ABANDONED IN PLACE TYP.EXISTING SHED,
PROTECT IN PLACE
GRAVEL ROAD
10' SERVICE CONSTRUCTION
DISTURBANCE LIMIT
B C2.2
AIR/VAC RELEASE VALVE
STA: 13+37.66
EXISTING 6" DUCTILE
IRON WATER MAIN
G
RA
VE
L
RO
AD
G R
AVEL PATH
BUILDING # Q4
BUILDING # Q9
BUILDING # Q3
6" GATE VALVE
STA 14+81.24
2' TRENCH
DISTURBANCE LIMITS
A C2.3
D C2.4
A C2.0
FIRE HYDRANT ASSEMBLY
A
C2.4
20'
10'
A C2.0
TIE IN TO EXISTING.
CONTRACTOR TO
VERIFY DEPTH,
SIZE, AND MATERIAL
OF EXISTING PIPE
PROVIDE 2" OF
INSULATION OVER THE
WATER PIPE CROSSING
UNDER THE CMP
A C2.3
INSTALL NEW
WATER METER
INSTALL NEW
WATER METER
A C2.2
..\..\..\dja-pwdrive\DJA\7333.12\Survey\05_Photos & Videos\Google Satellite Image\7333.12 Google Satellite image 01-31-2024.tiff
U G
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
U G
T
UGP
UGP
UGP
UGP
UGP UGP
UGP
UGT UGT UGT UGT UGT UGT UGT UGT UGT
UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT
UGT
UGT UGT UGT UGT UGT UGT UGT UGT UGT
UGT UGT UGT UGT UGT UGT
WV
W E
S
EM
TT
DY
H
E
E
EM
EW
EW
EW
EW
EW
EW
EW EW EW EW
EW
EW
EW EW
EW
EW
EW
EW
EW
EW
EW
W S
FS
FS
W S
W S
W S
W S
H
Y D
WM
WM
W 6'' W 6''
W 6'' W 6''
W 6'' W 6''
W 6''
W 6''
W 6''
W 6''
GV 15+00
16+00
17+00
18+00
19+00
20+00
15+00
.8
.6
.8
.3
.8
.5
.4
.0
.4
.8
16+00
.3
.8
.3
.8
.1
.6
.9
.4
.6
.1
17+00
.4
.8
.2
.4
.0
.8
.3
.3
.5
.7
18+00
.4
.9
.6
.9
.3
.8
.7
.2
.9
.0
19+00
.1
.7
.0
.5
.0
.7
.8
.2
.6
.8
20+00
.7
.4
PO
SS
IB
LE
2"
C M
P C
R O
SS
IN
G
ST
A
+7
0.
EL
EV
8.
2" H
D
PE
W
AT
ER
SE
R
VI
C E
C O
N N
EC
TI
O N
ST
A
+8 1.
6" F
IR
E
H
YD
R
AN
T C
O N
N
EC
TI
O
N
ST
A
+2
1.
2" H
D
PE
W
AT
ER
SE
R
VI
C E
C O
N N
EC
TI
O N
ST
A
+4 6.
6"
5° H
D
PE
P
IP
E
FI
TT
IN
G
ST
A
+1
6.
TI
E
IN
E
XI
ST
IN
G
" W
AT
ER
M
AI
N
ST
A
+2
6.
H Y D
H Y D
ARV
WM
WM
WM
WM
ARV
GV
GV
GV
GV
GV
GV
GV
GV
GV
GV GV
GV
GV
GV
GV
GV
GV
N
PLAN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:1
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
\0
3_
TL
IN
G
IT
T
R
AI
L.
D
W G
WATER DISTRIBUTION
PLAN AND PROFILE
STA 15+00 TO 20+00
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
SCALE IN FEET
0 20 40
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
C1.3
KEY MAP
NTS
N
PROFILE
SE
E
SH
EE
T C
1.
BUILDING # Q3
4' MIN. BURY FINISH GRADE
SEE SHEET C1.4
PROTECT VEGETATION IN
PLACE, TYP. ALL TREES
WITHIN CONSTRUCTION
DISTURBANCE LIMIT
TIE INTO EXISTING 2" PVC WATER MAIN,
CONTRACTOR TO VERIFY SIZE, DEPTH,
MATERIAL, AND LOCATION OF EXISTING
STA: 16+26.66
6" FIRE HYDRANT
CONNECTION
STA: 16+21.80
2" HDPE WATER
SERVICE CONNECTION
STA: 15+81.39 2" HDPE WATER
SERVICE CONNECTION
STA: 17+46.75
10' SERVICE
CONSTRUCTION LIMIT, TYP.
BUILDING # Q5
EDGE OF GRAVEL, TYP.
APPROXIMATE 12" CMP CROSSING
STA: 19+70.22
ASSUMED INV ELEVATION = 18.62
8' MAIN TRENCH
DISTURBANCE LIMITS
2' SERVICE TRENCH
DISTURBANCE LIMITS, TYP. EXISTING UNDERGROUND
TELEPHONE UTILITY, TYP.
EXISTING UNDERGROUND
ELECTRICAL UTILITY, TYP.
C C2.2
6" HDPE DR 11 WATER MAIN
6" 45° HDPE PIPE FITTING
STA: 19+16.54
C C2.3
A C2.4
B C2.4
B C2.4
25' CONSTRUCTION
LIMITS
B C2.2
TLIN
G
IT TR
AIL
B C2.2
FIRE HYDRANT ASSEMBLY
A
C2.4
20'
10'
PROVIDE 2" OF INSULATION
OVER THE WATER PIPE
CROSSING UNDER THE CMP
(2' ON EITHER SIDE OF
CROSSING)
B C2.0
INSTALL NEW
WATER METER
INSTALL NEW
WATER METER
dj a-pw dr iv e\ D
JA
\7
3.
\S ur ve y\
_P ho to s
Vi de os
\G oo gl e
Sa te llit e
Im ag e\
.1
G oo gl e Sa te llit e im ag e
-3
1-
.ti ff
EFM
EFM
EF
M
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
U G
T
U G
T
UGT
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
U G
T
U G
T
U G
T U
G T
U G
T
U G
T
UGT
U G
T U
G T
U G
T
UG
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
W V
W V
T
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW EW EW EW
EW
EW
EW
EW
EW
EW
EW
EW
W 6''
W 6''
W 6''
W 6'' W 6''
W 6''
W 6''
W 6''
W
W
W
W
GV
GV
GV
GV
20+00
21+00
22+00 23+00
24+00
25+00
20+00
.7
.4
.7
.5
.9
.9
.3
.4
.7
.8
21+00
.9
.3
.3
.9
.6
.4
.9
.0
.3
.3
22+00
.8
.6
.0
.9
.2
.2
.6
.5
.6
.7
23+00
.8
.8
.6
.0
.5
.1
.1
.1
.9
.1
24+00
.7
.2
.7
.4
.0
.7
.8
.2
.4
.7
25+00
BL
O
W O
FF
ST
A
+0
7.
