B08_Attachment_10_Permit_SWG-2023-00173_20230609_NPS_NWP.pdf
PDF 11 MB Posted
- Attached to
- BITH 244484, Bridge Abutment Repairs Federal contract opportunity
- Solicitation number
- 140P2024R0012
About this file
This document is an attachment related to a federal contract opportunity for bridge abutment repairs. The solicitation number is 140P2024R0012 and is being issued by the Department of the Interior National Park Service National Office to repair bridges under their purview. The opportunity type is a solicitation for bridge abutment repairs on multiple structures. The attachment is a permit from the National Park Service for non-federal projects conducted under the Nationwide Permit program. It authorizes certain bridge repairs and upgrades to help ensure safe transportation routes are maintained within the park system. The response due date for the solicitation is not provided in this attachment, though the award date will likely correspond with the fiscal year 2024 funding to be applied.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Amd_0002_BITH_Bridge_Repair_Project_Bidder_questions_0002.pdf | ||
| Sol_140P2024R0012_Amd_0002.pdf | ||
| Sol_140P2024R0012_Amd_0001.pdf | ||
| B08_Attachment_08_Bid_Bond_SF24-16e.pdf | ||
| B08_Attachment_04_PastPerf_REQD.docx | DOCX document | |
| B08_Attachment_07_General_References.doc | DOC document | |
| B08_Attachment_05_Project_Experience_Form.docx | DOCX document | |
| B08_Attachment_06_Subcontracting_Percentage_Worksheet.xlsx | XLSX spreadsheet | |
| Sol_140P2024R0012.pdf | ||
| B08_Attachment_03_WD_TX20230038.pdf | ||
| B08_ATTACHMENT_02_BigThicket_100__plans_stamped.pdf | ||
| B08_ATTACHMENT_01_BITH_100__SPECS.pdf | ||
| B08_Attachment_11_BITH_244484_Final_Geotech_Report.pdf | ||
| B08_Attachment_09_Construction_Contract_Administration.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT
2000 FORT POINT RD
GALVESTON, TEXAS 77550
9 June 2023
Evaluation Branch
SUBJECT: Permit No. SWG-2023-00173; Nationwide Permit Verification
National Park Service P.O. Box 25287 Denver, CO 80225 POC: Darin Thacker
Dear Mr. Thacker:
This is in reference to your request, dated March 16, 2023, submitted on your behalf by HDR Engineering, Inc., to discharge approximately 80.5 cubic yards of fill material into 0.024 acres of the waters of Village Creek, Turkey Creek, and unnamed wetlands associated with these waterbodies. The proposed fill is associated with the stabilization of Kirby Bridge and Turkey Creek Bridge. The Kirby Bridge work will consist of the discharge of 50 cubic yards of gabion mattress and topsoil fill material into 0.017 acres of forested wetlands. Additionally, the applicant proposes to discharge 16 cubic yards of gabion mattress fill into 0.005 acres below the ordinary high-water mark (OHWM) of Village Creek. The Turkey Creek bridge work will consist of the discharge of 14.5 cubic yards of gabion mattress and topsoil fill material into 0.002 acres of forested wetlands.
The project site is located in Village Creek, Turkey Creek, and unnamed wetlands associated with these waterbodies, at the Big Thicket National Preserve at 6044 FM 420 in Kountze, Hardin County, Texas.
This request is verified by Nationwide Permit (NWP) 42 pursuant to Section 404 of the Clean Water Act. This NWP verification is valid provided the activity is compliant with the enclosed plans, in 16 sheets. In addition, the activity must be in compliance with the NWP General/Regional Conditions, Section 401 Water Quality Certification, and the Coastal Management Program, which can be found at:
https://www.swg.usace.army.mil/Missions/Regulatory/Permits/Nationwide-General- Permits/, a hard copy can be provided to you upon request.
The NWP verification is valid until the NWP is modified, reissued, or revoked. The subject NWPs authorized in 2021 are scheduled to be modified, reissued, or revoked prior to March 15, 2026. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP.
https://www.swg.usace.army.mil/Missions/Regulatory/Permits/Nationwide-General-Permits/ https://www.swg.usace.army.mil/Missions/Regulatory/Permits/Nationwide-General-Permits/
-2-
This verification does not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted as such. If you have any question regarding this verification, please contact Micah Yohe at the letterhead address or by telephone at 409-766-3955. Please notify the Chief of the Compliance Branch in the Galveston District Regulatory Division in writing at the letterhead address, upon completion of the authorized project.
