B08_Attachment_2_-_05-26-2022_JELA_Phase_I_Drawings.pdf
PDF 12 MB Posted
- Attached to
- JELA 251674 - Shoreline Protection Project
- Solicitation number
- 140P2022R0069
About this file
This document provides details for a federal contract opportunity with the National Park Service. Solicitation number 140P2022R0069 seeks proposals for the JELA 251674 Shoreline Protection Project to provide products and services for protecting shorelines within the agency's jurisdiction. Offerors should submit proposals in response to the requirements set forth in the attached drawings file B08_Attachment_2_-_05-26-2022_JELA_Phase_I_Drawings.pdf by the upcoming response date. The National Park Service intends to award a contract for these shoreline protection services later in 2022. Details on technical specifications, pricing, and terms can be found in the solicitation documents.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CJ>
3t
"Cl
"Cl C C t-1N
I r-- 0>
I') r-r--
GENERAL NOTES:
1. PROJECT SITE IS NOT ACCESSIBLE BY LAND. CONTRACTOR SHALL BE RESPONSIBLE FOR
ACCESSING THE SITE FROM A NAVIGABLE WATER BODY. DREDGING FOR SITE ACCESS SHALL ONLY
OCCUR WITHIN THE LIMITS SHOWN FOR TEMPORARY FLOTATION CHANNELS.
2. EXISTING UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING UTILITY OPERATORS AND LOUISIANA ONE CALL (1-800-272-3020) AT LEAST FIVE WORKING DAYS PRIOR TO MOBILIZATION. ALL PIPELINES AND UNDERGROUND UTILITIES SHALL BE MARKED BY CONTRACTOR. CONTRACTOR SHALL MAINTAIN MARKERS DURING CONSTRUCTION. CONTRACTOR SHALL
NOT ANCHOR, SPUD, OR EXCAVATE WITHIN 50 FT OF ANY PIPELINE.
3. PROJECT IS WITHIN AND ADJACENT TO ENVIRONMENTALLY SENSITIVE AREAS. CONTRACTOR SHALL AVOID/MINIMIZE IMPACTS TO THESE AREAS DURING THE COURSE OF WORK. OWNER RESERVES THE
RIGHT TO SUSPEND WORK AT ANY TIME IF IMPACTS OCCUR UNTIL SATISFACTORY CORRECTIVE
MEASURES ARE IMPLEMENTED BY CONTRACTOR. REFER TO SPECIFICATION SECTION 01 35 43 - ENVIRONMENTAL PROCEDURES FOR ADDITIONAL REQUIREMENTS, INCLUDING CONDITIONS TO AVOID
IMPACTS TO MANATEES, STURGEON, AND EXISTING VEGETATION.
4. CONTRACTOR SHALL BE FAMILIAR WITH AND ANTICIPATE EXISTING SOFT SOIL CONDITIONS AT THE
WORK SITE. SOIL INVESTIGATION DATA WERE ACQUIRED BY THOMPSON ENGINEERING AND
PRESENTED IN A GEOTECHNICAL DATA REPORT (REFER TO APPENDIX F IN SPECIFICATIONS). IN
PREPARING BIDS, CONTRACTOR SHALL ANTICIPATE AVERAGE CONSTRUCTION SETTLEMENTS OF
APPROXIMATELY 1.5 FT. REFER TO GRR PLACEMENT REQUIREMENTS ON THESE DRAWINGS AND IN
THE SPECIFICATIONS.
5. AERIAL PHOTOGRAPHS SHOWN ON SHEETS 3 TO 10 ARE 2019 DIGITALGLOBE CNES DISTRIBUTION
AIRBUS DS MADE AVAILABLE THROUGH MICROSOFT CORPORATION AERIAL.
6. CONTRACTOR SHALL TAKE PRECAUTIONS, SECURE EQUIPMENT, AND PROTECT THE WORK AGAINST
ADVERSE WEATHER AND MARINE CONDITIONS AND/OR SURGE/WAKE FROM PASSING VESSELS.