6" G
AT
E
VA
LV
E
ST
A
+9
9.
" C
M P
C R
O
SS
IN
G
ST
A
+5 5.
IN
V
EL
EV
5.
6" G
AT
E
VA
LV
E
ST
A
+8
5.
6" X
" T
EE
ST
A
+8
9.
EX
IS
TI
N
G S
EW
ER
F M
C R
O
SS
IN
G
ST
A
+5 1.
M
AX
T
O P
EL
EV
0.
H Y D
H Y D
ARV
WM
WM
WM
WM
ARV
GV
GV
GV
GV
GV
GV
GV
GV
GV
GV GV
GV
GV
GV
GV
GV
GV
N
PLAN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:1
TY
LE
R
.F R
AN
C
IS
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S0
\0
3_
TL
IN
G
IT
T
R
AI
L.
D
W G
WATER DISTRIBUTION
PLAN AND PROFILE
STA 20+00 TO 25+00
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989AC1.4
SCALE IN FEET
0 20 40
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
KEY MAP
NTS
N
PROFILE
SEE SHEET C1.3
BLOWOFF
STA: 20+07.77
PROTECT VEGETATION IN
PLACE, TYP. ALL TREES
WITHIN CONSTRUCTION
DISTURBANCE LIMIT
C C2.2
C C2.4
8' TRENCH
DISTURBANCE LIMITS
25' CONSTRUCTION
DISTURBANCE LIMITS
B C2.2
EXISTING SEWER FORCE
MAIN UTILITY, TYP.
EXISTING UNDERGROUND
TELEPHONE UTILITY, TYP.
6" X 8" HDPE TEE
STA: 24+89.12
6" GATE VALVE
STA: 24+85.34
24" CMP CULVERT CROSSING
STA: 24+55.42
INV ELEVATION: 25.93
EXISTING SEWER FORCE
MAIN CROSSING
STA: 24+51.54
CONTRACTOR TO VERIFY 18"
MIN VERTICAL SEPARATION
TLINGIT TRAIL
6" GATE VALVE
STA: 20+99.80
A C2.3
A C2.3
C C2.3
4' MIN. BURY
6" HDPE DR 11 WATER MAIN
FINISH GRADE
B C2.3
EDGE OF ASPHALT, TYP.
20'
10'
PA
RK
R
OAD
SEE SHEET C1.7
EXISTING 6" WATER MAIN AND
GATE VALVES TO BE ABANDONED
PROVIDE 2" OF
INSULATION OVER THE
WATER PIPE CROSSING
UNDER THE CMP
(2' ON EITHER SIDE OF
THE CROSSING)
SEE SHEET C1.6
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
WV
E
ARV
GV
W 8''
W 8''
W 8'' W 8'' W 8'' W 8'' W 8''
W 8''
W 8''
W 8''
100+00
101+00
102+00 103+00 104+00
105+00
106+00
100+00
.1
.0
.7
.0
.8
.9
.9
.4
.9
101+00
.4
.0
.4
.2
.8
.9
.1
.1
.9
.1
102+00
.7
.0
.3
.9
.7
.8
.0
.7
.7
.6
103+00
.5
.5
.4
.4
.1
.3
.5
.2
.0
.1
104+00
.2
.0
.8
.3
.4
.6
.7
.9
.6
.2
105+00
.9
.2
AI
R
/V
AC
R
EL
EA
SE
V
AL
VE
ST
A
1+
.7
8" X
" H
D
PE
R
ED
U C
ER
ST
A
0+
.6
6" G
AT
E
VA
LV
E
ST
A
0+
.0
8" H
D
PE
5°
B
EN
D
ST
A
0+
.0
8" H
D
PE
5°
B
EN
D
ST
A
0+
.4
8" H
D
PE
2.
5° B
EN
D
ST
A
0+
.4
H Y D
HY D
ARV
WM
WM
WM
WM
ARV
GV
GV GV
GV
GV
GV
GV
GV
GV
GV GV
GV
GV
GV
GV
GV
GV
PLAN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:1
TY
LE
R
.F R
AN
C
IS
R
C
:\U
SE
R S\
AA
R
O N
\D J&
A, P
C \D
J& A
C
AD
U
SE
R G
R O
U P
- G
EN
ER
AL
\IN
TI
AT
IV
E# 6_
O
TH
ER
AG
EN
C
IE
S_
M
ER
G E_
W
IT
H _D
JA
_S
TA
N
D
AR
D S\
1.
1_
O
TH
ER
AG
EN
C
IE
S_
IN
IT
AT
IV
E_
TO
-D O
_I
TE
M S\
N
PS
_M
AJ
O R
_C
AD
_U
PD
AT
ES
_2
3_
AA
R O
N \1
_N
PS
_T
EM
PL
AT
ES
-M
ER
G
ER
\2
_D
JA
_N
PS
_C
TB
_A
LL
_2
8_
TO
_P U
LL
WATER DISTRIBUTION
PLAN AND PROFILE
STA 100+00 TO 105+00
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989AC1.5
SCALE IN FEET
0 20 40
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
KEY MAP
NTS
N
8" HDPE DR 11 WATER MAIN
CONNECT TO EXISTING 6"
STUB. CONTRACTOR TO
VERIFY DEPTH, MATERIAL,
AND LOCATION.
EDGE OF ASPHALT, TYP.
UNDERGROUND TELEPHONE UTILITY, TYP.
