About this file
This file is Attachment 1 to a federal contract solicitation, containing photographs and dimensional diagrams of the current seabird theater exhibit at a visitor center facility.
The seabird theater is an immersive display space featuring three independent projectors that project onto wall-mounted screens. The exhibit measures approximately 109" to 117" in width and 18" to 24" in depth, with an entrance located at 18" from one corner. The space is currently very dark, and the originally scheduled color lighting system is non-functional. The theater is accessed through an adjacent exhibit (orange star on the layout diagram), and the behind-the-scenes area contains projectors, mylar mirrors, storage, equipment controlling other visitor center exhibits, and an electrical panel (blue star) that requires clear access space. The behind-the-scenes area will be expanded as part of the project scope. Current electronics running all visitor center exhibits are located in this back area and will need to be physically relocated 5-10 feet but not permanently removed. Photographs document the entrance, projection screens, display rocks/formations, and the behind-scenes infrastructure including the equipment rack, electrical panel, and mirror systems. The facility layout diagram provides approximate dimensions and clearly marks the locations of the electrical panel and current access point for maintenance purposes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
Photos of the current seabird theater. June 2026
Entrance to the seabird theater.
Three independent projectors project to screens on the walls.
Note these projectors are currently behind the display wall.
Images of behind the scenes are below.
Two projectors on the ceiling projectors on the floor.
Overall, this space is very dark and original scheduled color lighting doesn’t work.
Attachment 1 Photos of Exhibit 1
Attachment 1 Photos of Exhibit 2
Photos behind the seabird theater. This area will be expanded into for the project. This area contains the projectors, the mylar mirrors, storage, and equipment running the rest of the exhibits.
Left image is the entrance to behind the seabird exhibit (from the right as looking from entrance of the exhibit).
Right image is the current electronics running all the exhibits in the visitor center. This will need physically moved over (5-10 feet) but not permanently removed.
Left image behind the seabird exhibit showing the left wall with the projector and right wall with the mylar mirror.
Right image shows the middle panel behind the seabird exhibit.
Attachment 1 Photos of Exhibit 3
Top image is behind the middle panel of the seabird exhibit. Left wall of the image show the screen with projector below. Right wall shows the mylar mirror.
Bottom image shows the left panel of the seabird exhibit. The middle of the image shows the electrical panel which will need a clear area around it and access.
Attachment 1 Photos of Exhibit 4
Approximate sizes of the current layout of the seabird theater.
109”
Blue star is electrical panel that needs access and space around it.
Orange star is current access to behind the seabird exhibit. Access is via the next exhibit over.
Attachment 1 Photos of Exhibit 5
| Attachment 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
File details come from the government source that posted it. Updated .