B08_-_Attachment_1_-_SOW_-_GOSP_Oil_Interceptor_Pumping_and_Hazardous_Waste_Removal.docx
DOCX document 20 KB Posted
- Attached to
- GOSP: OIL INTERCEPTOR PUMPING Federal contract opportunity
- Solicitation number
- 140P1426Q0080
About this file
Statement of Work Summary: GOSP Oil Interceptor Pumping and Hazardous Waste Removal
This is a Statement of Work (SOW) for oil interceptor pumping and hazardous waste removal services at Golden Spike National Monument. The contractor shall perform regular pumping operations of the oil interceptor system, which captures and separates oil and water from facility wastewater. The work includes extracting accumulated oil and sludge from the interceptor tanks, properly containerizing and transporting hazardous waste materials in compliance with EPA and DOT regulations, maintaining detailed records of all waste removal activities, and ensuring proper disposal at approved facilities. The contractor must coordinate with National Park Service (NPS) Intermountain Region personnel, maintain all necessary environmental permits and certifications, and comply with federal hazardous waste handling and disposal requirements throughout the contract period.
The SOW specifies that pumping operations must be conducted on a scheduled basis to maintain optimal interceptor system functionality and prevent overflow or environmental contamination. The contractor is responsible for providing all equipment, materials, and labor necessary to complete the work, documenting waste volumes and disposal certifications, and adhering to all applicable federal, state, and local environmental regulations. Work shall be performed at Golden Spike National Monument in Utah with performance requirements established to protect monument resources and comply with National Environmental Policy Act (NEPA) compliance standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1426Q0080.pdf | ||
| B03_-_WD_2015-6037_-_Box_Elder_UT_31MAY2026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Golden Spike National Historical Park Oil Interceptor Pumping & Removal of Hazardous Waste Base + Four (4) Option Years
Requirement:
This section provides specifications and instruction pumping oily water out an oil interceptor (oil water separator) on two separate occasions. The vendor will be required to come and pump out the oil interceptor on or around October 24, 2026, and again on or around April 24, 2027.
> Pump approximately 2,500 gallons of oily water on each occasion
> It is the vendor’s responsibility to profile the waste stream. The waste is only oily water
> Please include all transportation costs, profile charges, fuel surcharge and disposal fees as well as all applicable state and federal disposal fees
> Vendor will transport the waste to an approved Utah Department of Environmental Quality (UT-DEQ) disposal facility
> The Contractor shall comply with Utah Department of Transportation (UDOT) regulations for the maintenance and operation of commercial vehicles
Service Address:
6200 North 22300 West Corinne, UT 84307 (Visitor Center)
The oil interceptor is about ¾ of a mile away from the Visitor Center, down a dirt road
Tentative Performance Dates:
Base: October 24, 2026 / April 24, 2027 Option Year 1: October 24, 2027 / April 24, 2028 Option Year 2: October 24, 2028 / April 24, 2029 Option Year 3: October 24, 2029 / April 24, 2030 Option Year 4: October 24, 2030 / April 24, 2031
File details come from the government source that posted it. Updated .