7. WATER DEPTHS VARY AND MAY NOT ACCOMMODATE DRAFT OF FULLY-LOADED BARGES. PROVISIONS
SHALL BE MADE TO ACCESS SHALLOWER AREAS THROUGH USE OF LIGHT -LOADED BARGES OR
OTHER EQUIPMENT SUITED TO SHALLOWER WATER.
8. AT CONTRACTOR'S DISCRETION, TEMPORARY FLOTATION CHANNELS MAY BE DREDGED (VIA
MECHANICAL SIDECASTING) TO FACILITATE ACCESS BY DEEPER DRAFT BARGES. DREDGED MATERIAL
FROM TEMPORARY FLOTATION AND ACCESS CHANNELS SHALL BE STOCKPILED WITHIN THE
TEMPORARY AREAS SHOWN ON THESE DRAWINGS. STOCKPILES OF SIDECAST MATERIAL SHALL BE
MARKED WITH TEMPORARY WARNING SIGNS AS SHOWN. UPON COMPLETION OF THE WORK,
FLOTATION CHANNELS SHALL BE MECHANICALLY BACKFILLED AND TEMPORARY WARNING SIGNS
SHALL BE REMOVED. DREDGED MATERIAL SHALL BE GRADED TO APPROXIMATELY MATCH THE
ORIGINAL TERRAIN.
9. CONTRACTOR SHALL STAKE LOCATIONS OF ALL TEMPORARY WARNING SIGNS FOR APPROVAL BY THE
GOVERNMENT OR THE GOVERNMENT'S APPOINTED REPRESENTATIVE PRIOR TO INSTALLATION.
10. THE LIMITS OF ALL CONSTRUCTION SHALL BE MARKED/STAKED FOR CONCURRENCE BY THE
GOVERNMENT OR THE GOVERNMENT'S APPOINTED REPRESENTATIVE PRIOR TO COMMENCING
CONSTRUCTION. ADVANCE MARKING/STAKING MAY BE STAGED WITH ACTUAL PROGRESS OF WORK.
REFER TO SPECIFICATION SECTION 01 32 23 - CONSTRUCTION SURVEYING FOR ADDITIONAL
REQUIREMENTS. REFER TO SETTLEMENT PLATE NOTES ON SHEET 28.
11. BREAKWATER ALIGNMENT MAY BE ADJUSTED IN THE FIELD WITH WRITTEN APPROVAL OF THE GOVERNMENT OR THE GOVERNMENT'S APPOINTED REPRESENTATIVE TO ACCOUNT FOR CHANGES IN
BOTTOM ELEVATION CAUSED BY COASTAL EROSION AND MARSH RETREAT THAT HAVE OCCURRED
SINCE DATA COLLECTION. FIELD ADJUSTMENTS WILL NOT INCREASE BREAKWATER LENGTH WITHOUT ADJUSTING CONTRACT QUANTITIES THROUGH CHANGE ORDERS. CONTRACTOR SHALL OBTAIN WRITTEN
NOTICE FROM THE GOVERNMENT FOR ALL ALIGNMENT CHANGES.
12. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCING CONSTRUCTION
ACTIVITIES. DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE GOVERNMENT OR THE
GOVERNMENT'S APPOINTED REPRESENTATIVE.
13. THERE ARE NO STAGING AREAS AVAILABLE ON NPS PROPERTY. CONTRACTOR SHALL MAKE THEIR
OWN ARRANGEMENTS, OBTAIN PERMISSION FROM APPLICABLE PROPERTY OWNERS AND PAY ALL
ASSOCIATED FEES FOR STAGING, FABRICATION, AND LOADING BARGES.
14. CONTRACTOR SHALL AVOID CONSTRUCTION ACTIVITIES WITHIN THE DESIGNATED DO NOT DISTURB
AREAS.
15. THE CONTRACTOR WILL NEED TO COMPLY WITH LISTED PERMITS/APPROVALS.
16. FEDERAL AND STATE PERMITS THAT ARE REQUIRED TO PERFORM THE WORK HAVE BEEN SECURED BY THE GOVERNMENT OR THE GOVERNMENT'S APPOINTED REPRESENTATIVE . PERMIT CONDITIONS
AFFECTING THE CONSTRUCTION PROCESSES HAVE BEEN INCLUDED IN APPENDIX C OF THE
SPECIFICATIONS.