PARK ROAD
SEE SH
EET C
1.6
AIR/VAC RELEASE VALVE
STA: 101+67.79
D C2.4
8' TRENCH DISTURBANCE LIMITS
25' CONSTRUCTION DISTURBANCE LIMITS
4' MIN. BURY FINISH GRADE
20'
10'
EXISTING 6" PVC
WATER MAIN
B C2.2
6" GATE VALVE
STA: 100+10.00
8" X 6" HDPE REDUCER
STA: 100+11.63
CONNECT TO
EXISTING 6" STUB
PROFILE
C C2.0
A C2.3
8" HDPE 45° BEND
STA: 100+14.00
8" HDPE 45° BEND
STA: 100+61.41
8" HDPE 22.5° BEND
STA: 100+84.46
PROTECT VEGETATION IN
PLACE, TYP. ALL TREES
WITHIN CONSTRUCTION
DISTURBANCE LIMIT
C
C2.2 RESTORE EXISTING DRAINAGE
SWALE TO EXISTING CONDITIONS
WHEN BACKFILLING
..\..\..\dja-pwdrive\DJA\7333.12\Survey\05_Photos & Videos\Google Satellite Image\7333.12 Google Satellite image 01-31-2024.tiff
ETE
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
WV
W 8''
8''
W 8''
GV
GV GV
W 8''
W 8''
W 8''
W 8''
W 8''
W 8'
W 8''
W 8''
W 8''
105+00
106+00
107+00
108+00
109+00
9+
55 50
105+00
.9
.2
.0
.2
.0
.3
.1
.3
.0
.3
106+00
.8
.1
.5
.8
.3
.5
.0
.2
.5
.2
107+00
.1
.1
.3
.7
.6
.1
.0
.5
.1
.0
108+00
.3
.1
.4
.2
.4
.4
.4
.1
.9
.6
109+00
.1
.0
.4
.3
.6
.6
.2
109+70
BL
O
W O
FF
V
AL
VE
ST
A
7+
.1
8"
0° H
D
PE
F
IT
TI
N
G
ST
A
7+
.1
8" G
AT
E
VA
LV
E
ST
A
9+
.7
8" X
" X
" H
D
PE
T
EE
ST
A
9+
.5
8" X
" H
D
PE
R
ED
U C
ER
ST
A
9+
.0
6" G
AT
E
VA
LV
E
TI
E
IN
TO
E
XI
ST
IN
G
" M
AI
N
ST
A
9+
.2
H Y D
H Y D
ARV
WM
WM
WM
WM
ARV
GV
GV
GV
GV
GV
GV
GV
GV
GV
GV GV
GV
GV
GV
GV
GV
GV
N
PLAN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:1
TY
LE
R
.F R
AN
C
IS
R
C
:\U
SE
R S\
AA
R
O N
\D J&
A, P
C \D
J& A
C
AD
U
SE
R G
R O
U P
- G
EN
ER
AL
\IN
TI
AT
IV
E# 6_
O
TH
ER
AG
EN
C
IE
S_
M
ER
G E_
W
IT
H _D
JA
_S
TA
N
D
AR
D S\
1.
1_
O
TH
ER
AG
EN
C
IE
S_
IN
IT
AT
IV
E_
TO
-D O
_I
TE
M S\
N
PS
_M
AJ
O R
_C
AD
_U
PD
AT
ES
_2
3_
AA
R O
N \1
_N
PS
_T
EM
PL
AT
ES
-M
ER
G
ER
\2
_D
JA
_N
PS
_C
TB
_A
LL
_2
8_
TO
_P U
LL
WATER DISTRIBUTION
PLAN AND PROFILE
STA 105+00 TO 109+70
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989AC1.6
SCALE IN FEET
0 20 40
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
KEY MAP
NTS
N
EDGE OF ASPHALT, TYP.
UNDERGROUND TELEPHONE
UTILITY, TYP.
PARK ROAD
25' CONSTRUCTION DISTURBANCE LIMITS
SE
E
SH
EE
T C1
.5
EDGE OF GRAVEL, TYP.
EXISTING 18" Ø CMP,
PROTECT IN PLACE
PROTECT VEGETATION IN
PLACE, TYP. ALL TREES
WITHIN CONSTRUCTION
DISTURBANCE LIMIT
C C2.2
8" 90° HDPE FITTING
STA: 107+34.14
8" GATE VALVE
STA: 109+55.75
8" X 8" X 8" HDPE TEE
STA: 109+58.58
8" X 6" HDPE
REDUCER
STA: 109+60.08
6" GATE VALVE, CONNECT TO
EXISTING 6" DUCTILE IRON MAIN.
CONTRACTOR TO VERIFY DEPTH
AND LOCATION OF EXISTING
STA: 109+61.23
EXISTING 6" PVC MAIN
A C2.3
C C2.3A
C2.3
C C2.3
8" HDPE DR 11 WATER MAIN
4' MIN. BURY
FINISH GRADE
BLOWOFF VALVE
STA: 107+36.17
C C2.4
8' TRENCH DISTURBANCE LIMITS
SEE SHEET C1.7
B C2.2
PROFILE
D C2.0
TIE IN TO EXISTING 6"
DUCTILE IRON MAIN.
CONTRACTOR TO VERIFY
DEPTH, SIZE, AND MATERIAL
OF EXISTING PIPE20'
10'
RESTORE EXISTING DRAINAGE
SWALE TO EXISTING CONDITIONS
WHEN BACKFILLING
\dja-pwdrive\DJA\7333.12\Survey\05_Photos & Videos\Google Satellite Image\7333.12 Google Satellite image 01-31-2024.tiff
U G
T
U G
T
U G
T
UGT
UGT
UG
T
UG
T
UG
T
UG
T
UG
T
UGT
UGT
UG
T
UG
EFM EFM
EFM
EFM
EFM
EFM
EFM
UG
T
UGT UGT UGT UGT
UGT UGT UGT UGT UGT
UGT
UGT
UGT
UG
T
UG
T
U G
T
UGT UGT UGT
UGT
UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UG
T
U G
T
U G
T U
G T
UGT
UGT
UGT
UGT
UGT
U G
T U
G T
UGT
UGT
UGT
UGT
UGT
U G
T
U G
T
UGT
UGT
UGT
UGT
UGT UGT
UGT
UG
T
U G
T
UG
T
U G
T U
G T
UGT
UGT
U G
T
UG
T
U G
T U
G T
U G
T U
G T
U G
T
UGT
UGT
UG
T
UG
T
U G
T U
G T
U G
T
UGT
UGT UG
T
UG
T
UGT
UGT
UGT
UGT
UGT
U G
T
UGT
UGT
UGT
UGT
UGT
U G
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
U G
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
U G
T
UG
T
UG
T
UG
T
UG
T
UG
T
WV
WV
WV
WV
DYH
WV
WVWV
E
E
T
T
T
EW
EW
EW
EW
EW EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
6''
W 6''
W 8'' W 8''
W 8''
W 8'' W 8'' W 8''
W 8''
W 8'' W
10'' W
10''
GV GV
GV
GV
GV
G V
G V
G V
GV
W
W
200+00
201+00
202+00 203+00
204+00
205+00
200+00
.7
.1
.1
.9
.8
.6
.4
.4
.9
201+00
.0
.1
.6
.3
.9
.5
.1
.0
.0
.5
202+00
.5
.9
.4
.5
.7
.7
.1
.3
.2
.8
203+00
.7
.2
.1
.7
.7
.5
.6
.3
.6
.3
204+00
.7
.2
.2
.0
.8
.9
.6
.8
.6
.5
205+00
.2
.5
8" X
" X
H D
PE
T
EE
ST
A
0+
.0
(S
TA
: 1
+5
8.
