This Statement of Work details equipment rental requirements for Yellowstone National Park's FY 25 Special Projects Roads program. The solicitation calls for renting two Hamm HP 280i pneumatic rollers and one Wirtgen W150XFi cold asphalt milling machine for the 2025 summer construction season, with specific technical requirements including maximum weights, engine specifications, and operational features. The equipment must be no older than 5 years, have fewer than 2,000 operating hours, and include provisions for rapid repairs within 48 hours and manufacturer-recommended preventative maintenance.
The rental period spans from July 1, 2025, to August 30, 2025, for the rollers and July 1, 2025, to October 31, 2025, for the milling machine. An additional requirement is 32 hours of operator training, with at least 16 hours conducted on-site with the Special Projects crew at Yellowstone National Park, covering up to 6 operators. The contractor will be responsible for all repairs resulting from proper use, with wear parts to be purchased by Yellowstone National Park, and the National Park Service will cover expenses for damages from misuse or accidents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment_2_-_DOL_Wage_Determination_2015-5407_R24_12232024.pdf | ||
| Sol_140P1425Q0033.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Yellowstone National Park Special Projects Roads FY 25 Equipment Rental
Description:
Yellowstone National Park requires the rental of two pneumatic compactors and one cold asphalt milling machine for the 2025 summer construction season meeting the following requirements.
This requirement shall also include operator training for the proper operation of the asphalt mill.
1) Pneumatic Rollers:
Quantity 2 - Hamm HP 280i pneumatic rollers or equal machine
Roller Compactors Salient Characteristics:
• Service brake and Emergency brake
• Pressurized water spray system, spray nozzle one per tire
• Fuel type Diesel.
• Transporting weight maximum 21,000 LB
• With Maximum operating weight with ballasting 62,000 LB
• Tire overlap when straight inches 2 inches
• Overall width 78-82 inches
• Rated Gross engine horsepower minimum 2000 rpm 100 HP minimum
• Best available technology Tier group Diesel power plant
• Water (spray) Tank capacity. Minimum 100 gallons.
• Tire wetting system solvent emulsion system 5 gallon
• Transmission type two speed Hydrostatic
• Speed high minimum 11 MPH
• Back up alarm
• Multi position operator station
• Suspension seat with seat belt and arm rest
• Sun canopy attached to the ROPS
• Front and rear work lights including taillights and parking lights with flashers
• Work lights front and rear
• Full instrumentation panel minimum requirements: Water Temp, Oil Pressure, Voltmeter, Tachometer, Hour Meter, Fuel Gauge, Hydraulic Temp, and Back up alarm
• Federal and State roll over protection with seat belt. shall meet DOT requirements
• Roof mounted rotating amber beacon lights. Four-way flashers and turn signals
• Machines shall be no older than 5 years and not have more than 2000 operating hours at the start of rental.
• All repair work shall be completed within 48 hours of notification at no additional cost to Yellowstone national park. If the 48-hour time frame cannot be met a replacement roller shall be provided at no additional cost to Yellowstone National Park
• PM’s will be performed by the dealer at manufacturers suggested intervals
• Damage resulting from miss-use, accident, etc. will be repaired at the expense of the National Park Service.
Month is defined as 1 calendar month and may be 30-31 days in length as determined by the calendar
• Period of performance: 07/01/2025-08/30/2025
2) Cold Asphalt Milling Machine:
Quantity 1 - Wirtgen W150XFi or equal machine
Cold Asphalt Milling Machine Salient Characteristics:
• Front discharge Conveyor
• Overall Length Maximum 45ft 9 in
• Width minimum 7 ft 9 in
• Transporting weight maximum 46,000 LB
• Fuel type Diesel.
• Back up alarm.
• Full instrumentation panel minimum requirements: Water Temp, Oil Pressure, Voltmeter, Tachometer, Hour Meter, Fuel Gauge, Hydraulic Temp, and Back up alarm
• Rated Gross engine horsepower minimum 400 HP
• Best available technology Tier group Diesel power plant
• Working Speed 0-131 ft/min
• Travel Speed 0-410 ft/min
• Water tank capacity (minimum) 500 gal
• Cutting width (minimum) 4’11 to 6ft
• Discharge belt slewing angle 60 degrees right and left
• Rapid slope cross slope sensor
• 4 track drive with anti-slip control
• Automatic Engine speed control
• Sun canopy attached to the ROPS
• Work lights front and rear
• Level Pro Plus leveling system left and right (parallel to surface capability)
• Federal and State roll over protection with seat belt. shall meet DOT requirements
• Roof mounted rotating amber beacon lights. Four-way flashers and turn signals
• Front and rear work lights including taillights and parking lights with flashers
• Machines shall be no older than 5 years and not have more than 2000 operating hours at the start of rental.
• All repair work shall be completed within 48 hours of notification at no additional cost to Yellowstone
National Park. If the 48-hour time frame cannot be met a replacement roller shall be provided at no additional cost to Yellowstone National Park
• PM’s will be performed by the dealer at manufacturers suggested intervals
• Wear part will be purchased by Yellowstone National Park
• Damage resulting from miss-use, accident, etc. will be repaired at the expense of the National Park Service.
Month is defined as 1 calendar month and may be 30-31 days in length as determined by the calendar
• Period of performance: 07/01/2025-10/31/2025
Operator Training for Asphalt Mill:
• Contractor shall provide 32 hours of operator training on cold milling machine, preferably with at least 16 hours being on site with the Special Projects crew in Yellowstone National Park for up to 6 Operators.