FOR THE DISTRICT COMMANDER:
Tasha L. Metz, Ph.D.
Leader, North Evaluation Unit cc w/Encl.
HDR Engineering, Inc., POC: Alexandra Austin, Alexandra.austin@hdrinc.com
Eighth Coast Guard District, New Orleans, LA
National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS), Coast & Geodetic Survey, Silver Spring, MD
Texas Commission on Environmental Quality
Texas General Land Office
TO
LIVINGSTON
. . . ----i-</&i;l -j_�;,:��::�::�!-:t;im: -.
I
,;f&ftfif:/;J;f; ="°",-,;;,====· i\
,.,.,.-7.·-
�:,�·�::::.l:::,�:���:,"!�:.�:
;t:
11:
t
::�,, "I "!ii ·�i1 f�ar=
'.}i rc
EVELAN
''°"'°""''>,.-,=-:.,.___, .:::::::;0i;:::-::;;;
R UNIT /
TO
LEGEND
-- - -- PARK BOUNDARY
-- - -- COUNTY LINE
----- PAVED ROAD
- - - - - - UNPAVED ROAD
--------- TRAIL
--···-- CREEK
!Z'ZV' /2Z1ZI STATE PARK
TURKEY CREEK
BRIDGE
VISITOR CENTER
INFORMATION CENTER
PARKING
PICNIC AREA
RANGER STATION
SHEET
SHEET INDEX
SUB- TITLE OF SHEET
SHEET
KIRBY
BRIDGE
S2 S3 S4 S5 S6 S7
SB
S9 S10 S11
COVER
KIRBY AND TURKEY TRAIL BRIDGES GENERAL NOTES AND ABBREVIATIONS
KIRBY AND TURKEY TRAIL BRIDGES LOCATION MAP
KIRBY BRIDGE ENGINEERING GEOLOGY
TURKEY CREEK BRIDGE ENGINEERING GEOLOGY
KIRBY BRIDGE GENERAL LAYOUT - S. ABUTMENT
KIRBY BRIDGE GENERAL LAYOUT - N. ABUTMENT
KIRBY BRIDGE MISCELLANEOUS DETAILS 1
KIRBY BRIDGE MISCELLANEOUS DETAILS 2
KIRBY & TURKEY CREEK BRIDGE GABION MATTRESS DETAIL
TURKEY CREEK BRIDGE GENERAL LAYOUT - E. ABUTMENT
LAKE CHARLES,
LOUISANA
SCALE OF MILES
a 2 4
BIG THICKET NATIONAL
BASIC DATA: UPDATED 10/9B. SGS.
PRESERVE
NOT FOR CONSTRUCTION
OCTOBER 2022
CONSTRUCTION DRAWINGS
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DEN\IER SERVICE CENTER
2 0 2 4 6 8
SCALE OF KILOMETERS
PIISN0. 2444114
TITLE OF DRAWING
LOCATION WITHIN PARK
OVERVIEW
NAME Of" PARK
BIG THICKET NATIONAL PRESERVE
� COUNTY .SIME.
INTERMOUNTAIN HARDIN TEXAS
DRAWING NO.
PKG. SHEET
::. [IJ
=OF...11..
SWG-2023-00173
National Park Service
Verified Project Plans Page 1 of 16 Received 25 April 2023
SWG-2023-00173
Page 2 of 16 Received 25 April 2023
Page 3 of 16 Received 25 April 2023
Page 4 of 16 Received 25 April 2023
Page 5 of 16 Received 25 April 2023
Page 6 of 16 Received 25 April 2023
Page 7 of 16 Received 25 April 2023
Page 8 of 16 Received 25 April 2023
Page 9 of 16 Received 25 April 2023
Page 10 of 16 Received 25 April 2023
Page 11 of 16 Received 25 April 2023
Page 12 of 16 Received 25 April 2023
Page 13 of 16 Received 25 April 2023
Page 14 of 16 Received 25 April 2023
Page 15 of 16 Received 25 April 2023
Page 16 of 16 Received 25 April 2023
File details come from the government source that posted it. Updated .