SH
EE
T
C 1.
6) 8"
G
AT
E
VA
LV
E
ST
A
0+
.5
U N
D
ER
G R
O U
N D
T
EL
EP
H
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
2+
.1
AS
SU
M
ED
E
LE
V
.5
U N
D
ER
G R
O U
N D
T
EL
EP
H
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
2+
.2
AS
SU
M
ED
E
LE
V
.4
8" G
AT
E
VA
LV
E
ST
A
2+
.6
8" X
" X
" H
D
PE
T
EE
ST
A
2+
.3
8" G
AT
E
VA
LV
E
ST
A
3+
.1
" C
M P
C R
O
SS
IN
G
ST
A
3+
.8
IN
V
EL
EV
9.
8" G
AT
E
VA
LV
E
ST
A
4+
.6
8" X
" X
" H
D
PE
T
EE
ST
A
4+
.6
" X
" H
D
PE
R
ED
U C
ER
ST
A
4+
.2
" G
AT
E
VA
LV
E
ST
A
4+
.3
4C O
N N
EC
T
EX
IS
TI
N
G W
AT
ER
SE
R
VI
C
E
TO
R
ES
ID
EN
C E, C O
N
TR
AC
TO
R T
O V
ER
IF
Y
SI
ZE
, D
EP
TH
, L O
C
AT
IO
N
AN
D M
AT
ER
IA
L
ST
A
1+
.6
H Y D
HY D
ARV
WM
WM
WM
WM
ARV
GV
GV GV
GV
GV
GV
GV
GV
GV
GV GV
GV
GV
GV
GV
GV
GV
PLAN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:0
TY
LE
R
.F R
AN
C
IS
R
C
:\U
SE
R S\
AA
R
O N
\D J&
A, P
C \D
J& A
C
AD
U
SE
R G
R O
U P
- G
EN
ER
AL
\IN
TI
AT
IV
E# 6_
O
TH
ER
AG
EN
C
IE
S_
M
ER
G E_
W
IT
H _D
JA
_S
TA
N
D
AR
D S\
1.
1_
O
TH
ER
AG
EN
C
IE
S_
IN
IT
AT
IV
E_
TO
-D O
_I
TE
M S\
N
PS
_M
AJ
O R
_C
AD
_U
PD
AT
ES
_2
3_
AA
R O
N \1
_N
PS
_T
EM
PL
AT
ES
-M
ER
G
ER
\2
_D
JA
_N
PS
_C
TB
_A
LL
_2
8_
TO
_P U
LL
WATER DISTRIBUTION
PLAN AND PROFILE
STA 200+00 TO 205+00
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989AC1.7
SCALE IN FEET
0 20 40
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
KEY MAP
NTS
N
20'
10'
EDGE OF ASPHALT, TYP.
UNDERGROUND
TELEPHONE UTILITY, TYP.
8' TRENCH DISTURBANCE LIMITS
25' CONSTRUCTION DISTURBANCE LIMITS
EXISTING 6" PVC WATER MAIN
36" CMP CROSSING
STA: 203+84.80
ELEV: 19.94
8" X 8" X 8" HDPE TEE
STA: 200+10.00
(STA: 109+58.58, SHEET C1.6)
8" GATE VALVE
STA: 200+11.50
EXISTING SEWER FORCE
MAIN UTILITY, TYP.
PARK ROAD
PROTECT VEGETATION IN
PLACE, TYP. ALL TREES
WITHIN CONSTRUCTION
DISTURBANCE LIMIT
C C2.2
EDGE OF GRAVEL, TYP.
8" GATE VALVE
STA: 204+75.63
10" GATE VALVE
STA: 204+81.34
10" X 8" HDPE REDUCER
STA: 204+80.23
6" GATE VALVE AND 8" X 6" HDPE
REDUCER, CONNECT TO EXISTING 6"
DUCTILE IRON MAIN. CONTRACTOR
TO VERIFY DEPTH, MATERIAL, SIZE,
AND LOCATION OF EXISTING
8" HDPE DR 11 WATER MAIN
10" HDPE DR 11
WATER MAIN
UNDERGROUND TELEPHONE
UTILITY CROSSING
STA: 202+46.17
ASSUMED ELEV: 30.5
UNDERGROUND TELEPHONE
UTILITY CROSSING
STA: 202+48.24
ASSUMED ELEV: 30.46
8" X 8" X 6" HDPE TEE
STA: 202+98.33
8" GATE VALVE
STA: 202+94.69
8" GATE VALVE
STA: 203+01.13
8" X 8" X 8" HDPE TEE
STA: 204+78.69
4' MIN. BURY
FINISH GRADE
SEE SHEET C1.6
B C2.2
C C2.3
SEE SHEET C1.4
C C2.3
A C2.3
A C2.3
A C2.3
A C2.3
A C2.3
C C2.3
SEE SHEET C1.8
PROFILE
E C2.0
PROVIDE 4" OF INSULATION BETWEEN
WATER MAIN & CMP CROSSING
(2' ON EITHER SIDE OF CROSSING)
A C2.3
EXISTING 6" DUCTILE IRON MAIN
CONNECT EXISTING WATER SERVICE TO
RESIDENCE, CONTRACTOR TO VERIFY
SIZE, DEPTH, LOCATION, AND MATERIAL
STA: 201+09.62
EXISTING RESIDENCE
EXISTING OPEN
SIDED STRUCTURE
ASPHALT PATCHINGD
C2.3
ARCTIC PIPE UNDER PAVED
ROADWAYS FROM
STA:204+80.13 TO 205+00.00
UGT
UGT
UGT
UGT
UGT
UGT
2-1/2" FM
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
W V
W V
W V
W V
W V
W V
W V
E
E
EW EW EW EW EW EW EW EW EW EW EW
EW
EW
EW
EW
EW
EW EW EW EW EW EW EW EW EW EW
EW
EW
EW
EW
EW
EW
EW EW EW EW EW EW
W 8'
W 10''
W 10''
W 10'' W 10'' W 10'' W 10'' W 10'' W 10'' W 10''
W 10'' W 10''
G V
204+00
205+00
206+00
207+00 208+00 209+00 210+00 211+00
908580
60555045
205+00
.2
.5
.3
.4
.3
.3
.7
.7
.8
.0
206+00
.9
.0
.5
.0
.5
.9
.7
.7
.7
.3
207+00
.6
.1
.5
.1
.3
.3
.2
.6
.7
.6
208+00
.3
.6
.2
.1
.4
.3
.0
.2
.2
.9
209+00
.2
.3
.2
.4
1.