17. ANY DISCREPANCIES BETWEEN THESE PLANS AND THE CONSTRUCTION DOCUMENTS SHALL BE IMMEDIATELY REPORTED TO THE GOVERNMENT. ALL OTHER REGULATORY AUTHORIZATIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR. COPIES OF ANY SPECIAL PERMITS THAT ARE OBTAINED BY
THE CONTRACTOR MUST BE SUBMITTED TO THE GOVERNMENT.
SURVEY NOTES:
1. TOPOGRAPHIC SURVEYS WERE COMPLETED BY C.H. FENSTERMAKER & ASSOCIATES,
L.L.C. ON DECEMBER 7, 2018. BATHYMETRIC SURVEYS WERE COMPLETED BY C.H.
FENSTERMAKER & ASSOCIATES, L.L.C. ON JANUARY 7, 2019.
2. LOCATIONS OF MAGNETIC ANOMALIES SHOWN ON SHEET 3 WERE PROVIDED BY C.H.
FENSTERMAKER & ASSOCIATES, L.L.C. BASED ON FIELD WORK CONDUCTED DURING
JANUARY 2019. OTHER UNIDENTIFIED ANOMALIES AND OBSTRUCTIONS MAY EXIST.
CONTRACTOR SHALL COORDINATE AND PERFORM A PRE-CONSTRUCTION HAZARD
(MAGNETOMETER) SURVEY AND LOCATE ALL UTILITIES AND OBSTRUCTIONS PRIOR TO
COMMENCING WORK.
3. ALL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF
1988 (NAVD88) IN U.S. SURVEY FEET (FEET). ALL HORIZONTAL COORDINATES ARE
REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD83), LOUISIANA STATE
PLANE, SOUTH ZONE, IN FEET.
4. MONUMENTS USED FOR SURVEY CONTROL:
PRIMARY GPS CONTROL COORDINATE LISTING
POINT NORTHING EASTING ELEVATION
LMCN 275191.09 3495143.50 31.46
ENG6 504231.40 3721732.40 28.78
GRIS 281033.47 3719590.18 27.19
HOUM 397729.36 3474618.96 45.16
LWES 510595.83 3592587.48 33.34
15055 GIWW 454938.06 3660221.23 5.53
BA01 SM 05 479413.86 3648793.33 0.45
PROJECT REFERENCE CONTROL COORDINATE LISTING
POINT NORTHING EASTING ELEVATION
TBM-1 499730.22 3626609.39 2.14
5. SURVEY CONTROL EMPLOYED DURING CONSTRUCTION SHALL MATCH CONTROL
PUBLISHED IN THESE CONTRACT DOCUMENTS. NO OTHER SURVEY CONTROL SHALL
BE CONSIDERED. TO MAINTAIN CONSISTENCY BETWEEN PROJECT DESIGN AND
CONSTRUCTED WORK, UPDATES, CORRECTIONS OR OTHER CHANGES PUBLISHED BY
NGS AND/OR OTHER ENTITIES FOR THESE CONTROL MONUMENTS SHALL NOT BE
APPLIED.
6. EXCEPT AS NOTED OTHERWISE, SPOT ELEVATIONS AND SURVEY TRANSECTS ARE
BASED ON SURVEYS CONDUCTED BY FENSTERMAKER DURING JANUARY 2019.
7. USGS GAGE STATION 2951190901217 WAS USED TO GATHER HISTORICAL WATER
LEVEL RECORDS DUE TO THE PROJECT AREA AND DATABASE AVAILABILITY. IT IS
LOCATED IN LAKE CATAOUATCHE AT WHISKEY CANAL AT N29·51'19" AND W90.12'17".
