This document contains questions and answers regarding solicitation number 140P2024R0012 for bridge abutment repairs on two bridges located in a national park. The solicitation involves repairing the abutments of Kirby Bridge and Turkey Bridge through replacing deteriorated wood with helical piles. Bids are due by December 6th, 2023 and will be evaluated by the National Park Service. Access to both bridge sites requires all-terrain vehicles or smaller SUVs due to weight restrictions on the bridges and narrow trails. Staging areas near the bridge locations must be approved in advance.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0012 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

BITH 24448411/28/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/26/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment 0002 is to answer questions in regard to the specification. All proposals are due to the Contract Specialist Rachel Dyer at Rachel_Dyer@nps.gov by 3:00pm

Mountain Time.

NPS PM/COR: Darin Thacker

NPS CO/CS: Name: Rachel Dyer

See questions and answers below. They are answered as an attachment as well.

Q1. Both Kirby and Turkey Bridges were accessed by remote roads. The road that accesses the

Turkey Bridge area will need to be accessed using 4-wheel drive vehicle. From there on both

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rachel Dyer

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0012/0002 bridges, we hiked down a small access road and trail to arrive at the bridge. Either small SUVS, UTV¿s, or other motorized equipment will be mandatory to use in gaining access and moving in equipment. Is this acceptable to the NPS?

A1. Kirby Bridge requires access over existing trails, boardwalks, and bridges. As stated in the documents, the max loading for the bridges are

5,000 lbs and the width is also restricted to smaller vehicles. Smaller UTVs and SUVs will be acceptable. The use of 4x4 vehicles is acceptable for the Turkey Bridge access.

Q2. On many other NPS projects, we have a

Superintendent that also acts as the SSHO and QCM for the work. As required in the specs a QC is brought in by manufacture on major items like the helical piles. However, may we have our superintendent dual hat positions in order to reduce yours and our cost?

A2. The Superintendent may also double up as the safety manager. The QCM will need to be a separate individual.

Q3. Both access roads and trails had branches and fallen trees on them. Will the park be sure the roads and access trails are clear before work begins? If not, can we clear items in the way?

A3. The majority of the clearing for construction access will be the responsibility of the contractor. All areas should be staked for approval prior to any clearing/removals.

Q4. Where would you like us to stage material? I did not see that addressed in the plans. Where we parked the vehicles near turkey bridge, an area that seems suitable for staging existed. May we stage material there?

A4. That area is a likely location. Staging areas will need to be approved prior to any material staging or construction.

Q5. The due date for this bid is Monday the 27th.

That is the Monday after Thanksgiving. Is it possible to extend this bid since we will not be able to get subcontractors bids in over the

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0012/0002

Thanksgiving weekend? Maybe we could push just long enough that we can get our subs bids and then in turn add them to our bid.

A5. This has been extended to Dec 6th, 2023.

Q6. Do you have any information you can share that shows the average water level of the rivers from month to month? If there is typically a high-water mark time of year, we will want to avoid that time.

A6. The water level of the rivers varies based on rainfall events. Generally, the levels are low at this time of year and through the early Spring.

Hurricane season starts in June and can have an effect of the water levels. All efforts should be taken to complete the in-stream and near stream work while the water levels are low.

Q7. Over the 6-month period of performance, is it anticipated that the river will be running high?

(At the time of the site visit, it was fairly low.)

A7. The water level of the rivers varies based on rainfall events. Generally, the levels are low at this time of year and through the early Spring.

Hurricane season starts in June and can have an effect of the water levels. All efforts should be taken to complete the in-stream and near stream work while the water levels are low.

OTHER ITEMS TO NOTE

¿ Sheet S3 details the access to both bridge locations. They are weight and width restricted.

¿ An accurate schedule is an important part of the bid package to be able to coordinate the access through the private lumber company property.

¿ Note #1 on sheet S10 indicates the helical pier requirements for final design by the helical pier supplier. Prior approval is necessary before any construction.