.0
4.
.4
6.
1.
210+00
6.
2.
BL
O
W O
FF
V
AL
VE
ST
A
5+
.7
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
5+
.4
AS
SU
M
ED
E
LE
V
.3
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
5+
.6
AS
SU
M
ED
E
LE
V
.3
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
5+
.5
AS
SU
M
ED
E
LE
V
.3
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
5+
.6
AS
SU
M
ED
E
LE
V
.3
EX
IS
TI
N
G S
EW
ER
FM
C
R O
SS
IN
G
ST
A
5+
.0
M
AX
T
O P
EL
EV
7.
" C
M P
C R
O
SS
IN
G
ST
A
5+
.6
IN
V
EL
EV
0.
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
6+
.0
AS
SU
M
ED
E
LE
V
.1
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
6+
.8
AS
SU
M
ED
E
LE
V
.5
" 4
5° H
D
PE
F
IT
TI
N
G
ST
A
6+
.4
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
6+
.2
AS
SU
M
ED
E
LE
V
.4
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
6+
.9
AS
SU
M
ED
E
LE
V
.5
2" H
D
PE
W
AT
ER
SE
R
VI
C E
C O
N N
EC
TI
O N
ST
A
7+
.2
2" H
D
PE
W
AT
ER
SE
R
VI
C E
C O
N N
EC
TI
O N
ST
A
7+
.0
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
9+
.7
AS
SU
M
ED
E
LE
V
.0
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
9+
.8
AS
SU
M
ED
E
LE
V
.6
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
9+
.5
AS
SU
M
ED
E
LE
V
0.
H Y D
H Y D
ARV
WM
WM
WM
WM
ARV
GV
GV
GV
GV
GV
GV
GV
GV
GV
GV GV
GV
GV
GV
GV
GV
GV
N
PLAN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:0
TY
LE
R
.F R
AN
C
IS
R
C
:\U
SE
R S\
AA
R
O N
\D J&
A, P
C \D
J& A
C
AD
U
SE
R G
R O
U P
- G
EN
ER
AL
\IN
TI
AT
IV
E# 6_
O
TH
ER
AG
EN
C
IE
S_
M
ER
G E_
W
IT
H _D
JA
_S
TA
N
D
AR
D S\
1.
1_
O
TH
ER
AG
EN
C
IE
S_
IN
IT
AT
IV
E_
TO
-D O
_I
TE
M S\
N
PS
_M
AJ
O R
_C
AD
_U
PD
AT
ES
_2
3_
AA
R O
N \1
_N
PS
_T
EM
PL
AT
ES
-M
ER
G
ER
\2
_D
JA
_N
PS
_C
TB
_A
LL
_2
8_
TO
_P U
LL
WATER DISTRIBUTION
PLAN AND PROFILE
STA 205+00 TO 210+00
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989AC1.8
SCALE IN FEET
0 20 40
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
KEY MAP
NTS
N
20'
10'
2" HDPE WATER SERVICE
CONNECTION TO WATER
TREATMENT BUILDING
STA: 207+17.29
UNDERGROUND TELEPHONE UTILITY, TYP.
C
C2.3 8' TRENCH DISTURBANCE LIMITS
25' CONSTRUCTION DISTURBANCE LIMITS
B C2.2
EDGE OF GRAVEL, TYP.
10" 45° HDPE FITTING
STA: 206+28.48
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 205+10.48
ASSUMED ELEV: 33.31 EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 205+14.64
ASSUMED ELEVATION: 31.33EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 205+15.68
ASSUMED ELEV: 31.34
EXISTING SEWER FM CROSSING
STA: 205+27.07
REQUIRED 18" MIN VERT. SEPARATION
TO BE VERIFIED BY CONTRACTOR
SEE SHEET C1.7
18" CMP CROSSING
STA: 205+50.63
INV ELEVATION: 30.31
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 206+15.02
ASSUMED ELEV: 34.16
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 206+20.89
ASSUMED ELEV: 34.59
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 206+30.29
ASSUMED ELEV: 35.43
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 206+31.93
ASSUMED ELEV: 35.55
2" HDPE WATER
SERVICE CONNECTION TO
WATER TREATMENT PLANT
STA: 207+69.05
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 209+36.75
ASSUMED ELEV: 99.08
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 209+39.83
ASSUMED ELEV: 99.63
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 209+43.55
ASSUMED ELEV: 100.21
SEE SH
EET C
1.9
EXISTING SEWER FORCE MAIN, TYP.
B C2.4
B C2.4
BLOWOFF VALVE
STA: 205+57.73
PROTECT VEGETATION IN
PLACE, TYP. ALL TREES
WITHIN CONSTRUCTION
DISTURBANCE LIMIT
C C2.2
4' MIN. BURY
FINISH GRADE
C C2.4
10" HDPE DR 11 WATER MAIN
PROFILE
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 205+11.51
ASSUMED ELEV: 33.31
ASPHALT PATCHINGD
C2.3
ARCTIC PIPE UNDER PAVED
ROADWAYS FROM
STA:205+00.00 TO 205+37.01
UGT U
G
T
U G
T
U G
T
UG
T
UG
T
UGT U
G
T
U G
T
U G
T
UG
T
UG
T
UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
WV
WV
WV
WV
T
T T
E
E
EM
E
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW EW EW EW EW EW EW EW EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW EW EW EW EW EW EW EW EW
EW
EW
EW
EW
EW
EW
W 10''
W 10''
W 10'' W 10'' W 10'' W 10''
W 10''
W 10''
W 10''
GV
G V
210+00
211+00
212+00 213+00
214+00
215+00
215+27125
120115
210+00
6.
2.
7.
2.
8.
3.
9.
4.
9.
4.
211+00
0.
4.
1.
4.
9.
5.
0.
5.
0.
6.
212+00
1.
6.
3.
7.
4.
9.
7.
2.
4.
6.
213+00
7.
8.
7.
1.
8.
2.
9.
4.
1.
6.
214+00
2.
8.
4.
0.
6.
2.
0.
5.
4.
0.
215+00
8.
4.
1.
7.
215+27.15
2.