TIDAL DATUMS AT LAKE CATAOUATCHE
(USGS 2951190901217)
DATUM ELEVATION. FT NAVD88
MHW 1.36
MWL 1.17
MLW 0.98
QUANTITY NOTES:
1 . WHERE THE QUANTITY OF WORK WITH RESPECT TO ANY ITEM IS COVERED BY
A UNIT PRICE, SUCH QUANTITIES ARE ESTIMATED QUANTITIES TO BE USED
WHEN COMPARING BIDS AND THE RIGHT IS RESERVED BY OWNER TO
INCREASE/DECREASE SUCH QUANTITIES AS MAY BE NECESSARY TO COMPLETE
THE WORK AND/OR REMAIN WITHIN THE FUNDING LIMITS. REFER TO
PARAGRAPH 1.41 IN SECTION 01 27 00 - DEFINITION OF CONTRACT LINE
ITEMS.
2. MOBILIZATION AND DEMOBILIZATION SHALL INCLUDE ALL APPROPRIATE COSTS
ASSOCIATED WITH CONSTRUCTING ALL FEATURES LISTED IN THE SPECIFICATIONS
AND/OR SHOWN IN THE PLANS.
QUANTITIES
BID ITEM NO. BID ITEM DESCRIPTION UNITS QUANTl1Y
1 MOBILIZATION & DEMOBILIZATION LS 1
2 SURVEYING LS 1
3 ARMOR STONE US TON 48 053
4 BEDDING STONE US TON 19 009
5 FILTER STONE US TON 21 919
6 ENCAPSULATED LIGHT-WEIGHT CU YD 5 996 AGGREGATE
7 SETTLEMENT PLATES EA 14
8 GEOGRID COMPOSITE SY 72 763
9 GEOTEXTILE SHROUD SY 57 840
10 EXCAVATION AND SPOIL VOLUME CU YD 72 122
TEMPORARY AIDS TO NAVIGATION
EA 23 11 (SIGNS/DAY BEACONS)
PERMANENT AIDS TO NAVIGATION
12 (SIGNS/DAY BEACONS) EA 46
PERMANENT AIDS TO NAVIGATION
EA 0 (BUOYS)
ABBREVIATIONS
ABBREVIATION DEFINITION
NHP NATIONAL HISTORIC PARK
PMIS PROJECT MANAGEMENT INFORMATION SYSTEM
LWAC LIGHT WEIGHT AGGREGATE CORE
LWA LIGHT WEIGHT AGGREGATE
NAVD NORTH AMERICAN VERTICAL DATUM
NAD'83 NORTH AMERICAN DATUM OF 1983
MLW MEAN LOW WATER
MWL MEAN WATER LEVEL
MHW MEAN HIGH WATER
NGS NATIONAL GEODETIC SURVEY
USGS UNITED STATES GEOLOGIC SURVEY
USCG UNITED STATES COAST GUARD
GRR GRADED RIP RAP
SAY SUBMERGED AQUATIC VEGETATION
NTS NOT TO SCALE
CCA CHROMATED COPPER ARSENATE
HDG HOT DIP GALVANIZATION
NPS NATIONAL PARK SERVICE
TBD TO BE DETERMINED
DESIGNED: SUB SHEET NO. TITLE OF SHEET DRAWING NO.
RLW GENERAL NOTES &
IM.·1•1•1 167808
ESTIMATED BID QUANTITIES SRH PMIS/PKG NO.
TECH. REVIEW: JELA 251674
Stantec
TAC SHEET
DATE:
2 OF 31 5/6/2022 JEAN LAFITTE N.H.P. & PRESERVE
LAKE SALVADOR
tcancienne Stamp
DANGER
OBSTRUCTION
DANGER
BREAKWATER
DANGER
BREAKWATER
OBSTRUCTION
DANGER
BREAKWATER
DANGER
BREAKWATER
BREAKWATER
DANGER
BREAKWATER
BREAKWATER
DANGER
OBSTRUCTION
| 19-28_Detail Sheets-26.pdf |
| Sheets and Views |
| 26 |
| PLOT |
| 19-28_Detail Sheets-26.pdf |
| Sheets and Views |
| 26 |
| PLOT |
| 01-02_TITLE and NOTES-02_General Notes.pdf |
| Sheets and Views |
| 02_General Notes |
| 19-28_Detail Sheets-21.pdf |
| Sheets and Views |
| 21 |
| PLOT |
File details come from the government source that posted it. Updated .