" G
AT
E
VA
LV
E
ST
A
4+
.4
" 4
5° H
D
PE
F
IT
TI
N
G
ST
A
5+
.2
" X
0"
X
0" H
D
PE
T
EE
ST
A
5+
.1
" X
0"
X
" H D
PE
T
EE
ST
A
3+
.2
" X
0"
X
" H D
PE
T
EE
ST
A
4+
.5
" C
M P
C R
O
SS
IN
G
ST
A
3+
.0
IN
V.
E
LE
V
3.
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
2+
.2
AS
SU
M
ED
E
LE
V
4.
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
TE
LE
PH
O N
E U
TI
LI
TY
C
R O
SS
IN
G
ST
A
2+
.2
AS
SU
M
ED
E
LE
V
4.
" X
0"
X
" T
EE
C O
N N
EC
T
TO
E
XI
ST
IN
G
ST
A
3+
.3
H Y D
H Y D
ARV
WM
WM
WM
WM
ARV
GV
GV
GV
GV
GV
GV
GV
GV
GV
GV GV
GV
GV
GV
GV
GV
GV
N
PLAN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:0
TY
LE
R
.F R
AN
C
IS
R
C
:\U
SE
R S\
AA
R
O N
\D J&
A, P
C \D
J& A
C
AD
U
SE
R G
R O
U P
- G
EN
ER
AL
\IN
TI
AT
IV
E# 6_
O
TH
ER
AG
EN
C
IE
S_
M
ER
G E_
W
IT
H _D
JA
_S
TA
N
D
AR
D S\
1.
1_
O
TH
ER
AG
EN
C
IE
S_
IN
IT
AT
IV
E_
TO
-D O
_I
TE
M S\
N
PS
_M
AJ
O R
_C
AD
_U
PD
AT
ES
_2
3_
AA
R O
N \1
_N
PS
_T
EM
PL
AT
ES
-M
ER
G
ER
\2
_D
JA
_N
PS
_C
TB
_A
LL
_2
8_
TO
_P U
LL
WATER DISTRIBUTION
PLAN AND PROFILE
STA 210+00 TO 215+27
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989AC1.9
SCALE IN FEET
0 20 40
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
KEY MAP
NTS
N
20'
10'
SE
E
SH
EE
T C1
.8
24" CMP CROSSING
STA: 213+27.02
10" HDPE 45° BEND
STA: 215+06.27
10" X 10" X 10" HDPE TEE
STA: 215+22.15
EXISTING 8' CHAIN
LINK FENCE, TYP.
TWO WATER
TANKS AT
100,000 GAL EACH
PROTECT VEGETATION IN
PLACE, TYP. ALL TREES
WITHIN CONSTRUCTION
DISTURBANCE LIMIT (TYP.)
C
C2.2 EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 212+95.22
ASSUMED ELEVATION 124.82
EXISTING UNDERGROUND
TELEPHONE UTILITY CROSSING
STA: 212+96.26
ASSUMED ELEVATION = 124.82
8' TRENCH DISTURBANCE LIMITS
25' CONSTRUCTION DISTURBANCE LIMITS B
C2.2
FIRE PUMP
BLDG.
10" GATE VALVE
STA: 214+01.47
C C2.3
A C2.3
10" HDPE DR 11 WATER MAIN
EDGE OF ASPHALT, TYP.
PARK RO
AD
EDGE OF GRAVEL, TYP.
EXISTING 6" DI WATER
TRANSMISSION MAIN FROM
WATER TREATMENT PLANT
(PROTECT IN PLACE)
EXISTING UNDERGROUND
TELEPHONE UTILITY, TYP.
4' MIN. BURY
FINISH GRADE
EXISTING 6" DI WATER
DISTRIBUTION MAIN
10" X 10" X 6" HDPE TEE
CONNECT TO EXISTING
6" DI SERVICE
STA: 213+97.28
10" X 10" X 6" HDPE TEE
CONNECT TO EXISTING
6" DI SERVICE
STA: 214+05.51
C C2.3
C C2.3
C C2.3
PROFILE
PROVIDE 4" OF INSULATION
OVER THE WATER PIPE
CROSSING UNDER THE CMP
(2' ON EITHER SIDE OF
CROSSING)
A C2.1
EXISTING
12" DI LINE
EXISTING 8" DUCTILE
IRON WATER MAIN
TIE IN TO EXISTING
WATER LINES OUTSIDE
OF VALVE BUILDING
F C2.0
A C2.1
10" X 10" X 8" HDPE TEE
CONNECT TO EXISTING
STA: 213+20.31
C C2.3
ASPHALT PATCHING D
C2.3
ARCTIC PIPE UNDER PAVED
ROADWAYS FROM
STA:212+84.09 TO 213+86.34
B C2.1
UGP
UGP
UGP
UGP
UGP
EW
EW
EW
EW
EW
EW EW EW EW EW
EW
EW
W
EW
EW
EW
W 8''
W 8''
U G
T
UGT UGT
EW
EW
EW
EW
EW
EW
EW
EW
W 8''
W 8''
W 10''
W 10''
EW
EW
EW
EW
EW
EW
EW
EW
EW
FS
FS
FS
FS
FSW 6''
W 6''
W 6''
W 6''
WV
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
W 10''
W 10''
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:4
TY
LE
R
.F R
AN
C
IS
R
C
:\U
SE
R S\
AA
R
O N
\D J&
A, P
C \D
J& A
C
AD
U
SE
R G
R O
U P
- G
EN
ER
AL
\IN
TI
AT
IV
E# 6_
O
TH
ER
AG
EN
C
IE
S_
M
ER
G E_
W
IT
H _D
JA
_S
TA
N
D
AR
D S\
1.
1_
O
TH
ER
AG
EN
C
IE
S_
IN
IT
AT
IV
E_
TO
-D O
_I
TE
M S\
N
PS
_M
AJ
O R
_C
AD
_U
PD
AT
ES
_2
3_
AA
R O
N \1
_N
PS
_T
EM
PL
AT
ES
-M
ER
G
ER
\2
_D
JA
_N
PS
_C
TB
_A
LL
_2
8_
TO
_P U
LL
WATER SYSTEM
CONNECTION DETAILS 1
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
EXISTING 6" PVC PIPE
STUB, CONTRACTOR TO
VERIFY SIZE, MATERIAL,
LOCATION, AND DEPTH.
C2.0
A C2.0
TLINGIT TRAIL CONNECTION AT STA: 10+09.95
SCALE IN FEET
0 2 4
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
C C2.0
PARK ROAD CONNECTION AT STA: 100+00
SCALE IN FEET
0 2 4
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
D C2.0
PARK ROAD CONNECTION AT STA: 109+58.58
SCALE IN FEET
0 2 4
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
E C2.0
PARK ROAD TO TANK CONNECTION AT STA: 204+78.69
SCALE IN FEET
0 2 4
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
CONNECT PROPOSED
6" HDPE PIPE TO
EXISTING 6" PVC PIPE
WITH MECHANICALLY
RESTRAINED JOINT
PROPOSED FUSIBLE HDPE
6" X 8" CONCENTRIC REDUCER
PROPOSED 8" DR 11 HDPE
PIPE, SEE SHEET C1.5
EXISTING 6" PVC
PIPE, CONNECT
AT PROPOSED
GATE VALVE
EXISTING 6"
DUCTILE IRON
PIPE, CONNECT
AT PROPOSED
GATE VALVE
PROPOSED 6"
GATE VALVE
PROPOSED 6" X 6" X 6" TEE
PROPOSED 6"
HDPE DR 11
WATER MAIN
EXISTING 6" PVC PIPE, CONNECT
AT PROPOSED GATE VALVE,
CONTRACTOR TO VERIFY SIZE,
MATERIAL, LOCATION, AND DEPTH
PROPOSED 8"
GATE VALVE
PROPOSED 8" X 8" X 8"
HDPE TEE
PROPOSED 8"
HDPE DR 11
WATER MAIN
PROPOSED FUSIBLE HDPE 6" X 8"
CONCENTRIC REDUCER
PROPOSED 6"
GATE VALVE
PROPOSED 8"
HDPE DR 11
WATER MAIN
PROPOSED 8"
GATE VALVE
PROPOSED 6"
GATE VALVE
PROPOSED 8"
HDPE DR 11
WATER MAIN
PROPOSED 10"
HDPE DR 11
WATER MAIN
EXISTING 6" PVC PIPE,
CONNECT AT PROPOSED
GATE VALVE, CONTRACTOR
TO VERIFY SIZE, MATERIAL,
LOCATION, AND DEPTH
PROPOSED 8" X 8" X 8"
HDPE TEE
PROPOSED FUSIBLE HDPE 6" X 8"
CONCENTRIC REDUCER
PROPOSED FUSIBLE HDPE 8" X 10"
CONCENTRIC REDUCER
GV GV
G V
GV
G V
G V
GV
GV
G V
B C2.0
HOUSING AREA CONNECTION AT STA: 16+26.66
PROPOSED 4"
GATE VALVE
PROPOSED
6" X 6" X 4"
TEE
EXISTING WATER MAIN TO HOUSING AREA.
CONTRACTOR TO VERIFY SIZE, MATERIAL,
AND DEPTH. CONNECT AFTER THE 4" X 2"
REDUCER USING A 2" COUPLER
G V
PROPOSED 6"
HDPE DR 11
WATER MAIN
F C2.0
CONNECTION TO NPS MAINTENANCE BUILDING AT STA: 213+20.31
PROPOSED
10" X 10" X 8" TEE
SCALE IN FEET
0 2 4
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
SCALE IN FEET
0 2 4
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
EXISTING 8" DI PIPE
CONNECT TO EXISTING 8" DI
WATER MAIN WITH GATE
VALVE. CONTRACTOR TO
VERIFY DEPTH AND
LOCATION
PROPOSED 10" HDPE
DR 11 WATER MAIN
G V
PROPOSED
8" GATE VALVE
TRENCH
DISTURBANCE
LIMITS
TRENCH
DISTURBANCE
LIMITS
TRENCH
DISTURBANCE
LIMITS
TRENCH
DISTURBANCE
LIMITS
TRENCH
DISTURBANCE
LIMITS
TRENCH
DISTURBANCE
LIMITS
PROPOSED FUSIBLE HDPE 4" X 2"
CONCENTRIC REDUCER
GV
ASPHALT
PATCHING
ASPHALT PATCHING
SEE SHEET C1.2 SEE SHEET C1.3 SEE SHEET C1.5
SEE SHEET C1.6 SEE SHEET C1.7 SEE SHEET C1.9
EW EW EW EW
EW
EW EW EW EW
EW
EW
EW
EW
EW
EW
EW EW EW EW
10''
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
W 10''
W 10''
W 10''
W 10''
W 10''
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:4
TY
LE
R
.F R
AN
C
IS
R
C
:\U
SE
R S\
AA
R
O N
\D J&
A, P
C \D
J& A
C
AD
U
SE
R G
R O
U P
- G
EN
ER
AL
\IN
TI
AT
IV
E# 6_
O
TH
ER
AG
EN
C
IE
S_
M
ER
G E_
W
IT
H _D
JA
_S
TA
N
D
AR
D S\
1.
1_
O
TH
ER
AG
EN
C
IE
S_
IN
IT
AT
IV
E_
TO
-D O
_I
TE
M S\
N
PS
_M
AJ
O R
_C
AD
_U
PD
AT
ES
_2
3_
AA
R O
N \1
_N
PS
_T
EM
PL
AT
ES
-M
ER
G
ER
\2
_D
JA
_N
PS
_C
TB
_A
LL
_2
8_
TO
_P U
LL
WATER SYSTEM
CONNECTION DETAILS 2
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
C2.1
B C2.1
PARK ROAD TO TANK CONNECTION AT STA: 215+22.15
SCALE IN FEET
0 2 4
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
PROPOSED 10" TEE
EXISTING 12" DIP
EXISTING VALVE
BUILDING
PROPOSED 10"
HDPE DR 11
WATER MAIN
A C2.1
FIRE PUMP BUILDING CONNECTIONS AT STA: 213+97.28 AND 214+05.51
PROPOSED 10"
HDPE DR 11
WATER MAIN
PROPOSED
10" X 10" X 6"
TEE
PROPOSED
10" X 10" X 6"
TEE
EXISTING 6" DI WATER SERVICE LINE
TO FIRE PUMP BUILDING
SCALE IN FEET
0 2 4
CONTOUR INTERVAL = 1'
(PLOT SIZE = 22" x 34")
N
WV
WV
PROPOSED 10"
GATE VALVE
CONNECT TO EXISTING 6" DI
WATER MAIN. CONTRACTOR
TO VERIFY DEPTH AND
LOCATION
CONNECT TO EXISTING 6" DI
WATER MAIN. CONTRACTOR
TO VERIFY DEPTH AND
LOCATION
GV
EXISTING 6"
GATE VALVE
EXISTING 6"
GATE VALVE TRENCH
DISTURBANCE LIMITS
TRENCH
DISTURBANCE LIMITS
CHAIN LINK
FENCE
PROPOSED FUSIBLE
HDPE12" X 10"
CONCENTRIC REDUCER
PROPOSED FUSIBLE
HDPE12" X 10"
CONCENTRIC REDUCER
SEE SHEET C1.9 SEE SHEET C1.9
CONNECT TO EXISTING
12" DI PIPE WITH 12"
ROMAC ALPHA COUPLER
OR APPROVED EQUAL
CONNECT TO EXISTING
12" DI PIPE WITH 12"
ROMAC ALPHA COUPLER
OR APPROVED EQUAL
EXISTING WATER LINE FROM WATER
TREATMENT BUILDING TO TANKS
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
8/
/2
:4
TY
LE
R
.F R
AN
C
IS
R
C
:\U
SE
R S\
AA
R
O N
\D J&
A, P
C \D
J& A
C
AD
U
SE
R G
R O
U P
- G
EN
ER
AL
\IN
TI
AT
IV
E# 6_
O
TH
ER
AG
EN
C
IE
S_
M
ER
G E_
W
IT
H _D
JA
_S
TA
N
D
AR
D S\
1.
1_
O
TH
ER
AG
EN
C
IE
S_
IN
IT
AT
IV
E_
TO
-D O
_I
TE
M S\
N
PS
_M
AJ
O R
_C
AD
_U
PD
AT
ES
_2
3_
AA
R O
N \1
_N
PS
_T
EM
PL
AT
ES
-M
ER
G
ER
\2
_D
JA
_N
PS
_C
TB
_A
LL
_2
8_
TO
_P U
LL
WATER SYSTEM DETAILS 1
187563
EA, TF
EA, TF
BE
03/07/2025
GLACIER BAY
NATIONAL PARK AND PRESERVE
307989A
A C2.2
PIPE TRENCH DETAIL
NTS
BACKSLOPE AS SPECIFIED
TO CONFORM TO O.S.H.A.
REGULATIONS
INSTALL 3" WIDE WARNING
TAPE 18" MAX. DEPTH
VERTICAL TRENCH
WALLS WITH SHORING TO
CONFORM TO O.S.H.A.
REGULATIONS SUBGRADE OR
GROUND SURFACE
SLOPING, BENCHING AND/OR
SUPPORT SYSTEMS IN THIS
AREA TO CONFORM TO O.S.H.A
REGULATIONS
MINIMUM TRENCH WIDTH FOR 10" DIA. = 32"
MINIMUM TRENCH WIDTH FOR 8" DIA. = 30"
MINIMUM TRENCH WIDTH FOR 6" DIA = 28"
MAXIMUM TRENCH DISTURBANCE LIMIT = 96"
6"
TYPE 1 PIPE BEDDING
PLACED IN 6" MAX.
LAYERS AND COMPACTED
THOROUGHLY.
TYPE 2 PIPE BEDDING WHERE
REQUIRED FOR SOFT OR
UNSTABLE FOUNDATION.
SELECT TYPE 1 BEDDING MATERIAL
PLACED IN 6" LAYERS & COMPACTED
AS SPECIFIED IN SECTION (TBD)
"TRENCH EXCAVATION"
NON-ORGANIC NATIVE
BACKFILL MATERIAL
(COMPACT AS SPECIFIED)
WATER TRENCH DETAIL NOTES:
1. WHERE TRENCH PASSES THROUGH EXISTING PAVEMENT THE PAVEMENT SHALL BE CUT ALONG A NEAT VERTICAL LINE A MINIMUM OF 12" FROM THE EDGE OF THE TRENCH OPENING. WHERE NEAT LINE IS LESS THAN 3' FROM EDGE OF EXISTING PAVEMENT OR CURB AND GUTTER SECTION, REMOVE AND REPLACE ENTIRE PAVEMENT SECTION BETWEEN TRENCH AND EDGE OF PAVEMENT.
2. SEE SPECIFICATIONS FOR ANY MODIFICATIONS TO STANDARD TRENCH MATERIALS AND/OR OTHER TRENCH DESIGN FEATURES.
#14 COPPER TRACE WIRE ON
WATER SERVICES
WATER MAIN
6"
25' MAX ALLOWABLE CONSTRUCTION LIMITS FOR WATER MAINS
10' MAX ALLOWABLE CONSTRUCTION LIMITS FOR WATER SERVICES
EXCAVATOR
4-6' DEEP
TRENCH
TRENCH EXCAVATION
SPOIL PILE
PIPE FUSING
WORKING AREA8' MAX TRENCH DISTURBANCE LIMITS FOR
WATER MAINS AND FIRE HYDRANT LEADS
2' MAX TRENCH DISTURBANCE LIMIT FOR
WATER SERVICES
25' DISTURBANCE LIMIT
12.5' 12.5'
B C2.2
TRENCH DISTURBANCE LIMITS
NTS
TREE PROTECTION NOTES:
1. CONTRACTOR TO REMOVE TREES WITHIN DISTURBANCE LIMITS OF NEW WATER LINE THAT RUNS THROUGH VEGETATED AREAS AS NECESSARY FOR WATER LINE INSTALLMENT. ANY TREE REMOVAL OR TRIMMING TO BE
APPROVED BY CO BEFORE CONSTRUCTION.
2. PROTECT ALL TREES WITHIN 5' OF CENTERLINE OF NEW WATER MAIN (BESIDES TREES WITHIN DISTURBANCE LIMITS THAT WILL BE REMOVED). TREE PROTECTION LOCATION MAY BE ADJUSTED IN THE FIELD BY THE
CONTRACTING OFFICER'S REPRESENTATIVE.
3. OUTSIDE EDGE OF TEMPORARY BARRIER SHALL BE PLACED AT DRIP-LINE OF TREE. TREE GUARDS MAY BE
PLACED AROUND SINGLE TREES OR GROUPS OF TREES.
4. MOVABLE BARRIERS MAY BE SUBSTITUTED FOR IN-GROUND BARRIERS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT PERIMETER OF FENCING REMAINS AT THE DRIP-LINE OF THE TREE AND THAT
TREES ARE PROTECTED.
3'-0"
MIN.
VARIES, 6'-0" MIN.
4' -0
TEMPORARY BARRIER PER
PROJECT SPECIFICATION
EXISTING TREE TO BE
PROTECTED DURING
CONSTRUCTION
MOVABLE POSTS
EXISTING
GRADE
C C2.2
TYPICAL TREE PROTECTION DETAIL
NTS
C2.2
4' M
IN
BU
R Y
EXISTING WATER MAIN.
PROPOSED WATER MAIN TO BE
INSTALLED ON TOP OF EXISTING
WATER MAIN WHERE PROPOSED
ALIGNMENT…
This is the start of the file's text. The full file is on GovTribe.